Housing violations · University Heights (South)-Morris Heights
2200 Grand Avenue, Bronx
10453 · 49 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster21
- Other repairs19
- Lead paint9
- Leaks and water damage8
- Roaches7
- Plumbing, sinks and toilets7
- Broken doors or locks6
- Mice or rats5
- Mold5
- Missing smoke or CO detector3
- No heat or hot water1
- Electrical problems1
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 115 closed · NYC typical: 87 days
from 172 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 27, 2026 · fix by Nov 22, 2026 · Violation #19329566
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall, and at ceiling in the 1st room from eastIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19329569
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall, and at ceiling in the 1st room from eastIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19329568
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 27, 2026 · fix by Nov 22, 2026 · Violation #19329567
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 27, 2026 · fix by Nov 22, 2026 · Violation #19329565
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel at bathtub by way of reglazing in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169058
- BOther repairsProperly repair or replace the broken or defective window upper and lower spring balance at north wall in the 4th room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169057
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19106856
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · rent impairing · Violation #19106850
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 30, 2026 · fix by Aug 23, 2026 overdue · Violation #19113931
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 30, 2026 · fix by Aug 23, 2026 overdue · Violation #19113930
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19106849
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish glaze at bathtub in the bathroomIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19106852
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jul 30, 2026 · fix by Aug 23, 2026 overdue · Violation #19113928
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from east at northIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · rent impairing · Violation #19106841
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19106845
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 30, 2026 · fix by Aug 25, 2026 overdue · Violation #19106848
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jul 30, 2026 · fix by Aug 23, 2026 overdue · Violation #19113929
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Jul 30, 2026 · fix by Aug 13, 2026 overdue · Violation #19106847
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at exit door at 1st public hall bulkhead from east at south, 6th storyIssued Jul 30, 2026 · fix by Aug 13, 2026 overdue · Violation #19106855
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19106851
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall at 1st public hall bulkhead from north at west, 6th storyIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19106853
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 21, 2026 · fix by Aug 16, 2026 overdue · Violation #19084310
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at west exterior wall 1st from north at balcony at…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18966741
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner at west exterior wall 2nd from north at 6th…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18966742
- BOther repairsProperly secure the loose handrail at south wall at public hall stairs, 1st storyIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18952786
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 13, 2026 · fix by May 9, 2026 overdue · Violation #18780400
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at southwall, and at ceiling in the 1st room from eastIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18773660
- CNo heat or hot waterProvide hot water at all hot water fixtures in the 1st room from east at northIssued Feb 2, 2026 · fix by Feb 1, 2026 overdue · rent impairing · Violation #18609680
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft south wall around window frame in the bathroomIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18514132
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at west wall in the bathroomIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18514133
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 1, 2025 · fix by Dec 27, 2025 overdue · Violation #18444655
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles , 1st storyIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18442387
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge in the entranceIssued Oct 21, 2025 · fix by Nov 4, 2025 overdue · Violation #18312222
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes of flower pots at 2nd fire escape from north at west at fire…Issued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18144062
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 4th room from eastIssued Aug 1, 2025 · fix by Sep 5, 2025 overdue · Violation #18121141
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the private hallwayIssued Aug 1, 2025 · fix by Sep 5, 2025 overdue · Violation #18121139
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color inside closet at south wall in the private hallwayIssued Aug 1, 2025 · fix by Sep 5, 2025 overdue · Violation #18121142
- CBroken doors or locksProperly repair or replace the broken or defective latch on vestibule door at public hall, 1st storyIssued Jul 17, 2025 · fix by Jul 23, 2025 overdue · Violation #18100248
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Jul 17, 2025 · fix by Aug 21, 2025 overdue · rent impairing · Violation #18100247
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from eastIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · rent impairing · Violation #18051384
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18051385
- BPlumbing, sinks and toiletsProperly secure the loose wash basin from wall in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18051388
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18051389
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Apr 25, 2025 · fix by May 30, 2025 overdue · Violation #17851684
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Feb 24, 2025 · fix by Mar 20, 2025 overdue · Violation #17721670
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 24, 2025 · fix by Mar 20, 2025 overdue · Violation #17721417
- BOther repairsProperly repair with similar material the broken or defective ceramic tiled floor in the bathroomIssued Feb 24, 2025 · fix by Mar 31, 2025 overdue · Violation #17710947
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued May 28, 2024 · fix by Jun 21, 2024 overdue · Violation #17002561
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued May 28, 2024 · fix by Jun 21, 2024 overdue · Violation #17003486
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 25, 2023 · fix by Nov 20, 2023 overdue · Violation #16331313
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 3rd room from east at southIssued Oct 25, 2023 · fix by Nov 29, 2023 overdue · rent impairing · Violation #16331311
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and the north and west walls in the 3rd room from east at southIssued Oct 25, 2023 · fix by Nov 29, 2023 overdue · Violation #16331312
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 23, 2023 · fix by Sep 18, 2023 overdue · Violation #16175153
- BOther repairsReplace with new the broken or defective lower window sash glass pane in the 1st room from northIssued Apr 4, 2022 · fix by May 9, 2022 overdue · Violation #15093356
- BOther repairsProperly repair with similar material the broken or defective wood floors in the foyerIssued Apr 4, 2022 · fix by May 9, 2022 overdue · Violation #15093355
- BOther repairsProperly repair with similar material the broken or defective wood floors in the 1st room from northIssued Apr 4, 2022 · fix by May 9, 2022 overdue · Violation #15093354
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Nov 18, 2021 · fix by Dec 23, 2021 overdue · Violation #14680713
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Nov 18, 2021 · fix by Dec 23, 2021 overdue · Violation #14680714
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Nov 18, 2021 · fix by Dec 23, 2021 overdue · Violation #14680712
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.