Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2754 Grand Concourse, Bronx

10458 · 67 apartments · 5 stories · City Council district 15

By · Updated · Data from NYC HPD

C
203open immediately hazardous violations · 303 per 100 apartments
B266Hazardous, open
A40Non-hazardous, open
!506Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

29 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Open problems

All open violations in the building, by type.

  1. Other repairs
    117
  2. Lead paint
    86
  3. Mold
    58
  4. Peeling paint and plaster
    54
  5. Missing smoke or CO detector
    39
  6. Roaches
    36
  7. Leaks and water damage
    31
  8. Mice or rats
    27
  9. Broken doors or locks
    22
  10. No heat or hot water
    20
  11. Plumbing, sinks and toilets
    13
  12. Bedbugs
    4
  13. Electrical problems
    2
  14. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C83 days
from 192 closed · NYC typical: 87 days
B91 days
from 309 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19364076
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 10, 2026 · fix by Nov 7, 2026 overdue · rent impairing · Violation #19364073
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19356467
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19356468
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles a round bathtub in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19254672
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19254658
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19254654
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19254647
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19254663
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19254657
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19233814
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock on building entrance door at public hall, 1st storyIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19233751
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19233830
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19233807
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at north court yardIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19233740
  • B
    Other repairsProperly repair with similar material the broken or defective porcelain glaze at bathub in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19144529
  • C
    Other repairsProperly repair or replace the broken or defective counter balance lower sash at west wall in the 1st room from eastIssued Aug 17, 2026 · fix by Aug 23, 2026 overdue · Violation #19144531
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding more than 4 inches from window sill at…Issued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19124882
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19124903
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19124901
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 3rd story, section ''north''Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · rent impairing · Violation #19108771
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall and south wall in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108769
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19108766
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st storyIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108772
  • B
    Broken doors or locksProperly repair or replace the broken or defective door at entrance in the 1st room from east at southIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108767
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19069917
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070052
  • B
    MoldTrace and repair the source and abate the visible mold condition less then 10 sq feet at ceiling and south wall in the bathroomIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18947617
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18939991
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18898501
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18898499
  • B
    Other repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartment missingIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18898496
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of free refrigerator door intact at public hall, 5th storyIssued May 7, 2026 · fix by May 13, 2026 overdue · Violation #18863671
  • B
    Other repairsRemove all encumbrances consisting of house hold items at public hall, 5th storyIssued May 7, 2026 · fix by Jun 11, 2026 overdue · rent impairing · Violation #18899137
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18828445
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroomIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18863680
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 2nd storyIssued May 5, 2026 · fix by Jun 9, 2026 overdue · rent impairing · Violation #18863676
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18863682
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 3rd storyIssued May 5, 2026 · fix by Jun 9, 2026 overdue · rent impairing · Violation #18863674
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bath tub in the bathroomIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18863681
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood sink base cabinet in the kitchenIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18863683
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartmentIssued Apr 15, 2026 · fix by Apr 21, 2026 overdue · Violation #18785381
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18785383
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 1, 2026 · fix by Apr 25, 2026 overdue · Violation #18755879
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 1, 2026 · fix by Apr 25, 2026 overdue · Violation #18755877
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 31, 2026 · fix by Apr 26, 2026 overdue · Violation #18754828
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 31, 2026 · fix by Apr 26, 2026 overdue · Violation #18754824
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 1st storyIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18747348
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall at public hall, 1st storyIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18747350
  • B
    Other repairsRemove all encumbrances consisting of construction material and household items at public hall, 2nd story, section ''south''Issued Mar 30, 2026 · fix by May 4, 2026 overdue · rent impairing · Violation #18747361
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731502
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731506
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731508
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731500
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731501
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731505
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731507
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731499
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731498
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731503

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

952017
1512018
1382019
1462020
1292021
1882022
1472023
2802024
4432025
1402026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 2,512 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.