Housing violations · Washington Heights (North)
4308 Broadway, Manhattan
10033 · 21 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs17
- Peeling paint and plaster14
- Lead paint8
- Mold6
- Missing smoke or CO detector5
- Leaks and water damage4
- Broken doors or locks3
- Mice or rats2
- Electrical problems2
- Roaches2
- Missing window guards2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 21 closed · NYC typical: 87 days
from 20 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 19, 2026 · fix by Sep 14, 2026 overdue · Violation #19140613
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19140615
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19140614
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction material at rear yardIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18864106
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 22, 2025 · fix by Jan 5, 2026 overdue · Violation #18517633
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of electrical g.f.i at north wall in the kitchenIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18522933
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18522941
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from eastIssued Aug 22, 2025 · fix by Sep 26, 2025 overdue · Violation #18172686
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Aug 22, 2025 · fix by Sep 26, 2025 overdue · Violation #18172685
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 28, 2025 · fix by Aug 21, 2025 overdue · Violation #18120014
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 28, 2025 · fix by Aug 3, 2025 overdue · Violation #18113551
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 28, 2025 · fix by Aug 21, 2025 overdue · Violation #18120011
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 28, 2025 · fix by Aug 21, 2025 overdue · Violation #18120013
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 11, 2025 · fix by Jun 17, 2025 overdue · Violation #17975679
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jun 21, 2022 · fix by Jul 15, 2022 overdue · Violation #15224180
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 21, 2022 · fix by Jul 15, 2022 overdue · Violation #15224017
- BOther repairsProperly repair with similar material the broken or defective missing and deteriorated mortar at, brick joints, parapet wall, south yardIssued Mar 21, 2022 · fix by Apr 25, 2022 overdue · Violation #15052157
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 21, 2022 · fix by Apr 14, 2022 overdue · Violation #15069243
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Feb 28, 2022 · fix by Mar 24, 2022 overdue · Violation #14931115
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2021 · fix by Nov 10, 2021 overdue · Violation #14620420
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2021 · fix by Nov 10, 2021 overdue · Violation #14620419
- BMoldTrace and repair the source and abate the visible mold condition at north wall 10 sq.ft in the bathroomIssued Oct 15, 2021 · fix by Nov 19, 2021 overdue · Violation #14620405
- BMoldTrace and repair the source and abate the visible mold condition at south wall in the bathroomIssued Nov 23, 2020 · fix by Dec 28, 2020 overdue · Violation #13909107
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Dec 26, 2019 · fix by Jan 30, 2020 overdue · Violation #13511841
- BOther repairsProperly repair with similar material the broken or defective wood foor in the 2nd room from north at westIssued Dec 26, 2019 · fix by Jan 30, 2020 overdue · Violation #13511840
- CMoldTrace and repair the source and abate the visible mold condition 30 sq ft at ceiling and all walls in the 1st bathroom from northIssued Dec 9, 2019 · fix by Dec 30, 2019 overdue · Violation #13444372
- BMoldTrace and repair the source and abate the nuisance consisting of mold at north wall (20 sq-ft) at public hall stairs, 2nd storyIssued Oct 15, 2018 · fix by Nov 19, 2018 overdue · Violation #12655699
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Aug 8, 2018 · fix by Sep 12, 2018 overdue · Violation #12516894
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 16, 2018 · fix by Aug 20, 2018 overdue · Violation #12470810
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall, west wall, east wall in the bathroomIssued Jul 16, 2018 · fix by Aug 20, 2018 overdue · Violation #12470809
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the 2nd room from east at northIssued Jul 16, 2018 · fix by Aug 20, 2018 overdue · Violation #12470807
- BBroken doors or locksReplace with new the missing spring lockset at door in the bathroomIssued Jul 16, 2018 · fix by Aug 20, 2018 overdue · Violation #12470804
- BOther repairsProperly repair with similar material the broken or defective /rotten wood floor nearby south wall in the 2nd room from east at northIssued Jul 16, 2018 · fix by Aug 20, 2018 overdue · Violation #12470803
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the in the bathroomIssued Jul 16, 2018 · fix by Aug 20, 2018 overdue · Violation #12470801
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued May 11, 2018 · fix by Jun 15, 2018 overdue · Violation #12377801
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at west wall in the kitchenIssued May 11, 2018 · fix by Jun 15, 2018 overdue · Violation #12377799
- BMoldTrace and repair the source and abate the nuisance consisting of mold , west wall in the bathroomIssued May 2, 2018 · fix by Jun 6, 2018 overdue · Violation #12362066
- BMoldTrace and repair the source and abate the nuisance consisting of mold , north wall in the bathroomIssued May 2, 2018 · fix by Jun 6, 2018 overdue · Violation #12362065
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued May 2, 2018 · fix by Jun 6, 2018 overdue · Violation #12362060
- COther repairsProperly repair with similar material the broken or defective concrete and ceramic tiles floor in the bathroomIssued Jan 22, 2018 · fix by Jan 30, 2018 overdue · Violation #12203194
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jan 22, 2018 · fix by Feb 26, 2018 overdue · Violation #12203191
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jan 22, 2018 · fix by Feb 26, 2018 overdue · Violation #12203189
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallwayIssued Jan 9, 2018 · fix by Feb 13, 2018 overdue · Violation #12175406
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall in the 1st room from eastIssued Jan 9, 2018 · fix by Feb 13, 2018 overdue · Violation #12175405
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles floor. at public hall, 1st storyIssued Aug 22, 2016 · fix by Sep 26, 2016 overdue · Violation #11360626
- CBroken doors or locksRemove the illegal fastening key operated push bar alarm at stairs bulkhead north door to roofIssued Aug 17, 2016 · fix by Aug 25, 2016 overdue · rent impairing · Violation #11353602
- CLead paintSection 27-2056.6 adm code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated…Issued Jun 6, 2016 · fix by Jul 4, 2016 overdue · Violation #11261529
- CMissing window guardsSection 27-2043.1 hmc install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health…Issued Jun 22, 2015 · fix by Jul 20, 2015 overdue · Violation #10752879
- CLeaks and water damageSection 27-2026 adm code repair the leaky and/or defective faucets at washbasin, water temp 162f at bathroomIssued Dec 4, 2013 · fix by Dec 12, 2013 overdue · Violation #10050145
- COther repairsSection 27-2070 adm code provide an adequate supply of gas to the fixtures at kitchenIssued Dec 4, 2013 · fix by Dec 12, 2013 overdue · rent impairing · Violation #10050141
- CMissing window guardsSection 27-2043.1 hmc install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health…Issued Sep 30, 2013 · fix by Oct 28, 2013 overdue · Violation #9986619
- COther repairsSection 27-2070 adm code provide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Aug 28, 2013 · fix by Sep 5, 2013 overdue · rent impairing · Violation #9953776
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective wood floor in the entire apartmentIssued Jan 30, 2013 · fix by Mar 6, 2013 overdue · Violation #9719062
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceilings and walls in the entire apartmentIssued Jan 30, 2013 · fix by Mar 6, 2013 overdue · Violation #9719067
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jan 30, 2013 · fix by Mar 6, 2013 overdue · Violation #9719066
- CLeaks and water damageSection 27-2005 adm code & 309 m/d law abate the nuisance consisting of concealed water leak at ceiling in the bathroomIssued Mar 30, 2012 · fix by Apr 5, 2012 overdue · Violation #9384388
- COther repairsSection 27-2005 adm code replace with new the broken or defective lower sash at fire escape window in the 3rd room from eastIssued Mar 30, 2012 · fix by Apr 5, 2012 overdue · Violation #9384392
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.