Housing violations · Washington Heights (North)
100 Thayer Street, Manhattan
10040 · 57 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint10
- Peeling paint and plaster9
- Other repairs8
- Leaks and water damage5
- Roaches4
- Mice or rats2
- Mold1
- Plumbing, sinks and toilets1
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 29 closed · NYC typical: 87 days
from 59 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the private hallwayIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287722
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240752
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240757
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19240749
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east at northIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240753
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 22, 2026 · fix by Oct 18, 2026 overdue · Violation #19240756
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 22, 2026 · fix by Oct 18, 2026 overdue · Violation #19240755
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166126
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166123
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166125
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Aug 19, 2026 · fix by Aug 25, 2026 overdue · Violation #19151885
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19144615
- BOther repairsProperly repair or replace the broken or defective spring balance at window bottom sash at west wall in the 2nd room from north at westIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19144609
- BOther repairsProperly repair or replace the broken or defective window spring balance lower sash at west wall in the 2nd room from northIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151812
- BMoldTrace and repair the source and abate the visible mold condition greater than ten square feet at north wall in the 3rd room from east at northIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146020
- BOther repairsProperly repair or replace the broken or defective window glass pane at lower sash at west wall in the 2nd room from north at westIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19144610
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151867
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151868
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at westIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19144613
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 19, 2026 · fix by Sep 14, 2026 overdue · Violation #19151880
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 19, 2026 · fix by Sep 14, 2026 overdue · Violation #19151896
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19144598
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood panel at bottom at wash basin cabinet in the bathroomIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776067
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776064
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18776074
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18556196
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18556195
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18549407
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542715
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542721
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542713
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542714
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 2, 2026 · fix by Feb 6, 2026 overdue · Violation #18542720
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Dec 26, 2025 · fix by Dec 30, 2025 overdue · Violation #18536699
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Dec 26, 2025 · fix by Dec 30, 2025 overdue · Violation #18536700
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Mar 7, 2024 · fix by Apr 11, 2024 overdue · Violation #16723639
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from eastIssued Jan 8, 2024 · fix by Feb 12, 2024 overdue · Violation #16569744
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 2nd room from northIssued Sep 15, 2023 · fix by Oct 20, 2023 overdue · Violation #16220662
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 15, 2023 · fix by Oct 11, 2023 overdue · Violation #16220668
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.