Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · University Heights (South)-Morris Heights

1971 Grand Avenue, Bronx

10453 · 39 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
43open immediately hazardous violations · 110 per 100 apartments
B82Hazardous, open
A21Non-hazardous, open
!139Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company1971 GRAND AVENUE LLC
Landlord (head officer or owner)Rick Gropper

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    52
  2. Broken doors or locks
    21
  3. Roaches
    14
  4. Mice or rats
    13
  5. Mold
    12
  6. Peeling paint and plaster
    12
  7. Plumbing, sinks and toilets
    8
  8. Leaks and water damage
    5
  9. Missing smoke or CO detector
    4
  10. Electrical problems
    2
  11. Missing window guards
    2
  12. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C85 days
from 71 closed · NYC typical: 87 days
B204 days
from 151 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19374432
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at hopper chute door at public hall, 5th storyIssued Nov 16, 2026 · Violation #19374436
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 16, 2026 · Violation #19374433
  • B
    Other repairsProperly repair with similar material the broken or defective wooden window stool 2nd window from north at east wall in the 1st room from eastIssued Nov 16, 2026 · Violation #19374434
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch and its assembly at hopper chute door at public hall, 5th storyIssued Nov 16, 2026 · Violation #19374437
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective frame at building entrance door , 2nd storyIssued Sep 3, 2026 · fix by Sep 17, 2026 overdue · Violation #19184209
  • B
    Electrical problemsReplace with new the missing electrical safety outlet at west wall at public hall, 1st storyIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19184211
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 1st fire escape from north at east…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19184212
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd fire escape from north at east…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19184213
  • B
    Broken doors or locksRefit door at 1st closet from north at east in the 1st room from eastIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18988498
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 10 sqft and less than 30 sqft at west and south walls in the 2nd bathroomIssued Jun 5, 2026 · fix by Jul 1, 2026 overdue · Violation #18989338
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 30, 2026 · fix by May 26, 2026 overdue · Violation #18820642
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 30, 2026 · fix by May 26, 2026 overdue · Violation #18820645
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 20, 2026 · fix by May 16, 2026 overdue · Violation #18788819
  • B
    Broken doors or locksReplace with new the missing door at base cabinet at west wall in the bathroomIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18788820
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Apr 16, 2026 · fix by Apr 22, 2026 overdue · Violation #18788821
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at east and south walls in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18739541
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Dec 18, 2025 · fix by Jan 22, 2026 overdue · Violation #18512973
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 18, 2025 · fix by Jan 13, 2026 overdue · Violation #18512971
  • B
    Broken doors or locksReplace with new the missing wash basin cabinet doors in the bathroomIssued Dec 18, 2025 · fix by Jan 22, 2026 overdue · Violation #18512972
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at south west and north wall in the bathroomIssued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18508648
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18490356
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18490357
  • C
    Broken doors or locksRemove device preventing door from being self-closing door sweep in the entranceIssued Nov 6, 2025 · fix by Nov 20, 2025 overdue · Violation #18348336
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sqft and less than 30 sqft at west wall and ceiling in the bathroomIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18352066
  • C
    Other repairsProperly repair or replace the broken or defective hydronic baseboard heater missing cover at south wall and west wall in the 2nd room from east at southIssued Oct 30, 2025 · fix by Nov 5, 2025 overdue · Violation #18327234
  • C
    Other repairsProperly repair or replace the broken or defective hydronic baseboard heater missing cover at south wall in the 1st room from east at southIssued Oct 30, 2025 · fix by Nov 5, 2025 overdue · Violation #18327233
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Oct 30, 2025 · fix by Dec 4, 2025 overdue · Violation #18327231
  • C
    Broken doors or locksRemove device preventing door from being self-closing door sweepIssued Sep 19, 2025 · fix by Oct 3, 2025 overdue · Violation #18234153
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 19, 2025 · fix by Oct 15, 2025 overdue · Violation #18234156
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 15, 2025 · fix by Sep 10, 2025 overdue · Violation #18164948
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at ceiling and east wall in the bathroomIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126218
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at ceiling, east wall, west wall and south wall in the bathroomIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126088
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at ceiling and all walls in the bathroomIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18125999
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at ceiling and window casing at north wall in the bathroomIssued May 21, 2025 · fix by Jun 25, 2025 overdue · Violation #17913255
  • B
    Other repairsProperly repair with similar material the broken or defective sagging wood floor in the 2nd room from east at southIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17758223
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 17, 2025 · fix by Apr 12, 2025 overdue · Violation #17758226
  • B
    Other repairsProperly repair with similar material the broken or defective sagging wood floor in the 1st room from east at southIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17758222
  • B
    Broken doors or locksProperly repair or replace the broken or defective cabinet doors at top and bottom cabinets. at basement apartment in the kitchenIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17748801
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 17, 2025 · fix by Apr 12, 2025 overdue · Violation #17758225
  • B
    Leaks and water damageProperly repair with similar material the broken or defective erroded wood plank flooring lifting up and sinking due to water leak in the entire apartmentIssued Mar 13, 2025 · fix by Apr 17, 2025 overdue · Violation #17748799
  • C
    Other repairsProperly repair with similar material the broken or defective wood sub floor erroed in the 1st room from eastIssued Mar 11, 2025 · fix by Mar 17, 2025 overdue · Violation #17748803
  • B
    Other repairsProperly repair or replace the broken or defective baseboard radiator at west wall. in the 2nd room from eastIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17748802
  • B
    Broken doors or locksRefit 1st and 2nd closet doors at east wall. in the 1st room from eastIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17748800
  • C
    Other repairsProperly repair or replace the broken or defective lower sash window spring balance at west wall stuck in the 2nd room from eastIssued Mar 11, 2025 · fix by Mar 17, 2025 overdue · Violation #17748808
  • B
    Other repairsRefit egress window upper and lower sash at west wall. in the 2nd room from eastIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17748807
  • C
    Other repairsProperly repair with similar material the broken or defective wood sub floor erroed due to water damage. in the 2nd room from eastIssued Mar 11, 2025 · fix by Mar 17, 2025 overdue · Violation #17748804
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17748805
  • B
    Other repairsProperly repair or replace the broken or defective baseboard radiator at west wall. in the 2nd room from eastIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17748806
  • C
    Other repairsProperly repair or replace the broken or defective hydronic baseboard heater cover at south wall in the 1st room from east at southIssued Mar 10, 2025 · fix by Mar 16, 2025 overdue · Violation #17743198
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 10, 2025 · fix by Apr 5, 2025 overdue · Violation #17743105
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 10, 2025 · fix by Apr 5, 2025 overdue · Violation #17743106
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wash basin cabinet in the bathroomIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17743107
  • C
    Other repairsProperly repair or replace the broken or defective hydronic baseboard heater cover at south wall and west wall in the 2nd room from east at southIssued Mar 10, 2025 · fix by Mar 16, 2025 overdue · Violation #17743199
  • B
    Broken doors or locksProvide kitchen cabinet doors at sink base cabinet and wall base cabinet at east wall in the kitchenIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17743108
  • B
    Other repairsProperly repair or replace the broken or defective wood floor in the 2nd room from northIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17743109
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17743196
  • B
    Other repairsProperly repair or replace the broken or defective window frame sill at south wall in the 1st room from east at southIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17743197
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Feb 28, 2025 · fix by Mar 26, 2025 overdue · Violation #17726634
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from eastIssued Jan 21, 2025 · fix by Feb 25, 2025 overdue · Violation #17632600

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12017
112018
102019
12020
382021
442022
152023
1052024
2092025
602026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 615 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.