Housing violations · Woodside
61-25 Woodside Avenue, Queens
11377 · 44 apartments · 6 stories · City Council district 26
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
What the city has done here
When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.
Latest city repairs
- $General repairs · $190Missing window guardsOct 11, 2024 · Details
Latest Housing Court cases
- §Warrant to get in for lead paintOpened Mar 11, 2026 · Closed · Details
Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.
Open problems
All open violations in the building, by type.
- Other repairs20
- Broken doors or locks12
- Missing smoke or CO detector10
- Lead paint10
- Roaches8
- Peeling paint and plaster8
- Mice or rats6
- Plumbing, sinks and toilets5
- Missing window guards3
- Bedbug report not filed2
- Electrical problems2
- Mold1
- Leaks and water damage1
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 19 closed · NYC typical: 84 days
from 9 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq feet at the ceiling and west wall in the bathroomIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19111738
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 5th story balcony 2nd from west building front at…Issued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18960723
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items on 3rd story balcony 2nd from west building front…Issued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18960721
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745769
- BOther repairsProperly repair or replace the broken or defective lower sash spring balance at the 1st window from south at west in the 3rd room from east at northIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745767
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745770
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745753
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745760
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 30, 2026 · fix by Apr 25, 2026 overdue · Violation #18745768
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at the sink in the kitchenIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745759
- BOther repairsProperly repair or replace the broken or defective lower sash spring balance at the 1st and 2nd windows from west at north in the kitchenIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745758
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the west wall in the 3rd room from east at northIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745766
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745765
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the kitchenIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745757
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the east wall and ceiling in the kitchenIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745756
- BOther repairsProperly repair or replace the broken or defective lower sash spring balance at the 1st, 2nd, and 3rd windows from west at north in the 1st room from eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745755
- BOther repairsProperly repair or replace the broken or defective light fixture at the ceiling in the 1st room from eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745754
- BOther repairsProperly repair or replace the broken or defective lower sash spring balance at the 1st window from east at south in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745764
- BOther repairsProperly repair or replace the broken or defective lower sash spring balance at the 1st window from east at south in the 2nd room from east at southIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745762
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the south wall in the 2nd room from east at southIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745761
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18559281
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in bathtub in the bathroomIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · rent impairing · Violation #18559283
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18559280
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 degrees fahrenheit in the entire apartmentIssued Jan 9, 2026 · fix by Jan 15, 2026 overdue · Violation #18559282
- BLead paintProperly repair or replace the broken or defective latch at door leading to east yard at public hall, 1st storyIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18538561
- BBroken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door at public hall, 1st storyIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18523710
- CBroken doors or locksRemove the illegal fastening consisting of unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st storyIssued Dec 23, 2025 · fix by Dec 29, 2025 overdue · rent impairing · Violation #18523709
- BBroken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door at public hall, 1st storyIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18468829
- CBroken doors or locksRemove the illegal fastening consisting of unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st storyIssued Dec 1, 2025 · fix by Dec 7, 2025 overdue · rent impairing · Violation #18468828
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2025 · fix by Dec 8, 2025 overdue · Violation #18361312
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2025 · fix by Dec 8, 2025 overdue · Violation #18361313
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 5, 2025 · fix by Nov 29, 2025 overdue · Violation #18352181
- BMissing smoke or CO detectorRepair or replace the smoke detector ,missing in the entire apartmentIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17916920
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). ,missing in the entire apartmentIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17916921
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 27, 2025 · fix by Jun 22, 2025 overdue · rent impairing · Violation #17916918
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective ,base cabinet at sink in the kitchenIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17916922
- BOther repairsProperly repair with similar material the broken or defective ,wooden floor in the 1st room from east at northIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17916919
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 13, 2024 · fix by Jan 6, 2025 overdue · Violation #17555618
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 13, 2024 · fix by Jan 6, 2025 overdue · Violation #17555616
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Dec 13, 2024 · fix by Jan 8, 2025 overdue · Violation #17549965
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 13, 2024 · fix by Jan 6, 2025 overdue · Violation #17555619
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 13, 2024 · fix by Jan 8, 2025 overdue · Violation #17549963
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 13, 2024 · fix by Jan 6, 2025 overdue · Violation #17555617
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17549968
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 13, 2024 · fix by Jan 8, 2025 overdue · Violation #17549966
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 11, 2024 · fix by Jan 6, 2025 overdue · Violation #17544905
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Dec 11, 2024 · fix by Jan 6, 2025 overdue · Violation #17544908
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at wash basin in the bathroomIssued Dec 11, 2024 · fix by Jan 15, 2025 overdue · Violation #17544906
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 11, 2024 · fix by Jan 6, 2025 overdue · Violation #17544904
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 16, 2024 · fix by Nov 20, 2024 overdue · Violation #17348032
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 16, 2024 · fix by Nov 20, 2024 overdue · Violation #17348033
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Sep 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17308925
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Sep 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17308926
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from east at northIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17172631
- BOther repairsProperly repair or replace the broken or defective 1st window from west at north, lower sash, sping balance in the kitchenIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17172629
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 5, 2024 · fix by Aug 31, 2024 overdue · Violation #17172627
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 5, 2024 · fix by Aug 31, 2024 overdue · Violation #17172628
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 4 story balcony second stack at north building…Issued Jul 18, 2024 · fix by Aug 22, 2024 overdue · Violation #17126288
- BBroken doors or locksProperly repair or replace the broken or defective latch assembly on door to east yard at public hall, 1st storyIssued Jul 16, 2024 · fix by Aug 20, 2024 overdue · Violation #17120569
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jul 16, 2024 · fix by Aug 11, 2024 overdue · Violation #17120562
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 27, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.