Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (North)

700 West 180 Street, Manhattan

10033 · 45 apartments · 6 stories · City Council district 10

By · Updated · Data from NYC HPD

C
20open immediately hazardous violations · 44 per 100 apartments
B6Hazardous, open
A9Non-hazardous, open
!27Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company700 WEST 180 STREET ASSOC
Landlord (head officer or owner)Smajlje Srdanovic

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    12
  2. Lead paint
    11
  3. Other repairs
    4
  4. No heat or hot water
    3
  5. Broken doors or locks
    2
  6. Leaks and water damage
    1
  7. Roaches
    1
  8. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C199 days
from 9 closed · NYC typical: 87 days
B472 days
from 2 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19368729
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19368720
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347235
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 5th room from east at southIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347229
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 2, 2025 · fix by Dec 1, 2025 overdue · rent impairing · Violation #18473239
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 2, 2025 · fix by Jan 28, 2025 overdue · Violation #17588186
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 16, 2024 · fix by Dec 30, 2024 overdue · Violation #17553603
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 9, 2024 · fix by Jan 4, 2025 overdue · Violation #17531320
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 1, 2021 · fix by Nov 25, 2021 overdue · Violation #14657813
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 1, 2021 · fix by Nov 25, 2021 overdue · Violation #14657811
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 12, 2021 · fix by Aug 5, 2021 overdue · Violation #14430913
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 12, 2021 · fix by Aug 5, 2021 overdue · Violation #14430912
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 10, 2017 · fix by Oct 18, 2017 overdue · rent impairing · Violation #12004309
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Sep 27, 2017 · fix by Oct 5, 2017 overdue · rent impairing · Violation #11991654
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 15, 2016 · fix by Oct 13, 2016 overdue · Violation #11391656
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd private hallway from eastIssued Sep 15, 2016 · fix by Oct 20, 2016 overdue · Violation #11384422
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchenIssued Sep 15, 2016 · fix by Oct 20, 2016 overdue · Violation #11384418
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 15, 2016 · fix by Oct 13, 2016 overdue · Violation #11391653
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall in the 1st room from east at northIssued Sep 15, 2016 · fix by Oct 20, 2016 overdue · Violation #11384421
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Sep 15, 2016 · fix by Oct 13, 2016 overdue · Violation #11391652
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 15, 2016 · fix by Oct 13, 2016 overdue · Violation #11391655
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, east wall, ceiling in the bathroomIssued Sep 15, 2016 · fix by Oct 20, 2016 overdue · Violation #11384423
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 15, 2016 · fix by Oct 13, 2016 overdue · Violation #11391657
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 9, 2016 · fix by Oct 7, 2016 overdue · Violation #11385448
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 9, 2016 · fix by Oct 7, 2016 overdue · Violation #11385447
  • C
    Other repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Sep 6, 2016 · fix by Oct 4, 2016 overdue · Violation #11379120

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

42017
182020
112021
12022
122024
42025
102026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 81 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.