Housing violations · Mount Eden-Claremont (West)
1384 Grand Concourse, Bronx
10456 · 44 apartments · 6 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building has more.
11 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
What the city has done here
When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.
Latest city repairs
- $Lead paint removal · $28Lead paintOct 10, 2006 · Details
Latest Housing Court cases
- §No heat or hot waterOpened Jan 13, 2025 · Closed · Details
- §Tenants sued over repairs and harassmentOpened Dec 7, 2020 · Closed · Details
- §No heat or hot waterOpened Feb 21, 2020 · Closed · Details
- §Tenants sued for repairsOpened May 11, 2018 · Closed · Details
- §Tenants sued over repairs and harassmentOpened Jan 28, 2014 · Closed · Details
- §False repair claimsOpened Jun 27, 2013 · Closed · Details
- §Warrant to get in and inspect or repairOpened May 30, 2013 · Closed · Details
- §Warrant to get in and inspect or repairOpened Sep 13, 2012 · Closed · Details
Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.
Open problems
All open violations in the building, by type.
- Other repairs35
- Broken doors or locks21
- Peeling paint and plaster14
- Leaks and water damage7
- Missing smoke or CO detector6
- Mice or rats5
- Plumbing, sinks and toilets3
- Roaches3
- Electrical problems2
- Bedbug report not filed2
- No heat or hot water2
- Missing window guards1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 1 closed · NYC typical: 84 days
NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BBroken doors or locksProvide slide bolt or hook on roof door that allows re-entry from roof to bulkhead at public hall stairs, 6th story, section ''north''Issued Nov 23, 2026 · fix by Dec 28, 2026 · Violation #19418547
- CBroken doors or locksRemove the illegal fastening pushbar lock installed on roof door that doesn't allow re-entry from roof to bulkhead at public hall stairs, 6th story, section…Issued Nov 23, 2026 · fix by Nov 29, 2026 · rent impairing · Violation #19418546
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective [hinge] door to roof at bulkhead at public hall stairs, 6th story, section ''north''Issued Nov 23, 2026 · fix by Dec 7, 2026 · Violation #19418545
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city…Issued Nov 23, 2026 · fix by Dec 19, 2026 · Violation #19418543
- BBroken doors or locksProvide slide bolt or hook on roof door that allows re-entry from roof to bulkhead at public hall stairs, 6th story, section ''south''Issued Nov 23, 2026 · fix by Dec 28, 2026 · Violation #19418550
- BOther repairsRemove all encumbrances consisting of household items at public hall stairs, 5th story, section ''south''Issued Nov 23, 2026 · fix by Dec 28, 2026 · rent impairing · Violation #19418551
- CBroken doors or locksRemove the illegal fastening pushbar lock installed on roof door that doesn't allow re-entry from roof to bulkhead at public hall stairs, 6th story, section…Issued Nov 23, 2026 · fix by Nov 29, 2026 · rent impairing · Violation #19418549
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective [hinge] door to roof at bulkhead at public hall stairs, 6th story, section ''south''Issued Nov 23, 2026 · fix by Dec 7, 2026 · Violation #19418548
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344854
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344852
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet continuously running in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19344855
- BBroken doors or locksProperly repair with similar material the broken or defective wood door in the 2nd room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344856
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tile in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344857
- BBroken doors or locksProperly repair with similar material the broken or defective wood door at cabinet at sink in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344858
- BBroken doors or locksProperly repair or replace the broken or defective wood door frame in the 4th room from east at southIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344860
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash at 2nd window from south at west in the 4th room from east at southIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344861
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the 4th room from east at northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344862
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash at 2nd window from south at west in the 4th room from east at northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344863
- BOther repairsProperly repair with similar material the broken or defective cracked lower glass pane at fire escape window in the 4th room from east at northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344865
- BBroken doors or locksProperly repair with similar material the broken or defective wood door in the 3rd room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344859
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash at 1st window from south at west in the 4th room from east at northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344864
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344853
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash at 2nd window from south in the 3rd room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322333
- BOther repairsProperly repair or replace the broken or defective cracked glass pane at lower sash window at north in the 3rd room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322334
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322337
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322339
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322340
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322341
- BOther repairs& 309 m/d law abate the nuisance consisting of vinyl floor tiles causing trip hazard in the 3rd room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322344
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of light fixture at ceiling in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322335
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges and door frame in the entranceIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19322346
- BBroken doors or locksProperly repair or replace the broken or defective 3rd door from east at south in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322348
- BOther repairsProperly repair or replace the broken or defective light fixture in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322347
- COther repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19322350
- BBroken doors or locksProperly repair or replace the broken or defective door at entrance in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322343
- BBroken doors or locksProperly repair or replace the broken or defective door frame in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322349
- BBroken doors or locksProperly repair or replace the broken or defective both doors at east wall in the 3rd room from north at westIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322353
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322336
- BBroken doors or locksRefit 2nd door from east in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322352
- BBroken doors or locksProperly repair or replace the broken or defective door at east in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322351
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770707
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770701
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770702
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from eastIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770703
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceiling in the 4th room from eastIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770704
- BOther repairsReplace with new the missing upper escutcheon plate at south riser pipe in the bathroomIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770699
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770708
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 20, 2025 · fix by Apr 15, 2025 overdue · Violation #17770706
- BOther repairsProperly repair or replace the broken or defective light fixture at the ceiling in the bathroomIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770694
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Mar 20, 2025 · fix by Apr 3, 2025 overdue · Violation #17770697
- BOther repairsProperly repair or replace the broken or defective base cabinet at the east wall in the kitchenIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770695
- BOther repairsProperly repair or replace the broken or defective wall cabinet at east in the kitchenIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770696
- BOther repairsProperly repair or replace the broken or defective wood base cabinet at east in the bathroomIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770700
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 20, 2025 · fix by Apr 15, 2025 overdue · Violation #17770705
- BOther repairsProperly repair or replace the broken or defective upper and lower window sash counter balance at the 1st window from west at north in the bathroomIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17770698
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 9, 2024 · fix by Dec 7, 2024 overdue · rent impairing · Violation #17541949
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Dec 9, 2024 · fix by Dec 15, 2024 overdue · Violation #17529201
- BMissing smoke or CO detectorRepair or replace the smoke detector (missing) in the entire apartmentIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · Violation #17481410
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). (missing) in the entire apartmentIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · Violation #17481409
- CBroken doors or locksProvide ready access to buildings heating system (door locked) at boiler roomIssued Nov 29, 2024 · fix by Dec 5, 2024 overdue · Violation #17481412
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 29, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.