Housing violations · Tremont
2080 La Fontaine Avenue, Bronx
10457 · 74 apartments · 8 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster34
- Broken doors or locks18
- Other repairs11
- Leaks and water damage10
- Plumbing, sinks and toilets7
- Mice or rats5
- Missing smoke or CO detector5
- Roaches4
- Mold3
- No heat or hot water1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 189 closed · NYC typical: 87 days
from 352 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set emergency exit door to west yard (through stair b) at public hall stairs, 1st…Issued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19361217
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the private hallwayIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361209
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361210
- CBroken doors or locksRemove device preventing door from being self-closing recycling bin at door to garbage room at public hall, 6th story, section ''west''Issued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19361216
- CBroken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at emergency exit door (through stair b) at public hall stairs, 1st story,…Issued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19361218
- BBroken doors or locksProperly repair or replace the broken or defective return buzzer intercom system from the building entrance door to the apartment wall panel in the foyerIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361215
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19361212
- BBroken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at door in the entranceIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361211
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at washbasin in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · rent impairing · Violation #19361213
- BOther repairsProperly repair or replace the broken or defective 1st light switch cover from south at west wall in the 1st room from east at northIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361214
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color window frame 1st window from west at north in the 3rd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352375
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at trash room door at public hall, 6th storyIssued Oct 1, 2026 · fix by Oct 15, 2026 overdue · Violation #19263209
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19173860
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective washbasin cabinet in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19173861
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the 2nd room from northIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19173857
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the 3rd room from northIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19173855
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 5th storyIssued Aug 21, 2026 · fix by Sep 4, 2026 overdue · Violation #19158944
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door in the entranceIssued Aug 21, 2026 · fix by Sep 4, 2026 overdue · Violation #19158927
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 6th storyIssued Aug 21, 2026 · fix by Sep 4, 2026 overdue · Violation #19158942
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door at staircase a at public hall stairs, 1st storyIssued Aug 21, 2026 · fix by Sep 4, 2026 overdue · Violation #19158953
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at compactor closet door at public hall, 5th storyIssued Aug 17, 2026 · fix by Aug 31, 2026 overdue · Violation #19142546
- BBroken doors or locksProperly repair or replace the broken or defective latch set and assemblies at compactor closet door at public hall, 6th storyIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19142529
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at fire door (''a'' stair) at public hall, 1st storyIssued Aug 17, 2026 · fix by Aug 31, 2026 overdue · Violation #19142521
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at compactor closet door at public hall, 6th storyIssued Aug 17, 2026 · fix by Aug 31, 2026 overdue · Violation #19142528
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19142511
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19142509
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19142495
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft of mold at east wall in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19145373
- BBroken doors or locksProperly repair or replace the broken or defective latch set and assemblies at compactor closet door at public hall, 5th storyIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19142547
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at northIssued Aug 5, 2026 · fix by Aug 11, 2026 overdue · Violation #19116503
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19116498
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east at northIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19116504
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19116505
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Aug 5, 2026 · fix by Aug 11, 2026 overdue · Violation #19116500
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Aug 5, 2026 · fix by Aug 11, 2026 overdue · Violation #19116501
- BMoldTrace and repair the source and abate the visible mold condition greater than (10) sq ft at ceiling in the 3rd room from eastIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19116502
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096610
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096608
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the 1st room from northIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082458
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from northIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082459
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082462
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and north walls in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025814
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel bathtub by method of reglazing in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025815
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from eastIssued Jun 18, 2026 · fix by Jul 23, 2026 overdue · rent impairing · Violation #19017763
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from eastIssued Jun 18, 2026 · fix by Jul 23, 2026 overdue · rent impairing · Violation #19017764
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in in wasteline at sink in the kitchenIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · rent impairing · Violation #19017754
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19017751
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from eastIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19017759
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drainline at bathtub in the bathroomIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · rent impairing · Violation #19017753
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window stool at west wall in the 1st room from northIssued Jun 3, 2026 · fix by Jul 8, 2026 overdue · Violation #18974892
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the private hallwayIssued Jun 3, 2026 · fix by Jul 8, 2026 overdue · rent impairing · Violation #18974891
- BOther repairsProperly repair or replace the broken or defective mechanical handle at manual casement window in the bathroomIssued Jun 3, 2026 · fix by Jul 8, 2026 overdue · Violation #18974889
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18974897
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls throughout entire apartment. in the entire apartmentIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18973064
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceilings throughout entire apartment in the entire apartmentIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18973062
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · rent impairing · Violation #18973061
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at window frame at west wall window in the 1st room from eastIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18973059
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 9, 2026 · fix by May 5, 2026 overdue · Violation #18772077
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772074
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and wall in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772075
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.