Housing violations · Bedford-Stuyvesant (East)
910 De Kalb Avenue, Brooklyn
11221 · 64 apartments · 5 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster30
- Other repairs23
- Roaches15
- Leaks and water damage15
- Mice or rats9
- Electrical problems7
- Mold6
- Missing smoke or CO detector6
- Broken doors or locks5
- Plumbing, sinks and toilets5
- Lead paint1
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 4 closed · NYC typical: 87 days
from 2 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19356394
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19272634
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19272632
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19272633
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19272635
- BLead paintRemove the illegal fastening push panic bar installed at stair bulkhead leading to the roof preventing reentry from the roof to the buildingIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19274288
- BOther repairsProperly repair with similar material the broken or defective at ceiling at public hall, 5th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274252
- BBroken doors or locksRefit door in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237694
- BOther repairsProperly repair or replace the broken or defective ventilation system at west wall in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237706
- BElectrical problemsReplace with new the missing electrical outlet cover at east wall in the private hallwayIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237704
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd room from northIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237707
- BPlumbing, sinks and toiletsRepair the broken or defective connection at wasteline at sink in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237705
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237703
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 23, 2026 · fix by Oct 19, 2026 overdue · Violation #19237702
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the private hallwayIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237701
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at south wall in the 2nd room from northIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237700
- BBroken doors or locksProperly repair or replace the broken or defective rubber seal at lower refrigerator door in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237699
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237698
- BOther repairsProperly repair or replace the broken or defective ventilation system at south wall in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237697
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from northIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237696
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling in the private hallwayIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237695
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the private hallwayIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237708
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19211220
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19211229
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19211230
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19211223
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19211228
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the foyerIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19211231
- BMoldTrace and repair the source and abate the visible mold condition less than 10 squre feet at ceiling in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19194466
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19053995
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19053994
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the foyerIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18946240
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18946236
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18851212
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18851211
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18795106
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at north wall in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18795109
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18795107
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 20, 2026 · fix by May 16, 2026 overdue · Violation #18795110
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18795108
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18352305
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 2nd room from eastIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18352306
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at south wall in the 2nd room from eastIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098774
- BOther repairsProperly repair or replace the broken or defective mechanical air vent in the kitchenIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18075374
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from eastIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · rent impairing · Violation #18075380
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18075382
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 8, 2025 · fix by Aug 3, 2025 overdue · Violation #18075376
- BOther repairsProperly repair or replace the broken or defective mechanical air vent in the bathroomIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18075375
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 8, 2025 · fix by Aug 3, 2025 overdue · Violation #18075377
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18075378
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Apr 24, 2025 · fix by May 29, 2025 overdue · Violation #17845182
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from eastIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17749106
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 19, 2025 · fix by Apr 14, 2025 overdue · Violation #17764316
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 19, 2025 · fix by Apr 14, 2025 overdue · Violation #17764315
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling north and west walls in the foyerIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · Violation #17764314
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the foyerIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · rent impairing · Violation #17764313
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling north and west walls in the 2nd room from northIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · Violation #17764312
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from northIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · rent impairing · Violation #17764311
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 2nd room from eastIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17758764
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17758765
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.