Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · University Heights (North)-Fordham

2545 Grand Concourse, Bronx

10468 · 44 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
24open immediately hazardous violations · 55 per 100 apartments
B29Hazardous, open
A16Non-hazardous, open
!45Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company2545 GRAND CONCOURSE I LLC
Landlord (head officer or owner)David Kleiner

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    19
  2. Peeling paint and plaster
    11
  3. Broken doors or locks
    11
  4. Mold
    10
  5. Lead paint
    6
  6. Mice or rats
    4
  7. Roaches
    4
  8. Plumbing, sinks and toilets
    2
  9. Missing smoke or CO detector
    2
  10. Leaks and water damage
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 62 closed · NYC typical: 87 days
B116 days
from 92 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 26, 2026 · fix by Nov 19, 2026 · Violation #19330577
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 26, 2026 · fix by Nov 19, 2026 · Violation #19330576
  • B
    Other repairsProperly repair or replace the broken or defective escustion plate ateast riser in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322201
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322202
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322203
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19322204
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19322207
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19322208
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322209
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322215
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322216
  • B
    Other repairsProperly repair or replace the broken or defective bell buzzer intercomm system from building entrance to south wall in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322217
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 26, 2026 · fix by Nov 19, 2026 · Violation #19330578
  • B
    Other repairsProperly repair or replace the broken or defective lower window sash spring balance in the 4th room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322198
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 4th room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322199
  • B
    Broken doors or locksProvide glass at building entrance doors , 1st story, section at northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191980
  • B
    Other repairsRemove all encumbrances consisting of discarded household items at public hall, 6th story, section at northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19191978
  • B
    Broken doors or locksProvide glass at vestibule door , 1st story, section at northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191979
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance doors , 1st story, section at northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191982
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at vestibule door , 1st story, section at northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191981
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective latch at building entrance door leading from street to vestibule at public hall, 1st storyIssued Jul 23, 2026 · fix by Aug 6, 2026 overdue · Violation #19087352
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jul 23, 2026 · fix by Jul 29, 2026 overdue · Violation #19090311
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 6th public hall bulkhead from north, 6th storyIssued Jun 12, 2026 · fix by Jun 26, 2026 overdue · Violation #18994020
  • B
    Broken doors or locksRemove the illegal fastening consisting of panic bar installed on roof door that do not allow re entry from roof to public hall. at 6th public hall bulkhead…Issued Jun 12, 2026 · fix by Jul 17, 2026 overdue · rent impairing · Violation #18994019
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18994017
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18994016
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bath tub in the bathroomIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18994014
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the private hallwayIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18994015
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch and its assemblies at fire door at 6th public hall bulkhead from north, 6th storyIssued Jun 12, 2026 · fix by Jun 18, 2026 overdue · Violation #18994021
  • B
    MoldTrace and repair the source and abate the visible mold condition at east wall less than 10 sq ft in the bathroomIssued Mar 10, 2026 · fix by Apr 14, 2026 overdue · Violation #18702437
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling less than 10 sq ft in the 3rd room from northIssued Mar 10, 2026 · fix by Apr 14, 2026 overdue · Violation #18702436
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of free standing metal radiator at floor at public hall, 3rd story, section at southIssued Nov 6, 2025 · fix by Nov 12, 2025 overdue · Violation #18352684
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 31, 2025 · fix by Nov 26, 2025 overdue · Violation #18334241
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 31, 2025 · fix by Nov 26, 2025 overdue · Violation #18334240
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 22, 2025 · fix by Oct 18, 2025 overdue · Violation #18240010
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the kitchenIssued Sep 11, 2025 · fix by Oct 16, 2025 overdue · Violation #18217918
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building front entrance door , 1st storyIssued Aug 7, 2025 · fix by Aug 21, 2025 overdue · Violation #18140053
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at east wall at vestibule , 1st story original violation 17748104…Issued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18081349
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at entrance , 1st storyIssued May 8, 2025 · fix by May 22, 2025 overdue · Violation #17877006
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling and south wall (less than 10 sq.ft.) in the bathroomIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17817788
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall at vestibule , 1st storyIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17748106
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued Mar 10, 2025 · fix by Apr 14, 2025 overdue · Violation #17748107
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Dec 12, 2024 · fix by Jan 5, 2025 overdue · Violation #17554000
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance door ( from street to vestibule) , 1st storyIssued Sep 30, 2024 · fix by Oct 14, 2024 overdue · Violation #17306193
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door ( from street to vestibule) , 1st storyIssued Sep 30, 2024 · fix by Oct 14, 2024 overdue · Violation #17306195
  • C
    MoldTrace and repair the source and abate the visible mold condition at north wall apprx 12 sq ft in the bathroomIssued May 28, 2024 · fix by Jun 23, 2024 overdue · Violation #17003441
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 16, 2024 · fix by Jun 11, 2024 overdue · Violation #16973210
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 16, 2024 · fix by Jun 11, 2024 overdue · Violation #16973211
  • B
    MoldTrace and repair the source and abate the visible mold condition ( approx. 6 sq. ft.) at north wall in the bathroomIssued Dec 5, 2023 · fix by Jan 9, 2024 overdue · Violation #16502498
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Nov 14, 2023 · fix by Nov 20, 2023 overdue · Violation #16375785
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 10sq ft of mold on south wall in the bathroomIssued Sep 25, 2023 · fix by Oct 30, 2023 overdue · Violation #16245734
  • B
    MoldTrace and repair the source and abate the visible mold condition 10sq ft on east wall 10sq ft on south wall in the bathroomIssued Aug 23, 2023 · fix by Sep 27, 2023 overdue · Violation #16175645
  • C
    Other repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Aug 5, 2019 · fix by Sep 2, 2019 overdue · Violation #13206522

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

222017
372018
2872019
342020
272021
472023
482024
1272025
442026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,085 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.