Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mount Hope

1750 Grand Concourse, Bronx

10457 · 70 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
50open immediately hazardous violations · 71 per 100 apartments
B55Hazardous, open
A26Non-hazardous, open
!121Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company1750 GC LLC
Landlord (head officer or owner)Ezriel Weinberger

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    28
  2. Other repairs
    21
  3. Broken doors or locks
    21
  4. Lead paint
    17
  5. Leaks and water damage
    8
  6. Mold
    7
  7. Plumbing, sinks and toilets
    6
  8. Roaches
    6
  9. Electrical problems
    5
  10. No heat or hot water
    4
  11. Mice or rats
    4
  12. Missing smoke or CO detector
    4

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 276 closed · NYC typical: 87 days
B108 days
from 301 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair or replace the broken or defective lower sash glass at the 1st window from east at south in the 2nd room from north at westIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346908
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 3, 2026 overdue · rent impairing · Violation #19346907
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19346909
  • C
    Broken doors or locksRemove the illegal fastening panic bar installed at roof door that does not allow re-entry from roof to public hall at 1st public hall bulkhead from north, 6th…Issued Oct 29, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19337931
  • B
    Broken doors or locksProvide unlockable slide bolt or hook installed on door that allows re-entry from roof to public hall at 1st public hall bulkhead from north, 6th story,…Issued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337932
  • C
    Other repairsProperly secure the loose loose 10th tread up from bottom causing trip hazard at public hall stairs, 1st story, section ''north''Issued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337933
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding 130 at all water fixtures in the entire apartmentIssued Oct 22, 2026 · fix by Oct 28, 2026 overdue · Violation #19310085
  • C
    Broken doors or locksRemove device preventing door from being self-closing due to cardboard wedge under the fire doors at public hall, 4th storyIssued Oct 13, 2026 · fix by Oct 27, 2026 overdue · Violation #19291573
  • B
    Broken doors or locksReplace with new the missing latch set and its assemblys at vestibule door at basement at public hall, section ''north''Issued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19184658
  • C
    Broken doors or locksRemove device preventing door from being self-closing wood wedge at 1st door from south at public hall, 7th story, section ''north''Issued Sep 4, 2026 · fix by Sep 18, 2026 overdue · Violation #19184660
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at street door at basement at public hall, section ''north''Issued Sep 4, 2026 · fix by Sep 10, 2026 overdue · Violation #19184656
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at the east wall in the 2nd room from east at southIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166010
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze enamel at the bathtub in the 2nd bathroom from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166006
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the 2nd bathroom from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · rent impairing · Violation #19166012
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19148833
  • C
    MoldTrace and repair the source and abate the visible mold condition at walls and ceiling in the private hallwayIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19148828
  • C
    MoldTrace and repair the source and abate the visible mold condition at walls and ceiling in the foyerIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19148829
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 5th room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19148832
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19148831
  • C
    MoldTrace and repair the source and abate the visible mold condition at walls and ceiling in the bathroomIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19148827
  • C
    MoldTrace and repair the source and abate the visible mold condition 10sqft at west wall, 10sqft at south wall, 10sqft at east wall at room east 3 in the 3rd room…Issued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19148830
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19138073
  • B
    Broken doors or locksProperly repair or replace the broken or defective door knob at closet in the private hallwayIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138076
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19138074
  • B
    Other repairsProperly repair or replace the broken or defective upper escutcheon plate at heat riser in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19138075
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Jun 18, 2026 · fix by Jul 12, 2026 overdue · Violation #19018296
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 17, 2026 · fix by Jul 11, 2026 overdue · Violation #19018164
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 17, 2026 · fix by Jul 11, 2026 overdue · Violation #19018166
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 17, 2026 · fix by Jul 11, 2026 overdue · Violation #19018163
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 17, 2026 · fix by Jul 11, 2026 overdue · Violation #19018167
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 17, 2026 · fix by Jul 11, 2026 overdue · Violation #19018165
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18968877
  • B
    MoldTrace and repair the source and abate the visible mold condition grater than 10 sq ft at ceiling, east and south wall in the bathroomIssued May 27, 2026 · fix by Jul 1, 2026 overdue · Violation #18961780
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in washbasin in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18797599
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18797598
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the 2nd room from north at eastIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18797601
  • B
    Other repairsProperly repair or replace the broken or defective light fixtures at ceiling in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18797600
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the 1st bathroom from eastIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18797595
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulk around bathtub in the bathroomIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18792979
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18792980
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Apr 16, 2026 · fix by Apr 30, 2026 overdue · Violation #18792975
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18792977
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east and south walls in the 2nd room from northIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18792978
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18792981
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling, west and south walls at bulkhead section north at public…Issued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18763241
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and all walls at bulkhead section south at public hall, 6th…Issued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18763234
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling, west and south walls at bulkhead section north at public hall, 6th storyIssued Apr 6, 2026 · fix by May 11, 2026 overdue · rent impairing · Violation #18763244
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock installed at door to room with fire escape in the 5th room from eastIssued Apr 6, 2026 · fix by Apr 12, 2026 overdue · Violation #18763255
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18763280
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling and all walls at bulkhead section south at public hall, 6th storyIssued Apr 6, 2026 · fix by May 11, 2026 overdue · rent impairing · Violation #18763239
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of hasp & eye with padlock at entrance door in the 3rd room from north at westIssued Apr 6, 2026 · fix by Apr 12, 2026 overdue · Violation #18763284
  • C
    Broken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued Apr 6, 2026 · fix by Apr 12, 2026 overdue · Violation #18764068
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 3, 2026 · fix by Apr 27, 2026 overdue · Violation #18763302
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18763294
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and west walls. in the bathroomIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18557751
  • B
    Other repairsProperly repair or replace the broken or defective intercom /bell buzzer from panel at building entrance to south wall in the foyerIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18557754
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18557749
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 28, 2025 · fix by Nov 25, 2025 overdue · rent impairing · Violation #18455123
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallwayIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18455156
  • C
    Broken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18455141

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

762017
342018
4902019
592020
752021
332022
1572023
1892024
2352025
2022026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 2,106 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.