Housing violations · Clinton Hill
200 Waverly Avenue, Brooklyn
11205 · 96 apartments · 12 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building has fewer.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs11
- Peeling paint and plaster8
- Broken doors or locks6
- Missing smoke or CO detector4
- Mold3
- Leaks and water damage2
- Mice or rats2
- Roaches1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
NYC typical: 84 days
from 1 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition approximately 10 sq.ft. observed at north and east walls and ceiling in the 1st room from eastIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202462
- COther repairsProperly repair with similar material the broken or defective ceramic wall tiles at east and south walls in the bathroomIssued Sep 9, 2026 · fix by Sep 15, 2026 overdue · Violation #19202463
- BOther repairsProperly repair with similar material the broken or defective wood floor tiles in the 1st room from eastIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202469
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202468
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202467
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 9, 2026 · fix by Oct 5, 2026 overdue · Violation #19202466
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at closet in the private hallwayIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202465
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at closet in the private hallwayIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202464
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at south wall , east wall and east wall at south closet in the 1st room…Issued Jul 27, 2026 · fix by Aug 22, 2026 overdue · Violation #19105144
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall at south closet in the 1st room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18951340
- BOther repairsProperly repair with similar material the broken or defective marble saddle at entrance in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18951342
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in south closet in the 1st room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18951339
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18951343
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north and east wall in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18951338
- BMice or ratsAbate the nuisance consisting of miceIssued Feb 6, 2013 · fix by Mar 13, 2013 overdue · Violation #9726480
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued Feb 6, 2013 · fix by Mar 13, 2013 overdue · Violation #9725690
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperableIssued Feb 6, 2013 · fix by Mar 13, 2013 overdue · Violation #9725691
- BOther repairsReplace with new the missing ceramic tiles at east wall in the bathroomIssued Feb 6, 2013 · fix by Mar 13, 2013 overdue · Violation #9725693
- BMoldTrace and repair the source and abate the nuisance consisting of mold at walls and ceiling 12 sq.ft. in the bathroomIssued Feb 6, 2013 · fix by Mar 13, 2013 overdue · Violation #9725692
- BOther repairsProperly repair the broken or defective parquetry flooring at radiator dry-rotted with gaps in the 1st room from north at eastIssued Feb 6, 2013 · fix by Mar 13, 2013 overdue · Violation #9725689
- BPeeling paint and plasterD26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color wall around window frame 12 sty northeastIssued Aug 7, 2008 · fix by Sep 11, 2008 overdue · Violation #3315993
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls at the interior of closets in the entire apartmentIssued Apr 16, 2004 · fix by May 26, 2004 overdue · Violation #4924460
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartmentIssued Apr 16, 2004 · fix by May 26, 2004 overdue · Violation #4924444
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective enamel porclain glaze surface of the bathtub in the bathroomIssued Apr 16, 2004 · fix by May 26, 2004 overdue · Violation #4924473
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls & ceilings bathroom 1 sty south at westIssued Sep 10, 2003 · fix by Oct 20, 2003 overdue · Violation #3316032
- BMice or ratsAbate the nuisance consisting of vermin mice and roaches at entire apartment, 1st story, apartmentIssued Sep 10, 2003 · fix by Oct 20, 2003 overdue · Violation #3632867
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls private hall 1 sty northwestIssued Sep 10, 2003 · fix by Oct 20, 2003 overdue · Violation #3316051
- BBroken doors or locksReplace with new the broken or defective corroded door jamb bathroom 1 sty south at westIssued Sep 10, 2003 · fix by Oct 20, 2003 overdue · Violation #3316034
- BOther repairsProperly repair with similar material the broken or defective buckling wood parquet floor in the 4th room from northIssued Sep 10, 2003 · fix by Oct 20, 2003 overdue · Violation #4584789
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 28, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.