Housing violations · Concourse-Concourse Village
730 Grand Concourse, Bronx
10451 · 56 apartments · 6 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster6
- Other repairs5
- Lead paint3
- Electrical problems2
- Missing smoke or CO detector2
- Roaches2
- Mice or rats2
- Mold1
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 5 closed · NYC typical: 87 days
from 35 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at north wall in the 5th room from east at northIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19124311
- BElectrical problemsReplace with new the missing safety covers / caps for electrical outlet at west wall at public hall, 1st storyIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766878
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Apr 7, 2026 · fix by Apr 21, 2026 overdue · Violation #18766875
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 5th room from east at northIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766861
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 5th room from east at northIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766862
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 5th room from east at northIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766864
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the 2nd bathroom from eastIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766865
- BOther repairsProperly repair with similar material the broken or defective wood saddle in the 1st bathroom from eastIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766866
- BOther repairsProperly repair or replace the broken or defective outer glass pane at lower window sash, 1st from south at west wall in the 5th room from east at southIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766869
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash, 2nd from south at west wall in the 5th room from east at southIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766870
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766871
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766872
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766867
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color over ceiling in the entire apartmentIssued Feb 18, 2026 · fix by Feb 24, 2026 overdue · Violation #12932300
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 26, 2022 · fix by Aug 19, 2022 overdue · Violation #15285573
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 26, 2022 · fix by Aug 19, 2022 overdue · Violation #15285574
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 26, 2022 · fix by Aug 19, 2022 overdue · Violation #15285576
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 31, 2019 · fix by Jan 21, 2020 overdue · Violation #13522875
- CMice or ratsAbate the infestation consisting of miceIssued Dec 31, 2019 · fix by Jan 21, 2020 overdue · Violation #13522874
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 28, 2019 · fix by Mar 21, 2019 overdue · Violation #12932461
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 28, 2019 · fix by Mar 21, 2019 overdue · Violation #12932460
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.