Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (South)

3828 Broadway, Manhattan

10032 · 38 apartments · 6 stories · City Council district 7

By · Updated · Data from NYC HPD

C
29open immediately hazardous violations · 76 per 100 apartments
B57Hazardous, open
A6Non-hazardous, open
!81Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyCREG REALTY CORP.
Landlord (head officer or owner)Tony Huang

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    15
  2. Leaks and water damage
    14
  3. Other repairs
    14
  4. Broken doors or locks
    13
  5. Electrical problems
    9
  6. Roaches
    8
  7. Mice or rats
    7
  8. Mold
    4
  9. Plumbing, sinks and toilets
    4
  10. Missing smoke or CO detector
    2
  11. No heat or hot water
    1
  12. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C158 days
from 196 closed · NYC typical: 87 days
B110 days
from 231 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19367404
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19367403
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19367402
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · rent impairing · Violation #19367405
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19367406
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376545
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 3rd room from east at southIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376546
  • C
    Broken doors or locksProperly repair or replace the broken or defective heavy duty lockset at building entrance doorIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19367408
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch-set at building front entrance door , 1st storyIssued Oct 30, 2026 · fix by Nov 13, 2026 overdue · Violation #19335002
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued Oct 6, 2026 · fix by Oct 12, 2026 overdue · Violation #19276235
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at building entrance door , 1st storyIssued Oct 6, 2026 · fix by Oct 20, 2026 overdue · Violation #19276236
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19260052
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 8th room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269907
  • C
    Broken doors or locksProvide ready access to buildings heating system boiler room door locked at basementIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19260043
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19260044
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 6th room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269905
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269904
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269903
  • B
    Other repairsProperly repair or replace the broken or defective glass at lower sash window at first window from north at east in the 6th room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269902
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19260051
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19260045
  • B
    MoldTrace and repair the source and abate the visible mold condition more the 10 sqft but less then 30 sqft observed on ceiling and all walls in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269901
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269900
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269899
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 7th room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269908
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269898
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269897
  • B
    Broken doors or locksProperly repair with similar material the broken or defective ceramic saddle at door in the entranceIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269896
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269893
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269892
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269891
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269890
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19269889
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at fuse box on north wall in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19260050
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19260048
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19260047
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic saddle at entrance in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19260046
  • B
    Other repairsProperly repair with similar material the broken or defective vynil floor tiles in the 1st room from east at northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19260054
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19260055
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19260056
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19260049
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19255404
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19255405
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19255406
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19255407
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at sink in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19255408
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at vestubule door at public hall, 1st storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19255413
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at building entrance door at public hall, 1st storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19255411
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection wasteline at wash basin in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19255401
  • C
    RoachesAbate the infestation consisting of roaches at basementIssued Jul 15, 2026 · fix by Aug 10, 2026 overdue · Violation #19072795
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east and west walls in the 5th room from eastIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068239
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 1st room from east at northIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068253
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 3rd room from east at northIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068251
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 3rd room from east at southIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068248
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling inside closet in the 3rd room from east at southIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068247
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 3rd room from east at southIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068246
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 3rd room from east at southIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068245
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, east and west walls in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068241
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068240
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 5th room from eastIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19068238

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

482017
342018
502019
362020
172021
902022
1532023
1762024
1202025
1312026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 954 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.