Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mount Hope

2186 Grand Concourse, Bronx

10457 · 52 apartments · 6 stories · City Council district 15

By · Updated · Data from NYC HPD

C
27open immediately hazardous violations · 52 per 100 apartments
B16Hazardous, open
A5Non-hazardous, open
!45Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning company2186 Realty Ny LLC
Landlord (head officer or owner)Joel Weiner

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    21
  2. Peeling paint and plaster
    7
  3. Other repairs
    5
  4. Mold
    4
  5. Broken doors or locks
    4
  6. Roaches
    3
  7. Mice or rats
    2
  8. Electrical problems
    1
  9. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C91 days
from 67 closed · NYC typical: 87 days
B122 days
from 91 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369157
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369155
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369156
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft at in the 4th room from eastIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143986
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft at west wall in the 4th room from eastIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143985
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Apr 16, 2026 · fix by May 10, 2026 overdue · Violation #18793764
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 8, 2026 · fix by May 4, 2026 overdue · Violation #18777096
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket around refrigerator doors in the kitchenIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18777091
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of furniture blocking fire escape window in the 4th room from eastIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18777025
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 8, 2026 · fix by May 4, 2026 overdue · Violation #18777054
  • C
    Other repairsProperly repair with similar material the broken or defective wood flooring in the kitchenIssued Apr 8, 2026 · fix by Apr 14, 2026 overdue · Violation #18777073
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18777087
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures throughout entire apartment in the entire apartmentIssued Apr 8, 2026 · fix by Apr 14, 2026 overdue · Violation #18777045
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective base cabinet at sink in the 1st bathroom from eastIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18777090
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 11, 2026 · fix by Mar 9, 2026 overdue · Violation #18633642
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 1st room from eastIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18633647
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 11, 2026 · fix by Mar 9, 2026 overdue · Violation #18633643
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18633646
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17407455
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17407464
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17407477
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Oct 31, 2024 · fix by Nov 4, 2024 overdue · Violation #17391267
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Oct 31, 2024 · fix by Nov 4, 2024 overdue · Violation #17391268
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 11, 2024 · fix by Nov 4, 2024 overdue · Violation #17346991
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 11, 2024 · fix by Nov 4, 2024 overdue · Violation #17346990
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Aug 30, 2024 · fix by Sep 23, 2024 overdue · Violation #17235197
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 29, 2024 · fix by Sep 22, 2024 overdue · Violation #17235118
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 29, 2024 · fix by Sep 22, 2024 overdue · Violation #17235119
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 29, 2024 · fix by Sep 22, 2024 overdue · Violation #17235120
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 29, 2024 · fix by Sep 22, 2024 overdue · Violation #17235123
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 29, 2024 · fix by Sep 22, 2024 overdue · Violation #17235124
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 29, 2024 · fix by Sep 22, 2024 overdue · Violation #17235125
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling 1 sq. ft at north wall 10 sq. ft. at east wall 2 sq. ft. in the bathroomIssued Mar 1, 2024 · fix by Apr 5, 2024 overdue · Violation #16706501
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 14, 2022 · fix by Dec 8, 2022 overdue · Violation #15528953
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 14, 2022 · fix by Dec 8, 2022 overdue · Violation #15528952
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15484754
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 24, 2022 · fix by Feb 17, 2022 overdue · Violation #14791347
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 24, 2022 · fix by Feb 17, 2022 overdue · Violation #14791346
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jan 24, 2022 · fix by Feb 17, 2022 overdue · Violation #14791932
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 24, 2022 · fix by Feb 17, 2022 overdue · Violation #14791345
  • C
    MoldTrace and repair the source and abate the visible mold condition approx 30 sq ft at ceiling and all walls in the 1st bathroom from east at northIssued Jun 27, 2019 · fix by Jul 18, 2019 overdue · Violation #13142244
  • B
    Other repairsProperly secure the loose south and north metal guardrails at east wall in the 3rd room from north at westIssued Jan 2, 2014 · fix by Feb 6, 2014 overdue · Violation #10080717
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jul 12, 2012 · fix by Aug 16, 2012 overdue · Violation #9500733

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

602017
392018
332019
162020
492021
982022
382023
762024
532025
922026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 842 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.