Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Elmhurst

40-19 79 Street, Queens

11373 · 16 apartments · 4 stories · City Council district 25

By · Updated · Data from NYC HPD

C
5open immediately hazardous violations · 31 per 100 apartments
B44Hazardous, open
A7Non-hazardous, open
!56Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company79TH STREET VENTURES, LLC
Landlord (head officer or owner)Gary Wollan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    16
  2. Peeling paint and plaster
    12
  3. Leaks and water damage
    9
  4. Mold
    7
  5. Plumbing, sinks and toilets
    6
  6. Lead paint
    3
  7. Roaches
    2
  8. Broken doors or locks
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C83 days
from 7 closed · NYC typical: 87 days
B138 days
from 13 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsProperly repair or replace the broken or defective intercom system from building entrance to the west wall in the kitchenIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129355
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the west wall in the 1st room from eastIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129352
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the east wall in the bathroomIssued Aug 12, 2026 · fix by Aug 18, 2026 overdue · Violation #19129353
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the bathroomIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19113043
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19113045
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19113046
  • B
    Other repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the 3rd room from eastIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19113063
  • B
    Broken doors or locksProperly repair or replace the broken or defective vestibule door latch at public hall, 1st storyIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19113070
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 30, 2026 · fix by Aug 25, 2026 overdue · Violation #19113034
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 23, 2026 · fix by Jul 29, 2026 overdue · Violation #19096753
  • B
    Other repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartmentIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19096756
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at window frame at north wall in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19072353
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19072352
  • B
    Other repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartmentIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039708
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039706
  • B
    Other repairsRefit lower sash window at 2 window from south at west wall in the 3rd room from eastIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039707
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze of bathtub in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039704
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and east wall in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039705
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705198
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705203
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705189
  • B
    Lead paintReplace with new the missing lock set at vestibule door leading to public hall , 1st storyIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705207
  • B
    Other repairsProperly repair with similar material the broken or defective grout at north wall ceramic tiles in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705202
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 13, 2026 · fix by Apr 8, 2026 overdue · Violation #18705195
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705188
  • B
    Other repairsProperly repair with similar material the broken or defective wood window frame at north wall in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705197
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705199
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and east wall in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705201
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18550886
  • B
    Other repairsRefit 2nd window from south at west in the 3rd room from eastIssued Sep 8, 2025 · fix by Oct 13, 2025 overdue · Violation #18204561
  • B
    Lead paintReplace with new the missing lock set at vestibule door leading to public hall , 1st storyIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204570
  • B
    Plumbing, sinks and toiletsReplace the broken or defective bathtub in the bathroomIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · rent impairing · Violation #18204563
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · rent impairing · Violation #18204566
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, and west wall in the bathroomIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204560
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective latch set at vestibule door leading to public hall , 1st storyIssued Sep 5, 2025 · fix by Sep 19, 2025 overdue · Violation #18204569
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroomIssued Feb 26, 2025 · fix by Apr 2, 2025 overdue · Violation #17719508
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from eastIssued Feb 26, 2025 · fix by Apr 2, 2025 overdue · Violation #17719511
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Feb 26, 2025 · fix by Apr 2, 2025 overdue · Violation #17719510
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the bathroomIssued Feb 26, 2025 · fix by Apr 2, 2025 overdue · Violation #17719509
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Feb 26, 2025 · fix by Apr 2, 2025 overdue · Violation #17719507
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jun 17, 2024 · fix by Jul 22, 2024 overdue · Violation #17049786
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroomIssued Jun 17, 2024 · fix by Jul 22, 2024 overdue · Violation #17049784
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and east wall in the bathroomIssued Jun 17, 2024 · fix by Jul 22, 2024 overdue · Violation #17049783
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jun 17, 2024 · fix by Jul 22, 2024 overdue · Violation #17049782
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 4 sq ft at the east wall in the bathroomIssued Jan 23, 2024 · fix by Feb 27, 2024 overdue · Violation #16622712
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroomIssued Sep 25, 2023 · fix by Oct 30, 2023 overdue · Violation #16245153
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16209160
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 8, 2023 · fix by Oct 13, 2023 overdue · Violation #16209159
  • B
    Other repairsProvide an adequate supply of gas to the fixtures in the kitchenIssued Aug 28, 2014 · fix by Oct 2, 2014 overdue · rent impairing · Violation #10360602

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

52017
22018
42019
12021
12022
132023
102024
162025
462026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 181 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.