Housing violations · Inwood
4861 Broadway, Manhattan
10034 · 146 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs35
- Peeling paint and plaster27
- Lead paint17
- Broken doors or locks7
- Leaks and water damage6
- Roaches5
- Plumbing, sinks and toilets5
- Mice or rats4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 36 closed · NYC typical: 87 days
from 53 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Nov 16, 2026 · Violation #13664627
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19331440
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the foyerIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · rent impairing · Violation #19129909
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Aug 13, 2026 · fix by Aug 19, 2026 overdue · Violation #19129908
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from eastIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · rent impairing · Violation #19129906
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129907
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 12, 2026 · fix by Sep 7, 2026 overdue · Violation #19129905
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 27, 2026 · fix by Aug 22, 2026 overdue · Violation #19085189
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 27, 2026 · fix by Aug 22, 2026 overdue · Violation #19085190
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at north yardIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19105162
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 27, 2026 · fix by Aug 22, 2026 overdue · rent impairing · Violation #19085191
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948698
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948700
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948699
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 26, 2026 · fix by Jun 21, 2026 overdue · Violation #18948679
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 26, 2026 · fix by Jun 21, 2026 overdue · Violation #18948680
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd bathroom from eastIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948681
- BOther repairsProperly repair with similar material the broken or defective marble saddle at entrance in the 2nd bathroom from eastIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948683
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the 2nd bathroom from eastIssued May 26, 2026 · fix by Jun 30, 2026 overdue · rent impairing · Violation #18948684
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948688
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948689
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948690
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948691
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948693
- BOther repairsProperly repair with similar material the broken or defective wood sub floor in the private hallwayIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948694
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyerIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948695
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the foyerIssued May 26, 2026 · fix by Jun 1, 2026 overdue · Violation #18948696
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18948697
- COther repairs& 309 m/d law abate the nuisance consisting of protruding nails from wood floor in the foyerIssued May 26, 2026 · fix by Jun 1, 2026 overdue · Violation #18955015
- CBroken doors or locksProperly repair or replace the broken or defective glass pane at entrance door in the 2nd room from northIssued May 26, 2026 · fix by Jun 1, 2026 overdue · Violation #18948692
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from eastIssued May 26, 2026 · fix by Jun 1, 2026 overdue · Violation #18948685
- BOther repairsProperly repair with similar material the broken or defective hard wood floor in the 1st room from east at northIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17869003
- BOther repairsProperly repair with similar material the broken or defective hard wood floor in the 4th room from eastIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17869005
- BOther repairsProperly repair with similar material the broken or defective hard wood floor in the 2nd room from east at southIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17869004
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855159
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 5th room from northIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855166
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855158
- BOther repairsProperly repair with similar material the broken or defective wood floor under radiator in the 3rd room from northIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855154
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from northIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855153
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855168
- BOther repairsProperly repair or replace the broken or defective 1st and 2nd upper window sashes at south wall in the 3rd room from northIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855157
- BOther repairsProperly repair with similar material the broken or defective metal base cabinet at north wall in the kitchenIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855165
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855164
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from northIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855170
- BOther repairsProperly repair with similar material the broken or defective wood sub floor in the private hallwayIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855169
- BOther repairsProperly repair or replace the broken or defective escutcheon plate at top of heat riser in the bathroomIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855160
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket seal at refrigerator door in the kitchenIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17855155
- BOther repairsProperly repair or replace the broken or defective ceramic floor tiles in the bathroomIssued Nov 13, 2024 · fix by Dec 18, 2024 overdue · Violation #17415203
- BOther repairsProperly repair or replace the broken or defective floor sagging or sloping in the bathroomIssued Nov 13, 2024 · fix by Dec 18, 2024 overdue · Violation #17415202
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Nov 13, 2024 · fix by Dec 18, 2024 overdue · Violation #17415201
- COther repairsProperly repair or replace the broken or defective ceramic tile floor in the bathroomIssued Sep 3, 2024 · fix by Sep 9, 2024 overdue · Violation #17230286
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic floor tile around washbasin in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16928001
- BOther repairsReplace with new the missing base cabinet at east wall in the kitchenIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16928006
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 8, 2024 · fix by Mar 5, 2024 overdue · Violation #16656475
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 8, 2024 · fix by Mar 5, 2024 overdue · Violation #16656474
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the bathroomIssued Feb 8, 2024 · fix by Mar 14, 2024 overdue · rent impairing · Violation #16656586
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 8, 2024 · fix by Mar 14, 2024 overdue · Violation #16656587
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jan 2, 2024 · fix by Feb 6, 2024 overdue · Violation #16526993
- BBroken doors or locksProperly repair or replace the broken or defective door frame in the bathroomIssued Jan 2, 2024 · fix by Feb 6, 2024 overdue · Violation #16526997
- BPlumbing, sinks and toiletsReplace the broken or defective cracked washbasin in the bathroomIssued Jan 2, 2024 · fix by Feb 6, 2024 overdue · rent impairing · Violation #16526996
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.