Housing violations · Astoria (North)-Ditmars-Steinway
21-58 35 Street, Queens
11105 · 39 apartments · 4 stories · City Council district 22
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint17
- Broken doors or locks13
- Roaches3
- Plumbing, sinks and toilets3
- Other repairs2
- Mold2
- Peeling paint and plaster2
- Missing smoke or CO detector1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 23 closed · NYC typical: 87 days
from 30 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 25, 2025 · fix by Oct 21, 2025 overdue · Violation #18248976
- BLead paintProperly repair or replace the broken or defective latch at door leading to laundry room at basementIssued Aug 22, 2025 · fix by Sep 26, 2025 overdue · Violation #18175187
- BOther repairsProvide adequate light of not less than 60 watts incandescent or equivalent illumination . at public hall, 3rd storyIssued May 16, 2025 · fix by Jun 20, 2025 overdue · Violation #17895939
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Feb 4, 2025 · fix by Mar 11, 2025 overdue · Violation #17675814
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch on door in the entranceIssued Dec 23, 2024 · fix by Jan 6, 2025 overdue · Violation #17576712
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2024 · fix by Dec 8, 2024 overdue · Violation #17410989
- CBroken doors or locksProperly repair or replace the broken or defective glass pane on door at street entrance to building , section ''a-b''Issued Nov 7, 2024 · fix by Nov 13, 2024 overdue · Violation #17401421
- CBroken doors or locksProperly repair or replace the broken or defective glass pane at street entrance door to building at public hall, 1st story, section ''b/a''Issued Sep 16, 2024 · fix by Sep 22, 2024 overdue · Violation #17270446
- BMoldTrace and repair the source and abate the visible mold condition approximately 15 square feet at east wall in the 1st room from north at eastIssued May 15, 2024 · fix by Jun 19, 2024 overdue · Violation #16977208
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 15, 2024 · fix by May 29, 2024 overdue · Violation #16977213
- BBroken doors or locksProperly repair with similar material the broken or defective wood door saddle entrance in the bathroomIssued May 15, 2024 · fix by Jun 19, 2024 overdue · Violation #16977202
- CPlumbing, sinks and toiletsRepair the broken or defective connection sink waste line pipe in the kitchenIssued Mar 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16722363
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood floor within sink base cabinet in the kitchenIssued Mar 7, 2024 · fix by Apr 11, 2024 overdue · Violation #16722364
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock in the entranceIssued Mar 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16722362
- BBroken doors or locksProperly repair or replace the broken or defective door knob at apartment entrance door in the entranceIssued Jan 26, 2024 · fix by Mar 1, 2024 overdue · Violation #16618937
- BBroken doors or locksProperly repair with similar material the broken or defective composite wood door at north 2 room in the 2nd room from northIssued Jan 25, 2024 · fix by Feb 29, 2024 overdue · Violation #16618934
- BBroken doors or locksProperly repair or replace the broken or defective door in the 2nd room from north at eastIssued Dec 11, 2023 · fix by Jan 15, 2024 overdue · Violation #16513084
- CMoldTrace and repair the source and abate the visible mold condition all walls and ceiling approx 30 sqft in the bathroomIssued Dec 11, 2023 · fix by Jan 6, 2024 overdue · Violation #16513082
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 27, 2023 · fix by Jan 1, 2024 overdue · Violation #16440311
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead door to roof exit need spring adjustment , section ''ab'', 2nd from…Issued Nov 27, 2023 · fix by Dec 11, 2023 overdue · Violation #16440323
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440318
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440310
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440313
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440312
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440322
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440321
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440320
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440319
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 24, 2023 · fix by Dec 29, 2023 overdue · Violation #16440315
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Sep 22, 2023 · fix by Sep 26, 2023 overdue · Violation #16247879
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Sep 22, 2023 · fix by Sep 26, 2023 overdue · Violation #16247878
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock assembly at door at entranceIssued Jul 17, 2023 · fix by Jul 23, 2023 overdue · Violation #16095743
- BRoachesAbate the nuisance consisting of roachesIssued Jun 29, 2015 · fix by Aug 3, 2015 overdue · Violation #10764470
- BOther repairsReplace with new the broken or defective shut off valve at radiator in the 3rd room from north at eastIssued Dec 20, 2013 · fix by Jan 24, 2014 overdue · Violation #10071459
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 13, 2010 · fix by Jan 8, 2011 overdue · Violation #8728820
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 13, 2010 · fix by Jan 8, 2011 overdue · Violation #8728822
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 13, 2010 · fix by Jan 8, 2011 overdue · Violation #8728819
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 13, 2010 · fix by Jan 8, 2011 overdue · Violation #8728821
- BBroken doors or locksReplace or repair the self-closing doors that is missing or defective bulkhead door to roofIssued Aug 27, 2007 · fix by Oct 1, 2007 overdue · Violation #6898849
- BBroken doors or locksReplace or repair the self-closing doors that is missing or defective door ta bulkhead roofIssued Apr 8, 2005 · fix by May 18, 2005 overdue · Violation #5441452
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.