Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Kew Gardens Hills

153-15 75 Avenue, Queens

11367 · 12 apartments · 3 stories · City Council district 24

By · Updated · Data from NYC HPD

C
20open immediately hazardous violations · 167 per 100 apartments
B38Hazardous, open
A14Non-hazardous, open
!72Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyKEW GARDENS HILLS LLC
Landlord (head officer or owner)Donald Hastings

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    16
  2. Other repairs
    12
  3. Peeling paint and plaster
    11
  4. Leaks and water damage
    10
  5. Roaches
    7
  6. Plumbing, sinks and toilets
    7
  7. Mice or rats
    2
  8. Missing smoke or CO detector
    2
  9. Electrical problems
    2
  10. Mold
    1
  11. No heat or hot water
    1
  12. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

CNot enough data
NYC typical: 87 days
B100 days
from 13 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at east wall at intermediate landing below window at public hall stairs,…Issued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18998261
  • B
    Other repairsProperly repair with similar material the broken or defective 10th marble tread from bottom at public hall stairs, 1st storyIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18998260
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 4, 2026 · fix by Jun 18, 2026 overdue · Violation #18978555
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 4, 2026 · fix by Jun 30, 2026 overdue · Violation #18978548
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 4, 2026 · fix by Jun 30, 2026 overdue · Violation #18978549
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978550
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978551
  • B
    Electrical problemsProperly secure the loose electrical light fixture at ceiling at public hall, 2nd storyIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978558
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock installed on street entrance door to building , 1st storyIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18806991
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18711346
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18711345
  • B
    Other repairsProperly repair with similar material the broken or defective 10 th marble tread from bottom at public hall, 1st storyIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18711352
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze the bathtub in the bathroomIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18711347
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door at lobby, 1st storyIssued Mar 16, 2026 · fix by Mar 30, 2026 overdue · Violation #18711351
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18711350
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at building entrance , 1st storyIssued Nov 25, 2025 · fix by Dec 1, 2025 overdue · Violation #18428755
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste pipe at sink in the kitchenIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18428752
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base sink cabinet at south wall in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18294609
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 10, 2025 · fix by Nov 5, 2025 overdue · Violation #18287774
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from northIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18287775
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch, building entrance door at public hall, 1st storyIssued Oct 10, 2025 · fix by Oct 24, 2025 overdue · Violation #18287777
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18287776
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch ,building entrance door at public hall, 1st storyIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18287778
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at building entrance door , 1st storyIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18258704
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance , 1st storyIssued Oct 2, 2025 · fix by Oct 16, 2025 overdue · Violation #18258703
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18258699
  • B
    Broken doors or locksProperly repair or replace the broken or defective gasket at refrigerator lower door in the kitchenIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18258702
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18258700
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 1st room from north at westIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18258701
  • B
    Other repairsProperly repair with similar material the broken or defective 2nd marble tread , from top to bottom, at public hall stairs, 1st storyIssued Sep 8, 2025 · fix by Oct 13, 2025 overdue · Violation #18199847
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Sep 3, 2025 · fix by Oct 8, 2025 overdue · Violation #18199843
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 2nd room from north at eastIssued Sep 3, 2025 · fix by Oct 8, 2025 overdue · Violation #18199845
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the kitchenIssued Sep 3, 2025 · fix by Oct 8, 2025 overdue · Violation #18199839
  • B
    Leaks and water damageRepair the leaky and/or defective faucets bathtub in the bathroomIssued Sep 3, 2025 · fix by Oct 8, 2025 overdue · Violation #18199841
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and west wall in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17666597
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling, north and west wall in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17666598
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and east wall in the 1st room from north at westIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17666599
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling, north and east wall in the 1st room from north at westIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17666600
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 3, 2025 · fix by Mar 1, 2025 overdue · Violation #17666602
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17666601
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 16, 2024 · fix by Jan 11, 2025 overdue · Violation #17557393
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Dec 16, 2024 · fix by Dec 22, 2024 overdue · Violation #17557394
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 16, 2024 · fix by Dec 16, 2024 overdue · rent impairing · Violation #17557392
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective procelain enamel finish at bathtub by the method of reglazing in the bathroomIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17194732
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 19, 2024 · fix by Sep 2, 2024 overdue · Violation #17194735
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at south wall in the bathroomIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17194733
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 16, 2024 · fix by Sep 11, 2024 overdue · Violation #17194734
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures in the entire apartmentIssued Jul 2, 2024 · fix by Aug 6, 2024 overdue · Violation #17086167
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 2, 2024 · fix by Jul 28, 2024 overdue · Violation #17086168
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the bathroomIssued Jul 2, 2024 · fix by Aug 6, 2024 overdue · rent impairing · Violation #17086169
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall and ceiling in the bathroomIssued Jul 2, 2024 · fix by Aug 6, 2024 overdue · Violation #17086170
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 2, 2024 · fix by Jul 16, 2024 overdue · Violation #17086172
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak west wall in the bathroomIssued Jul 2, 2024 · fix by Aug 6, 2024 overdue · Violation #17086171
  • B
    BedbugsAbate the infestation consisting of bedbugsIssued Apr 21, 2022 · fix by May 26, 2022 overdue · Violation #15125180
  • C
    Mice or ratsAbate the infestation consisting of miceIssued Apr 21, 2022 · fix by May 17, 2022 overdue · Violation #15125174
  • C
    RoachesAbate the infestation consisting of roachesIssued Apr 21, 2022 · fix by May 17, 2022 overdue · Violation #15125175
  • B
    Other repairsProperly repair the broken or defective pilot light at gas range in the kitchenIssued Nov 8, 2021 · fix by Dec 13, 2021 overdue · Violation #14653661
  • B
    Broken doors or locksArrange and make self-closing the doors - in the entranceIssued Dec 19, 2018 · fix by Jan 23, 2019 overdue · Violation #9191228

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22017
12018
212021
72022
12023
132024
332025
352026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 128 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.