Housing violations · Crown Heights (North)
411 St Marks Avenue, Brooklyn
11238 · 3 apartments · 3 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
13 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster19
- Leaks and water damage18
- Broken doors or locks16
- Plumbing, sinks and toilets8
- Mold7
- Missing smoke or CO detector7
- No heat or hot water5
- Other repairs5
- Mice or rats3
- Electrical problems2
- Roaches2
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 9 closed · NYC typical: 87 days
from 16 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance door , 1st storyIssued Jun 1, 2026 · fix by Jun 7, 2026 overdue · Violation #18964595
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18762792
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Feb 19, 2026 · fix by Feb 25, 2026 overdue · Violation #18651671
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651669
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 19, 2026 · fix by Feb 18, 2026 overdue · rent impairing · Violation #18651670
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18603510
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 30, 2026 · fix by Jan 30, 2026 overdue · rent impairing · Violation #18603509
- CBroken doors or locksProperly repair or replace the broken or defective mortise lockset at building entrance doorIssued Jan 2, 2026 · fix by Jan 8, 2026 overdue · Violation #18540880
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler room, 1st storyIssued Dec 3, 2025 · fix by Dec 9, 2025 overdue · Violation #18471999
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 1, 2025 · fix by Nov 30, 2025 overdue · rent impairing · Violation #18471996
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 1, 2025 · fix by Nov 30, 2025 overdue · rent impairing · Violation #18472000
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub, upper level in the 2nd bathroom from northIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · rent impairing · Violation #18038839
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18038841
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Jun 27, 2025 · fix by Jul 3, 2025 overdue · Violation #18038834
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jun 27, 2025 · fix by Jul 3, 2025 overdue · Violation #18038833
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ciling in the 1st room from north at eastIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18038838
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18038837
- COther repairsProvide an adequate supply of gas to the fixtures at rang in the kitchenIssued Jun 27, 2025 · fix by Jul 3, 2025 overdue · rent impairing · Violation #18038832
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 27, 2025 · fix by Jul 3, 2025 overdue · Violation #18038836
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 27, 2025 · fix by Jul 3, 2025 overdue · Violation #18038835
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18038842
- BMoldTrace and repair the source and abate the visible mold condition less than 20 sq ft at east wall in the bathroomIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17766689
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17766691
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17766690
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east south and west walls in the bathroomIssued Mar 20, 2025 · fix by Apr 24, 2025 overdue · Violation #17766688
- CMoldTrace and repair the source and abate the visible mold condition approx 16 square feet at south wall in the bathroomIssued Jul 25, 2024 · fix by Aug 20, 2024 overdue · Violation #17148825
- CMoldTrace and repair the source and abate the visible mold condition approx 12 square feet at celing and north wall in the 1st room from northIssued Jul 25, 2024 · fix by Aug 20, 2024 overdue · Violation #17148824
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Jan 29, 2024 · fix by Mar 4, 2024 overdue · rent impairing · Violation #16600332
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Dec 28, 2023 · fix by Feb 1, 2024 overdue · Violation #16544020
- BBroken doors or locksProperly repair or replace the broken or defective locking assembly at building entrance door at public hall, 1st storyIssued Dec 28, 2023 · fix by Feb 1, 2024 overdue · Violation #16544025
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 28, 2022 · fix by Nov 27, 2022 overdue · rent impairing · Violation #15580191
- BMoldTrace and repair the source and abate the visible mold condition approx. 2 sq. ft. at ceiling in the bathroomIssued Sep 19, 2022 · fix by Oct 24, 2022 overdue · Violation #15380413
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 20, 2022 · fix by Jun 24, 2022 overdue · Violation #15157283
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 20, 2022 · fix by Jun 15, 2022 overdue · Violation #15157281
- CBroken doors or locksProperly repair the broken or defective locking device at building entrance door at public hall, 1st storyIssued May 20, 2022 · fix by May 26, 2022 overdue · Violation #15157286
- BBroken doors or locksReplace with new the broken or defective door in the 1st room from north at eastIssued May 20, 2022 · fix by Jun 24, 2022 overdue · Violation #15157285
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued May 16, 2022 · fix by Jun 20, 2022 overdue · Violation #15153479
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued May 16, 2022 · fix by Jun 20, 2022 overdue · Violation #15153474
- BBroken doors or locksProperly repair the broken or defective locking assembly at front door building entrance in the entranceIssued May 16, 2022 · fix by Jun 20, 2022 overdue · Violation #15153475
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles in the bathroomIssued May 16, 2022 · fix by Jun 20, 2022 overdue · Violation #15153476
- BOther repairsProperly repair the broken or defective window counter balance lower sash in the 4th room from northIssued May 16, 2022 · fix by Jun 20, 2022 overdue · Violation #15153477
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the bathroomIssued May 16, 2022 · fix by Jun 20, 2022 overdue · rent impairing · Violation #15153478
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued May 16, 2022 · fix by Jun 20, 2022 overdue · Violation #15153480
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 16, 2022 · fix by Jun 11, 2022 overdue · Violation #15153481
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 16, 2022 · fix by Jun 11, 2022 overdue · Violation #15153482
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wash basin wasteline in the bathroomIssued Mar 22, 2022 · fix by Apr 26, 2022 overdue · rent impairing · Violation #15070216
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 22, 2022 · fix by Apr 17, 2022 overdue · Violation #15070227
- CBroken doors or locksProperly repair the broken or defective heavy duty mortise lock and assembly for buiilding entrance door from the court yard at public hall, 1st storyIssued Mar 22, 2022 · fix by Mar 28, 2022 overdue · Violation #15070231
- BBroken doors or locksReplace with new the broken or defective wood door in the 1st room from north at eastIssued Jan 27, 2022 · fix by Mar 3, 2022 overdue · Violation #14792191
- BOther repairsProperly repair the broken or defective counter balance at lower sash, 3rd window from east at south wall in the 4th room from northIssued Jan 27, 2022 · fix by Mar 3, 2022 overdue · Violation #14792195
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jan 27, 2022 · fix by Mar 3, 2022 overdue · Violation #14792194
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Jan 27, 2022 · fix by Mar 3, 2022 overdue · Violation #14792193
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx. 1 sq.ft. at north wall approx. 3 sq.ft. and at east wall approx. 3 sq.ft.…Issued Oct 14, 2021 · fix by Nov 18, 2021 overdue · Violation #14627164
- BMoldTrace and repair the source and abate the visible mold condition at east wall (approx. 2 sq. ft.) in the bathroomIssued Oct 13, 2021 · fix by Nov 17, 2021 overdue · Violation #14625660
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 1st room from north at eastIssued Jun 16, 2021 · fix by Jul 21, 2021 overdue · Violation #14389960
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window recess at north wall in the 1st room from north at eastIssued Jun 16, 2021 · fix by Jul 21, 2021 overdue · Violation #14389964
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window recess at north wall in the 1st room from north at westIssued Jun 16, 2021 · fix by Jul 21, 2021 overdue · Violation #14389978
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 16, 2021 · fix by Jul 21, 2021 overdue · Violation #14389999
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside the closet at south wall in the 1st room from north at eastIssued Jun 16, 2021 · fix by Jul 21, 2021 overdue · Violation #14390013
- BLead paintProperly repair the broken or defective mortise lock at north wall door leading to rear yard in the 1st room from north at eastIssued Jun 16, 2021 · fix by Jul 21, 2021 overdue · Violation #14390019
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.