Housing violations · East New York (North)
350 Sheffield Avenue, Brooklyn
11207 · 65 apartments · 6 stories · City Council district 42
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster7
- Mice or rats6
- Broken doors or locks6
- Leaks and water damage4
- Mold4
- Other repairs4
- Plumbing, sinks and toilets3
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 12 closed · NYC typical: 87 days
from 18 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19263163
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline in wash basin in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19118704
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19118699
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line in bathtub in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19118705
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19118701
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19118698
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19118700
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19118703
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north at westIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19096763
- BBroken doors or locksProperly repair or replace the broken or defective door in the entrance in the 2nd room from northIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19096760
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 16, 2026 · fix by Jul 12, 2026 overdue · Violation #19001964
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 3rd room from north at westIssued May 27, 2026 · fix by Jul 1, 2026 overdue · Violation #18956610
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from north at westIssued May 27, 2026 · fix by Jul 1, 2026 overdue · Violation #18956607
- BBroken doors or locksProperly secure the loose entrance door hinges in the 2nd room from north at westIssued May 27, 2026 · fix by Jul 1, 2026 overdue · Violation #18956609
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 1, 2025 · fix by Dec 27, 2025 overdue · Violation #18469677
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17728185
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728184
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the west wall in the 3rd room from north at westIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728196
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallwayIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728181
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 3, 2025 · fix by Mar 29, 2025 overdue · Violation #17728182
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective rotted wood base sink cabinet in the kitchenIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728183
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 3rd bathroom from north at eastIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728188
- BOther repairsProperly repair or replace the broken or defective ventilation system at east wall in the 3rd bathroom from north at eastIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728189
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 3, 2025 · fix by Mar 29, 2025 overdue · Violation #17728191
- BOther repairsProperly repair or replace the broken or defective ventilation system at south wall in the 2nd bathroom from north at eastIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728192
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd bathroom from north at eastIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728193
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from north at westIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17728195
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 20, 2024 · fix by Jun 15, 2024 overdue · Violation #16979805
- CMoldTrace and repair the source and abate the visible mold condition approximately 40 sq ft at ceiling, 20 sq ft at north wall and 20 sq ft at east wall in the…Issued Apr 5, 2024 · fix by May 1, 2024 overdue · Violation #16793174
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and all walls in the entire bathroom, approx. 8 sq. ft. in the 1st bathroom from…Issued Oct 13, 2020 · fix by Nov 17, 2020 overdue · Violation #13853608
- CMoldTrace and repair the source and abate the visible mold condition at ceiling and all walls in the entire bathroom, approx. 30 sq. ft. in the 2nd bathroom from…Issued Jun 12, 2020 · fix by Jul 8, 2020 overdue · Violation #13691202
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.