Housing violations · University Heights (North)-Fordham
2625 Grand Concourse, Bronx
10468 · 39 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint18
- Other repairs18
- Peeling paint and plaster10
- Roaches6
- Leaks and water damage5
- Mold4
- Broken doors or locks4
- Plumbing, sinks and toilets3
- Mice or rats3
- Missing smoke or CO detector2
- Missing window guards1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 166 closed · NYC typical: 87 days
from 171 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363763
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363762
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363761
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363759
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363764
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19364426
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363760
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337190
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337218
- BPlumbing, sinks and toiletsReplace with new the missing escutcheon plate at bathtub faucet in the 1st bathroom from northIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337225
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · rent impairing · Violation #19337193
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north, south and west wall in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337196
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft but less than 30 sq ft observed at ceiling, east and north wall in the…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337222
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19337179
- BOther repairsProperly repair with similar material the broken or defective marble saddle at entrance in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337195
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19337178
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash 1st window from east at north (fire escape access) in the 1st room from north…Issued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19337221
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at door in the entire apartmentIssued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19337220
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19337216
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337219
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19337217
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19337183
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337191
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337192
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south and west wall in the 1st bathroom from northIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337224
- BOther repairsProperly repair or replace the broken or defective wood base cabinet at north in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267715
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19267726
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling inside west closet in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267720
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside west closet in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267723
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19267725
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267716
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at the south wall in the 1st bathroom from north at westIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267708
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroom from north at westIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19267710
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267711
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267712
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of secondary egress door painted shut at south wall in the 2nd entrance from east at southIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19234496
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19206812
- BOther repairsReplace with new the missing escutcheon plate top of riser pipe in the 1st bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206800
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the 1st entrance from northIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19195875
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at north wall in south fire passagewayIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195846
- BOther repairs& 309 m/d law abate the nuisance consisting of continues heat in summer due to pipes at ceiling in the entire apartmentIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195886
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the foyerIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195856
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash window in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195854
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195852
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze finish at bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195850
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 4th room from east at northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195882
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the north west meter roomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195836
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19133732
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19133731
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet bowl in the 1st bathroom from northIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19133736
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet bowl in the 2nd bathroom from northIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19133752
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jul 20, 2026 · fix by Jul 26, 2026 overdue · Violation #19082652
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18965367
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 3, 2025 · fix by Nov 9, 2025 overdue · Violation #18340512
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft. at ceiling and all walls in the 2nd bathroom from eastIssued Oct 21, 2025 · fix by Nov 16, 2025 overdue · Violation #18321348
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jun 27, 2025 · fix by Jul 21, 2025 overdue · Violation #18052252
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 27, 2025 · fix by Jul 21, 2025 overdue · Violation #18052251
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jun 27, 2025 · fix by Jul 21, 2025 overdue · Violation #18052248
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 27, 2025 · fix by Jul 21, 2025 overdue · Violation #18052253
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 27, 2025 · fix by Jul 21, 2025 overdue · Violation #18052250
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.