Housing violations · Washington Heights (North)
4241 Broadway, Manhattan
10033 · 61 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster18
- Other repairs12
- Leaks and water damage5
- Broken doors or locks4
- Mold4
- Missing smoke or CO detector4
- Roaches3
- Electrical problems1
- Plumbing, sinks and toilets1
- Missing window guards1
- Mice or rats1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 27 closed · NYC typical: 87 days
from 22 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BBroken doors or locksProperly repair or replace the broken or defective door at lower base cabinet at north wall in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108349
- BBroken doors or locksProperly repair or replace the broken or defective hinges at upper cabinet doors at south wall in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108350
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 6th room from eastIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108353
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from eastIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108352
- BMoldTrace and repair the source and abate the visible mold condition greater than ten square feet at north wall in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108354
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108355
- BOther repairsProperly repair or replace the broken or defective vanity cabinet at west wall in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108356
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108347
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 7th room from eastIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108348
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108351
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 27, 2026 · fix by Aug 22, 2026 overdue · Violation #19100204
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 12, 2026 · fix by Feb 18, 2026 overdue · Violation #18636504
- BMoldTrace and repair the source and abate the visible mold condition less than 15 square feet at ceiling in the bathroomIssued Feb 12, 2026 · fix by Mar 19, 2026 overdue · Violation #18636503
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 6th room from eastIssued Feb 12, 2026 · fix by Feb 18, 2026 overdue · Violation #18636501
- BOther repairsProperly repair or replace the broken or defective radiator in the 5th room from eastIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18629414
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18629412
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash 1st window at east in the 1st room from east at northIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18629411
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18629410
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18629409
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 2nd room from eastIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18629408
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18629413
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18594342
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroomIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18594343
- BOther repairsProperly repair with similar material the broken or defective ceramic tile floor in the kitchenetteIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16974799
- BBroken doors or locksProperly repair or replace the broken or defective wood base sink cabinet doors in the kitchenIssued Mar 18, 2024 · fix by Apr 22, 2024 overdue · Violation #16751550
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste line at sink in the kitchenIssued Mar 18, 2024 · fix by Apr 22, 2024 overdue · Violation #16751549
- BOther repairsRemove all obstructions and repair all defects in bath tub waste pipe in the 1st bathroom from northIssued Mar 18, 2024 · fix by Apr 22, 2024 overdue · rent impairing · Violation #16751548
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15374999
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 6th room from east at northIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15375001
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15375000
- BOther repairsReplace with new the missing escutcheon plate at top of steam riser in the kitchenIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15374998
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from eastIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15375003
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from eastIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15375002
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 29, 2021 · fix by Oct 25, 2021 overdue · Violation #14590164
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 30, 2020 · fix by Nov 5, 2020 overdue · rent impairing · Violation #13872075
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at walls in the kitchenIssued Aug 28, 2020 · fix by Oct 2, 2020 overdue · Violation #13773798
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the foyerIssued Aug 28, 2020 · fix by Oct 2, 2020 overdue · Violation #13773796
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jul 2, 2018 · fix by Jul 30, 2018 overdue · Violation #12455836
- CMice or ratsAbate the nuisance consisting of rodents rats excreata in the entire apartmentIssued Dec 29, 2017 · fix by Jan 6, 2018 overdue · rent impairing · Violation #12163036
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Dec 29, 2017 · fix by Feb 2, 2018 overdue · Violation #12163028
- BOther repairsReplace with new the broken or defective escutcheon plate above heat riser in the bathroomIssued Dec 29, 2017 · fix by Feb 2, 2018 overdue · Violation #12163035
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceiling in the 2nd room from north at eastIssued Dec 29, 2017 · fix by Feb 2, 2018 overdue · Violation #12163034
- BOther repairsProperly repair the broken or defective ceiling light fixture in the 2nd room from north at eastIssued Dec 29, 2017 · fix by Feb 2, 2018 overdue · Violation #12163033
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Dec 29, 2017 · fix by Feb 2, 2018 overdue · Violation #12163031
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroomIssued Sep 14, 2017 · fix by Oct 19, 2017 overdue · Violation #11972817
- BMoldTrace and repair the source and abate the nuisance consisting of mold at ceiling and walls in the bathroomIssued Sep 14, 2017 · fix by Oct 19, 2017 overdue · Violation #11972818
- BBroken doors or locksReplace with new the broken or defective glass pane at door in the 1st room from north at eastIssued Sep 14, 2017 · fix by Oct 19, 2017 overdue · Violation #11972821
- BMissing smoke or CO detectorRepair or replace the smoke detector , defectiveIssued Sep 14, 2016 · fix by Oct 19, 2016 overdue · Violation #11386260
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defectiveIssued Sep 14, 2016 · fix by Oct 19, 2016 overdue · Violation #11386271
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 17, 2010 · fix by Apr 12, 2010 overdue · Violation #8327710
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Nov 17, 2004 · fix by Dec 13, 2004 overdue · Violation #5200859
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.