Housing violations · Hamilton Heights-Sugar Hill
3621 Broadway, Manhattan
10031 · 48 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint33
- Roaches16
- Other repairs12
- Mold11
- Broken doors or locks10
- Mice or rats6
- Peeling paint and plaster5
- Electrical problems1
- Leaks and water damage1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 67 closed · NYC typical: 87 days
from 136 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Nov 16, 2026 · Violation #19377664
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Nov 16, 2026 · Violation #19377667
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Nov 16, 2026 · Violation #19377723
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Nov 16, 2026 · Violation #19377733
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the compactor closetIssued Nov 16, 2026 · Violation #19377769
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 4th story balcony, at 1st stack from…Issued Nov 16, 2026 · Violation #19377802
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the boiler roomIssued Nov 16, 2026 · Violation #19377792
- BOther repairsProperly repair or replace the broken or defective latch set in the compactor closetIssued Nov 16, 2026 · Violation #19377771
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the compactor closetIssued Nov 16, 2026 · Violation #19377194
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the compactor closetIssued Nov 16, 2026 · Violation #19377203
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 16, 2026 · Violation #19377211
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the compactor closetIssued Nov 16, 2026 · Violation #19377215
- BOther repairsProperly repair or replace the broken or defective latch set in the compactor closetIssued Nov 16, 2026 · Violation #19377217
- BOther repairsProperly repair or replace the broken or defective latch set in the compactor closetIssued Nov 16, 2026 · Violation #19377219
- BOther repairsProperly repair or replace the broken or defective latch set in the compactor closetIssued Nov 16, 2026 · Violation #19377220
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch setIssued Nov 16, 2026 · Violation #19377228
- BOther repairsProperly repair or replace the broken or defective latch setIssued Nov 16, 2026 · Violation #19377229
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Nov 16, 2026 · Violation #19377627
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Nov 16, 2026 · Violation #19377641
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19226578
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19226583
- BElectrical problemsProperly repair or replace the broken or defective electical outlet cover at east wall in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19226580
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 1st bathroom from northIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19195511
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19171665
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19171666
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070767
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 30, 2026 · fix by Apr 25, 2026 overdue · Violation #18745715
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square at ceiling in the bathroomIssued Feb 3, 2026 · fix by Mar 10, 2026 overdue · Violation #18623212
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at ceiling and all walls in the bathroomIssued Oct 20, 2025 · fix by Nov 15, 2025 overdue · Violation #18304435
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2025 · fix by Nov 15, 2025 overdue · Violation #18304441
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · Violation #18271749
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the private hallwayIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18178396
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at west wall at closet in the foyerIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18190762
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Aug 25, 2025 · fix by Aug 29, 2025 overdue · Violation #18186245
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Aug 25, 2025 · fix by Aug 29, 2025 overdue · Violation #18186244
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 5, 2025 · fix by May 31, 2025 overdue · Violation #17868946
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 12, 2025 · fix by Mar 8, 2025 overdue · Violation #17692498
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 3, 2025 · fix by Feb 27, 2025 overdue · Violation #17675229
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 3, 2025 · fix by Feb 27, 2025 overdue · Violation #17675232
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 3, 2025 · fix by Feb 27, 2025 overdue · Violation #17675231
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 3, 2025 · fix by Feb 27, 2025 overdue · Violation #17675230
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 28, 2025 · fix by Feb 23, 2025 overdue · Violation #17655469
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 28, 2025 · fix by Feb 23, 2025 overdue · Violation #17655456
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 28, 2025 · fix by Feb 23, 2025 overdue · Violation #17655449
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 28, 2025 · fix by Feb 23, 2025 overdue · Violation #17655462
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 25, 2024 · fix by Dec 21, 2024 overdue · Violation #17440230
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at south wall , east wall and ceiling in the 2nd bathroom from eastIssued Nov 25, 2024 · fix by Dec 21, 2024 overdue · Violation #17440232
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 1, 2024 · fix by Nov 25, 2024 overdue · Violation #17392708
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 31, 2024 · fix by Nov 24, 2024 overdue · Violation #17392267
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 31, 2024 · fix by Nov 24, 2024 overdue · Violation #17392265
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 31, 2024 · fix by Nov 24, 2024 overdue · Violation #17392268
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 22, 2024 · fix by Nov 17, 2024 overdue · Violation #17368840
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 22, 2024 · fix by Nov 17, 2024 overdue · Violation #17368842
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from eastIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17136829
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 25, 2024 · fix by Aug 20, 2024 overdue · Violation #17136845
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 25, 2024 · fix by Aug 18, 2024 overdue · Violation #17143127
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 25, 2024 · fix by Aug 18, 2024 overdue · Violation #17143124
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 8, 2024 · fix by Aug 3, 2024 overdue · Violation #17101929
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 8, 2024 · fix by Aug 3, 2024 overdue · Violation #17101930
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 26, 2024 · fix by Jul 22, 2024 overdue · Violation #17079383
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.