Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2815 Grand Concourse, Bronx

10468 · 47 apartments · 5 stories · City Council district 14

By · Updated · Data from NYC HPD

C
85open immediately hazardous violations · 181 per 100 apartments
B237Hazardous, open
A62Non-hazardous, open
!311Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

14 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyHEIGHTS REALTY CO. LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    96
  2. Peeling paint and plaster
    84
  3. Leaks and water damage
    48
  4. Broken doors or locks
    34
  5. Mice or rats
    27
  6. Roaches
    24
  7. Missing smoke or CO detector
    22
  8. Plumbing, sinks and toilets
    20
  9. Mold
    13
  10. Electrical problems
    8
  11. Lead paint
    8

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C80 days
from 128 closed · NYC typical: 84 days
B91 days
from 244 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective 13th marble thread from bottom up at public hall stairs, 2nd storyIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19369679
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protuding out 4'' pass sill at 3rd,4th and 5th…Issued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19369677
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19347261
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock iinstalled at door to (illegal) room with fire escape in the 3rd room from northIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19343203
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343198
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at west 1 window lower sash in the 3rd room from northIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19343201
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire running from light switch at east wall to ceiling light…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343207
  • B
    Broken doors or locksProperly repair or replace the broken or defective closet door in the private hallwayIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343206
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343204
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from northIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343205
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343197
  • B
    Other repairsProperly repair or replace the broken or defective lower rubber gasket at refrigerator in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343208
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343193
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343192
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall at public hall, 3rd story, section at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343178
  • B
    Leaks and water damageRepair the leaky and/or defective faucets spout at bathtub in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343195
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west and east wall in the 2nd room from eastIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343196
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at south wall at public hall stairs, 3rd storyIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343180
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 3rd story, section at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343176
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall at public hall, 4th story, section at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343175
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 4th story, section at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343173
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling and east wall at bulkhead at public hall, 5th story, section at southIssued Oct 29, 2026 · fix by Dec 3, 2026 · rent impairing · Violation #19343169
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at bulkhead at public hall, 5th story, section…Issued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343168
  • B
    Broken doors or locksProvide operable door knob allowing re-entry from roof to bulkhead at public hall, 5th story, section at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343172
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 22, 2026 · fix by Nov 15, 2026 overdue · Violation #19323600
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 22, 2026 · fix by Nov 15, 2026 overdue · Violation #19323601
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19304605
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19304603
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304602
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at west wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304600
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304604
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304601
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the 2nd room from north at westIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308844
  • B
    MoldTrace and repair the source and abate the visible mold condition observed greater than 20 sq ft of mold at north wall in the 2nd room from north at westIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308847
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from north at westIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308849
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308834
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from north at westIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308841
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308832
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile floor covering in the 2nd room from north at westIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308845
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308837
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308826
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 13, 2026 · fix by Nov 6, 2026 overdue · Violation #19290197
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 13, 2026 · fix by Nov 6, 2026 overdue · Violation #19290196
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 3rd room from east at southIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279359
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the foyerIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279354
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall, north wall and south wall in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279370
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyerIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279360
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279369
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall and west wall in the 1st room from eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279361
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall and north wall in the 2nd room from eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279362
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall and south wall in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279368
  • B
    Leaks and water damageRepair the leaky and/or defective faucets faucet at bathtub in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279367
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19279363
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279355
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall, north wall and south wall in the 3rd room from east at…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279366
  • B
    Broken doors or locksProperly repair or replace the broken or defective door at entrance in the 3rd room from east at northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279365
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall, north wall and south wall in the 3rd room from east at…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279364
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19279357
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 3rd room from east at northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279356
  • B
    Broken doors or locksProperly repair or replace the broken or defective door at entrance in the 1st room from eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279353

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1042017
32018
572019
502020
522021
222022
992023
1332024
1732025
4002026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,206 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.