Housing violations · Kew Gardens Hills
75-05 150 Street, Queens
11367 · 12 apartments · 3 stories · City Council district 24
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Leaks and water damage4
- Plumbing, sinks and toilets4
- Peeling paint and plaster3
- Broken doors or locks1
- Other repairs1
- Mold1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 4 closed · NYC typical: 87 days
from 6 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at westIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19111178
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 1st room from north at westIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19111179
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19111174
- BBroken doors or locksProperly repair or replace the broken or defective latch assembly at door in the entranceIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19111180
- BPlumbing, sinks and toiletsProperly secure the loose wash basin at south wall in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19111172
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19111173
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base vanity at wash basin in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19111175
- BOther repairsProperly repair with similar material the broken or defective grout and caulking around bath tub in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19111176
- BMoldTrace and repair the source and abate the visible mold condition less then 10 sq ft at ceiling north, west and east wall in the bathroomIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070791
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling north, east and west wall in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703367
- BPlumbing, sinks and toiletsReplace the broken or defective washbasin in the bathroomIssued May 20, 2024 · fix by Jun 24, 2024 overdue · rent impairing · Violation #16975701
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 20, 2024 · fix by Jun 13, 2024 overdue · Violation #16985988
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.