Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (South)

4151 Broadway, Manhattan

10033 · 62 apartments · 6 stories · City Council district 10

By · Updated · Data from NYC HPD

C
21open immediately hazardous violations · 34 per 100 apartments
B56Hazardous, open
A6Non-hazardous, open
!83Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyGVS PROPERTIES, LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    25
  2. Lead paint
    13
  3. Peeling paint and plaster
    9
  4. Roaches
    8
  5. Missing smoke or CO detector
    6
  6. Broken doors or locks
    5
  7. Electrical problems
    4
  8. Plumbing, sinks and toilets
    4
  9. Mice or rats
    3
  10. Leaks and water damage
    3
  11. Missing window guards
    2
  12. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C77 days
from 62 closed · NYC typical: 87 days
B86 days
from 41 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176272
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19176270
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19176271
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176273
  • B
    Other repairsProperly repair or replace the broken or defective lower cabinets at east wall in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176274
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19044617
  • B
    Other repairsProperly repair or replace the broken or defective spring balance upper sash first window from west at south in the 1st room from eastIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19056513
  • B
    Other repairsProperly repair or replace the broken or defective spring balance upper sash first window from west at south in the 3rd room from eastIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19056515
  • B
    Other repairsProperly repair or replace the broken or defective spring balance upper sash first window from west at south in the bathroomIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19056514
  • B
    Other repairsProperly repair or replace the broken or defective spring balance upper sash first window from west at south in the kitchenIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19056516
  • B
    Other repairsProperly repair or replace the broken or defective lower springs at the 1st and 2nd window from west at south in the 1st room from eastIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19051138
  • B
    Other repairsProperly repair or replace the broken or defective lower spring balance at the south window in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19051137
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 6, 2026 · fix by Jul 4, 2026 overdue · rent impairing · Violation #19051132
  • B
    Other repairsProperly repair or replace the broken or defective upper and lower spring balance at the east window in the kitchenIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19051134
  • B
    Other repairsProperly repair or replace the broken or defective upper glass pane at the south window in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19051136
  • B
    Other repairsProperly repair or replace the broken or defective lower spring balance at the 1st and 2nd window from west at south in the 3rd room from eastIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19051135
  • C
    Broken doors or locksProvide ready access to buildings heating system locked at the basement at boiler roomIssued Jul 6, 2026 · fix by Jul 12, 2026 overdue · Violation #19051133
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash window in the kitchenIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19007930
  • B
    Other repairsRefit the lower window sash in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18992000
  • B
    Broken doors or locksProperly repair or replace the broken or defective sash lock at window in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18992006
  • B
    Other repairsProperly repair or replace the broken or defective escutcheon plate at ceiling in the 1st room from north at eastIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18992004
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the north and south walls in the 2nd room from north at eastIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18992003
  • B
    Electrical problemsReplace with new the missing outlet cover at the east wall in the 2nd room from north at eastIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18992002
  • B
    Plumbing, sinks and toiletsReplace the broken or defective sink in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · rent impairing · Violation #18991998
  • B
    Other repairsProperly repair with similar material the broken or defective wood base cabinets at east and west walls in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991997
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the north and west walls in the 1st room from north at eastIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991995
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18991999
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jun 11, 2026 · fix by Jul 7, 2026 overdue · rent impairing · Violation #18992007
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18991994
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jun 8, 2026 · fix by Jun 14, 2026 overdue · Violation #18985363
  • C
    Other repairsProperly repair or replace the broken or defective lower sash window spring balances at north wall in the kitchenIssued May 22, 2026 · fix by May 28, 2026 overdue · Violation #18948532
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18667798
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18667795
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east and south walls in the bathroomIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18667796
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18667797
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at celing in the kitchenIssued Jan 29, 2026 · fix by Feb 4, 2026 overdue · Violation #18602297
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 29, 2026 · fix by Feb 24, 2026 overdue · Violation #18602300
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower sash window at west in the kitchenIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18555593
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower sash window at south in the bathroomIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18555592
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 9, 2026 · fix by Feb 4, 2026 overdue · Violation #18555591
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower sash window at south in the 3rd room from eastIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18555590
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at east wall in the bathroomIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534921
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line at sink in the bathroomIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534922
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the bathroomIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534923
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at floor in the bathroomIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534924
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534925
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at south wall in the 1st room from north at westIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534926
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534929
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534930
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534932
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 30, 2025 · fix by Jan 25, 2026 overdue · Violation #18534935
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 30, 2025 · fix by Jan 25, 2026 overdue · Violation #18534936
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the 1st room from north at westIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534934
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534927
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at south wall in the kitchenIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534937
  • B
    Broken doors or locksRefit upper and lower cabinet door at east wall in the kitchenIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18245980
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyerIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18246008
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18246007
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18245986
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 19, 2025 · fix by Jun 14, 2025 overdue · Violation #17904163

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

182017
312018
182019
92020
472021
322022
382023
422024
482025
552026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 473 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.