Housing violations · University Heights (North)-Fordham
2585 Grand Concourse, Bronx
10468 · 27 apartments · 5 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs21
- Peeling paint and plaster10
- Mold8
- Broken doors or locks7
- Mice or rats4
- Missing smoke or CO detector4
- Leaks and water damage3
- Roaches2
- No heat or hot water2
- Lead paint2
- Electrical problems1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 67 closed · NYC typical: 87 days
from 95 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19350190
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19350194
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19350195
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19285041
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285045
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285044
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285043
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285042
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19285040
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278941
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 8, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19278940
- BMoldTrace and repair the source and abate the visible mold condition observed greater than 10 sq ft at ceiling in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278945
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278949
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19278943
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278948
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278942
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19278946
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19278950
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 8, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19278947
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the private hallwayIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19263232
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 29, 2026 · fix by May 23, 2026 overdue · Violation #18822936
- BMoldTrace and repair the source and abate the visible mold condition greater than 1o square feet at the 1st closet from east at south wall wall in the private…Issued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18818078
- COther repairsProperly repair with similar material the broken or defective marble saddle in the entranceIssued Apr 23, 2026 · fix by Apr 29, 2026 overdue · Violation #18813615
- COther repairsProperly repair with similar material the broken or defective ceramic floor tile in the kitchenIssued Apr 23, 2026 · fix by Apr 29, 2026 overdue · Violation #18813588
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flowers pots at balcony at 1st fire escape from…Issued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18749528
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18749527
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from north at eastIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18749526
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 9, 2026 · fix by Apr 2, 2026 overdue · Violation #18700779
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 3, 2026 · fix by Mar 29, 2026 overdue · Violation #18685725
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at north yardIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685757
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th storyIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685760
- BOther repairsProperly repair or replace the broken or defective spring balance lower sash window in the 4th room from north at westIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685771
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at north and west walls in the 4th room from east at northIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685785
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at south and west walls in the bathroomIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685787
- BBroken doors or locksProperly repair or replace the broken or defective marble saddle at door in the entranceIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685792
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685794
- BBroken doors or locksProperly repair or replace the broken or defective marble saddle at entrance door in the bathroomIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685795
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 1st room from east at northIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685798
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchenIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685802
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685803
- CMoldTrace and repair the source and abate the visible mold condition approx. 10 sq ft at ceiling, south wall, west wall in the 4th room from east at northIssued Mar 3, 2026 · fix by Mar 29, 2026 overdue · Violation #18686326
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th storyIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685758
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at bulkhead doorIssued Mar 3, 2026 · fix by Mar 17, 2026 overdue · Violation #18685762
- BOther repairsProperly repair with similar material the broken or defective wood sub-floor in the kitchenIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685847
- BBroken doors or locksRefit the french door at entrance in the 1st room from east at northIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18685800
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Feb 18, 2026 · fix by Mar 25, 2026 overdue · Violation #18644912
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and all wallsIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18592343
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th storyIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18592340
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door (from roof to public hall stair case) at 1st public hall bulkhead from…Issued Jan 27, 2026 · fix by Feb 10, 2026 overdue · Violation #18596384
- BOther repairsProperly repair with similar material the broken or defective wood sub-floor in the kitchenIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18592285
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles over subwood floor in the kitchenIssued Nov 21, 2025 · fix by Dec 26, 2025 overdue · Violation #18393982
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 10, 2025 · fix by Aug 5, 2025 overdue · Violation #18076092
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 10, 2025 · fix by Aug 5, 2025 overdue · Violation #18076091
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18014275
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at northIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18014281
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18014277
- BOther repairsProperly repair with similar material the broken or defective ceremic floor tiles in the bathroomIssued Jun 7, 2024 · fix by Jul 12, 2024 overdue · Violation #17015283
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 6, 2023 · fix by Dec 2, 2023 overdue · Violation #16362704
- BMoldTrace and repair the source and abate the visible mold condition approx. 10 sq. ft. at the west wall, north wall in the 4th room from east at northIssued Jun 29, 2022 · fix by Aug 3, 2022 overdue · Violation #15236392
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.