Housing violations · Kingsbridge-Marble Hill
3045 Godwin Terrace, Bronx
10463 · 73 apartments · 6 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster11
- Other repairs9
- Leaks and water damage3
- Lead paint2
- Plumbing, sinks and toilets1
- Roaches1
- Mold1
- Missing window guards1
- Broken doors or locks1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 169 closed · NYC typical: 87 days
from 144 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224899
- CPlumbing, sinks and toiletsProperly secure the loose formica countertop at sink in the kitchenIssued Sep 18, 2026 · fix by Sep 24, 2026 overdue · Violation #19224894
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224896
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224895
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the 2nd room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224893
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19224891
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city…Issued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19224897
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224898
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at roof door at 1st public hall bulkhead from north, 6th storyIssued Nov 19, 2025 · fix by Dec 3, 2025 overdue · Violation #18378511
- COther repairsProperly repair or replace the broken or defective glass pane at skylight at 1st public hall bulkhead from north, 6th storyIssued Jul 23, 2025 · fix by Jul 29, 2025 overdue · Violation #18110889
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18080671
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18066623
- COther repairsProvide an adequate supply of gas to the fixtures at range in the entire apartmentIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · rent impairing · Violation #17619447
- CLead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued Nov 27, 2024 · fix by Dec 21, 2024 overdue · Violation #17465560
- BOther repairsProperly repair with similar material the broken or defective repair vertical crack, bulging mortar joints at 6th story, from east at exterior front building.…Issued Jul 17, 2024 · fix by Aug 21, 2024 overdue · Violation #17124915
- BOther repairsProperly repair with similar material the broken or defective brick and mortar joints at 5th and 6th story fascade at building front , section ''south''Issued Apr 12, 2024 · fix by May 17, 2024 overdue · Violation #16849630
- BOther repairsProperly repair with similar material the broken or defective brick and mortar at building front .by firescape north section , 4th storyIssued Apr 5, 2024 · fix by May 10, 2024 overdue · Violation #16790619
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 16, 2014 · fix by Feb 13, 2014 overdue · Violation #10096918
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.