Housing violations · Pelham Bay-Country Club-City Island
1632 Hutch River Parkway East, Bronx
10461 · 44 apartments · 9 stories · City Council district 13
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks19
- Other repairs12
- Mold11
- Missing smoke or CO detector9
- No heat or hot water6
- Peeling paint and plaster6
- Mice or rats5
- Leaks and water damage4
- Plumbing, sinks and toilets3
- Roaches2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 20 closed · NYC typical: 87 days
from 31 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective light fixture at east wall [total of 1] at public hall, 7th storyIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19257449
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling (total of 1) at public hall, 1st storyIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19257450
- CNo heat or hot waterProvide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the…Issued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19248662
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at stair (a) 3rd story at public hall stairs, 3rd storyIssued Sep 28, 2026 · fix by Oct 12, 2026 overdue · Violation #19250717
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19248664
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door a at public hall stairs, 8th storyIssued Sep 28, 2026 · fix by Oct 12, 2026 overdue · Violation #19250713
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at stair a at public hall stairs, 6th storyIssued Sep 28, 2026 · fix by Oct 12, 2026 overdue · Violation #19250715
- BOther repairsProvide adequate light of not less than 60 watts incandescent or equivalent illumination 3rd light fixture from south at west wall 5th story at public hall,…Issued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19250716
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at stair (b) 2nd story at public hall stairs, 2nd storyIssued Sep 28, 2026 · fix by Oct 12, 2026 overdue · Violation #19250719
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at stair (b) 3rd story at public hall stairs, 3rd storyIssued Sep 28, 2026 · fix by Oct 12, 2026 overdue · Violation #19250718
- BOther repairsProperly repair or replace the broken or defective 3rd light fixture from north at east wall at public hall, 7th storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19250714
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 28, 2026 · fix by Sep 26, 2026 overdue · rent impairing · Violation #19248663
- BMoldTrace and repair the source and abate the visible mold condition less than 30 sq ft at ceiling in the 2nd bathroom from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156361
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19156364
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wasteline pipe under washbasin in the 2nd bathroom from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · rent impairing · Violation #19156360
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wasteline pipe under washbasin in the 1st bathroom from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · rent impairing · Violation #19156362
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19156363
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018097
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018098
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at ceiling in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18739553
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective [hinge] door in the entranceIssued Nov 20, 2025 · fix by Dec 4, 2025 overdue · Violation #18392550
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 6, 2025 · fix by Nov 20, 2025 overdue · Violation #18349637
- BBroken doors or locksRefit building entrance door from street at public hall, 1st storyIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18065574
- CBroken doors or locksRemove device preventing door from being self-closing door sweep/ carpet preventing door from self closeing in the entranceIssued Jun 20, 2025 · fix by Jul 4, 2025 overdue · Violation #18039161
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective [door] door in the entranceIssued Jun 20, 2025 · fix by Jul 4, 2025 overdue · Violation #18039162
- CBroken doors or locksRemove device preventing door from being self-closing hook and eye installed on door from street to vestibule at 1st story at public hallIssued Jun 20, 2025 · fix by Jul 4, 2025 overdue · Violation #18039168
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the 1st bathroom from east at northIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18039159
- CBroken doors or locksProvide ready access to buildings heating system lock door at boiler roomIssued Dec 26, 2024 · fix by Jan 1, 2025 overdue · Violation #17575868
- BOther repairsProperly repair or replace the broken or defective intercom systemIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17002861
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color tne north wall in the 3rd room from eastIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17002588
- BMoldTrace and repair the source and abate the visible mold condition at east wall approx 8 sq ft in the 2nd room from northIssued Feb 2, 2024 · fix by Mar 8, 2024 overdue · Violation #16652248
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Jan 10, 2024 · fix by Jan 24, 2024 overdue · Violation #16580818
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from northIssued Nov 17, 2023 · fix by Dec 22, 2023 overdue · Violation #16382053
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 9, 2023 · fix by Dec 14, 2023 overdue · Violation #16366410
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Nov 9, 2023 · fix by Dec 14, 2023 overdue · Violation #16366414
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Nov 9, 2023 · fix by Dec 14, 2023 overdue · Violation #16366413
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures at sink in the kitchenIssued Oct 13, 2023 · fix by Nov 17, 2023 overdue · rent impairing · Violation #16301203
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from northIssued Oct 5, 2023 · fix by Nov 9, 2023 overdue · Violation #16282065
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 12, 2023 · fix by Oct 8, 2023 overdue · Violation #16219709
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 12, 2023 · fix by Oct 8, 2023 overdue · Violation #16219708
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at westIssued Aug 15, 2023 · fix by Sep 19, 2023 overdue · Violation #16163816
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the 1st room from north at westIssued Aug 15, 2023 · fix by Sep 19, 2023 overdue · Violation #16163817
- CMice or ratsAbate the infestation consisting of mice in the entranceIssued Jul 19, 2023 · fix by Aug 14, 2023 overdue · Violation #16105667
- BMoldTrace and repair the source and abate the visible mold condition aaproximately 2 sq.ft at ceiling in the bathroomIssued Jun 13, 2023 · fix by Jul 18, 2023 overdue · Violation #16044189
- BMoldTrace and repair the source and abate the visible mold condition at ceiling appr 4 sq ft in the 1st bathroom from northIssued Jun 6, 2023 · fix by Jul 11, 2023 overdue · Violation #16028738
- BMoldTrace and repair the source and abate the visible mold condition aproximately 2 sq.ft at ceiling in the 3rd bathroom from eastIssued May 23, 2023 · fix by Jun 27, 2023 overdue · Violation #16002899
- BMoldTrace and repair the source and abate the visible mold condition at ceiling 2 sq ft in the bathroomIssued Mar 7, 2023 · fix by Apr 11, 2023 overdue · Violation #15768859
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx 8 sq ft in the bathroomIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15760099
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 23, 2023 · fix by Feb 23, 2023 overdue · rent impairing · Violation #15734420
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Feb 23, 2023 · fix by Mar 1, 2023 overdue · Violation #15734421
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 6, 2023 · fix by Feb 12, 2023 overdue · Violation #15701207
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 6, 2023 · fix by Feb 4, 2023 overdue · rent impairing · Violation #15701206
- BMoldTrace and repair the source and abate the visible mold condition at north wall approx 5 sq ft and at ceiling 6 sq ft in the bathroomIssued Jan 25, 2023 · fix by Mar 1, 2023 overdue · Violation #15688786
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 19, 2023 · fix by Jan 25, 2023 overdue · Violation #15669733
- CBroken doors or locksProvide ready access to buildings heating system (door locked) at boiler roomIssued Jan 17, 2023 · fix by Jan 23, 2023 overdue · Violation #15664141
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from northIssued Dec 12, 2022 · fix by Dec 11, 2022 overdue · rent impairing · Violation #15603869
- CBroken doors or locksProvide ready access to buildings heating system boiler room door lock at boiler roomIssued Dec 12, 2022 · fix by Dec 18, 2022 overdue · Violation #15603870
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15484569
- BMissing smoke or CO detectorRepair or replace the smoke detector inoperative in the entire apartmentIssued Nov 2, 2022 · fix by Dec 7, 2022 overdue · Violation #15454459
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 2nd room from northIssued Nov 2, 2022 · fix by Dec 7, 2022 overdue · Violation #15454456
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.