Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East New York-New Lots

510 Riverdale Avenue, Brooklyn

11207 · 22 apartments · 4 stories · City Council district 42

By · Updated · Data from NYC HPD

C
71open immediately hazardous violations · 323 per 100 apartments
B122Hazardous, open
A23Non-hazardous, open
!210Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyRiverdale Properties LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    61
  2. Peeling paint and plaster
    48
  3. Mice or rats
    20
  4. Broken doors or locks
    19
  5. Leaks and water damage
    18
  6. Plumbing, sinks and toilets
    16
  7. Roaches
    11
  8. Mold
    11
  9. Electrical problems
    8
  10. No heat or hot water
    3
  11. Missing smoke or CO detector
    2
  12. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C183 days
from 130 closed · NYC typical: 87 days
B274 days
from 164 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19310291
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelainglaze at bathtub in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19310287
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19310290
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak concealed leak at ceiling and west wall in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19310292
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19310293
  • C
    Other repairsProperly repair or replace the broken or defective detached radiator at west wall in the 1st room from east at southIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19310280
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling and north wall in the bathroomIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19220452
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at north wall and ceiling in the bathroomIssued Sep 11, 2026 · fix by Oct 7, 2026 overdue · Violation #19214353
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at walls in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18777282
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18777268
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 9, 2026 · fix by May 5, 2026 overdue · Violation #18777263
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 9, 2026 · fix by Apr 15, 2026 overdue · Violation #18777259
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 9, 2026 · fix by May 5, 2026 overdue · Violation #18777266
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18777366
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18777271
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq ft at ceiling in the bathroomIssued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18550279
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft. at ceiling and south wall in the bathroomIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18536754
  • B
    Other repairsReplace with new the missing light fixture cover at ceiling in the 2nd room from eastIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18499765
  • B
    Other repairsReplace with new the missing light fixture cover at ceiling in the bathroomIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18499763
  • B
    Other repairsReplace with new the missing light fixture cover at ceiling in the kitchenIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18499749
  • B
    Other repairsReplace with new the missing light fixture cover at ceiling in the 4th room from eastIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18499767
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Dec 9, 2025 · fix by Dec 15, 2025 overdue · Violation #18499744
  • C
    Other repairsProperly repair with similar material the broken or defective 6 concrete window sill at south exteiror wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229453
  • C
    Other repairsProperly repair with similar material the broken or defective 10 metal lintels at east exteiror wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229437
  • C
    Other repairsProperly repair with similar material the broken or defective brick and mortar at east exterior wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229434
  • C
    Other repairsProperly repair with similar material the broken or defective 14 metal lintels at north exteiror wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229442
  • C
    Other repairsProperly repair with similar material the broken or defective brick and mortar at west exterior wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229460
  • C
    Other repairsProperly repair with similar material the broken or defective brick and mortar at south exterior wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229449
  • C
    Other repairsProperly repair with similar material the broken or defective concerte window sill 1st and 3rd window form north at west exterior wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229472
  • C
    Other repairsProperly repair with similar material the broken or defective brick and mortar at west exterior wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229461
  • C
    Other repairsProperly repair with similar material the broken or defective brick and mortar at east exterior wallIssued Sep 16, 2025 · fix by Sep 22, 2025 overdue · Violation #18229457
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 4, 2025 · fix by Sep 18, 2025 overdue · Violation #18201360
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door in the 3rd room from northIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201357
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201363
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from northIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201371
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light switch at north wall in the 1st room from northIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201373
  • B
    Other repairsProperly repair with similar material the broken or defective porcelain enamel finish method by reglazing at bath tub in the bathroomIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201369
  • B
    Leaks and water damageRepair the leaky and/or defective faucets bath tub in the bathroomIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201367
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color approx 6sq ft of unkeyed plastered at ceiling in the 3rd room from northIssued Sep 4, 2025 · fix by Sep 10, 2025 overdue · Violation #18201355
  • B
    Other repairsProperly repair with similar material the broken or defective caulking around bath tub in the bathroomIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201368
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door at entrance in the bathroomIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201370
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18201366
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the entire apartmentIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18201346
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18201335
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock and assembly in the entranceIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18201344
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 2, 2025 · fix by Sep 28, 2025 overdue · Violation #18201340
  • B
    Other repairsRemove all encumbrances consisting of wires at 2nd story balcony, at east exterior fire escapeIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · rent impairing · Violation #18193505
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18193462
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from northIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18193485
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2025 · fix by Sep 22, 2025 overdue · Violation #18193489
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the kitchenetteIssued Aug 27, 2025 · fix by Sep 2, 2025 overdue · Violation #18193498
  • B
    Other repairsRemove all encumbrances consisting of antenna at 3rd story balcony at east exterior fire escapeIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · rent impairing · Violation #18193510
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north at westIssued Jul 30, 2025 · fix by Sep 3, 2025 overdue · Violation #18126458
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at the ceiling in the kitchenIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17938877
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north, south and west wall in the kitchenIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17938875
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the bathtub in the bathroomIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17938870
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at ceiling and west wall in the bathroomIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17800722
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 15 sq feet at west and south wall in the kitchenIssued Mar 27, 2025 · fix by May 1, 2025 overdue · Violation #17792006
  • B
    Plumbing, sinks and toiletsProperly secure the loose faucet and shower body at bathtub in the bathroomIssued Mar 27, 2025 · fix by May 1, 2025 overdue · Violation #17792027
  • C
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire over electrical meter located in the cellar , section ''east''Issued Feb 25, 2025 · fix by Mar 3, 2025 overdue · Violation #17715896

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

222017
2812018
682019
602020
1502021
512022
1272023
2672024
1152025
182026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,457 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.