Housing violations · East Flatbush-Farragut
1417 New York Avenue, Brooklyn
11210 · 42 apartments · 6 stories · City Council district 45
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks11
- Other repairs8
- Peeling paint and plaster8
- Mold7
- Leaks and water damage4
- Plumbing, sinks and toilets3
- Missing smoke or CO detector2
- Lead paint2
- Roaches2
- No heat or hot water1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 35 closed · NYC typical: 87 days
from 27 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19368485
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19368486
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge in the entranceIssued Nov 12, 2026 · fix by Nov 26, 2026 · Violation #19368487
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368488
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368489
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340685
- COther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19340679
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porclain enamel glaze at bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340683
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340678
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the cieling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340681
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at cieling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340682
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 1st room from northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340677
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340686
- BOther repairsProperly repair or replace the broken or defective counterbalance at 2nd window lower window sash in the 1st room from northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340680
- CPlumbing, sinks and toiletsReplace the broken or defective bathtub in the bathroomIssued Sep 2, 2026 · fix by Sep 8, 2026 overdue · rent impairing · Violation #19182149
- BOther repairsRefit lower sash window, 2nd window from west at north in the 1st room from eastIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151565
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19135053
- BBroken doors or locksProperly repair with similar material the broken or defective wood base cabinet door at west wall in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125105
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at westIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125114
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at westIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125115
- BOther repairsProperly repair or replace the broken or defective sring balance at west 2 window upper window sash in the 3rd room from north at westIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125116
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at westIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125119
- BBroken doors or locksProperly repair or replace the broken or defective latch assembly at entrance door at compactor closet, 3rd storyIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125134
- BBroken doors or locksProperly repair or replace the broken or defective latch assembly at entrance door at compactor closet, 1st storyIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125139
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125107
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125106
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125125
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jun 1, 2026 · fix by Jun 25, 2026 overdue · Violation #18975201
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 1, 2026 · fix by Jun 27, 2026 overdue · Violation #18966900
- CLead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued Jun 1, 2026 · fix by Jun 25, 2026 overdue · Violation #18975271
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 1, 2026 · fix by Jun 27, 2026 overdue · Violation #18966901
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 4, 2026 · fix by May 18, 2026 overdue · Violation #18826210
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 6, 2026 · fix by Apr 12, 2026 overdue · Violation #18764025
- BBroken doors or locksProperly repair or replace the broken or defective door latch at compactor closet, 1st storyIssued Sep 18, 2025 · fix by Oct 23, 2025 overdue · Violation #18236016
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 21, 2021 · fix by Jun 16, 2021 overdue · Violation #14349494
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Jan 4, 2006 · fix by Jan 30, 2006 overdue · Violation #5923165
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.