Housing violations · University Heights (North)-Fordham
2695 Heath Avenue, Bronx
10463 · 25 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint12
- Other repairs7
- Mold4
- Roaches3
- Peeling paint and plaster2
- Plumbing, sinks and toilets1
- Mice or rats1
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 49 closed · NYC typical: 87 days
from 66 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- COther repairsProperly repair with similar material the broken or defective bricks and mortar joint at west and south wall at bulkhead wallIssued Jul 20, 2026 · fix by Jul 26, 2026 overdue · Violation #19082135
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Jul 20, 2026 · fix by Jul 26, 2026 overdue · Violation #19082130
- CPlumbing, sinks and toiletsReplace with new the missing ceramic tiles at all walls around bathtub in the bathroomIssued Jun 10, 2026 · fix by Jun 16, 2026 overdue · Violation #18996244
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the foyerIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18169495
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18169493
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 18, 2025 · fix by Sep 13, 2025 overdue · rent impairing · Violation #18153395
- BOther repairsProperly secure the loose light fixture at ceiling in the kitchenIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18153399
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2025 · fix by Sep 8, 2025 overdue · Violation #18153396
- BBroken doors or locksProperly repair or replace the broken or defective latch and it's assemblies at door in the entranceIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18153398
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 5, 2025 · fix by Sep 9, 2025 overdue · Violation #18133571
- BOther repairsProperly repair with similar material the broken or defective ceramic tiled floor in the kitchenIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #17430518
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Oct 21, 2024 · fix by Nov 14, 2024 overdue · Violation #17362197
- BMoldTrace and repair the source and abate the visible mold condition approximately 3 sq ft at south wall and east wall in the bathroomIssued Oct 27, 2023 · fix by Dec 1, 2023 overdue · Violation #16347610
- BMoldTrace and repair the source and abate the visible mold condition at ceiling aprox 5 sq ft in the bathroomIssued Oct 20, 2023 · fix by Nov 24, 2023 overdue · Violation #16327196
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 5, 2023 · fix by Jul 29, 2023 overdue · Violation #16080332
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 5, 2023 · fix by Jul 29, 2023 overdue · Violation #16080337
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 5, 2023 · fix by Jul 29, 2023 overdue · Violation #16080335
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 5, 2023 · fix by Jul 29, 2023 overdue · Violation #16085760
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 5, 2023 · fix by Jul 29, 2023 overdue · Violation #16080334
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 5, 2023 · fix by Jul 29, 2023 overdue · Violation #16080333
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 5, 2023 · fix by Jul 29, 2023 overdue · Violation #16080336
- BOther repairsReplace with new the missing escutcheon plate at riser in the bathroomIssued Jun 22, 2023 · fix by Jul 27, 2023 overdue · Violation #16056015
- BMoldTrace and repair the source and abate the visible mold condition (approx. 6 sq. ft) at west wall in the bathroomIssued Jun 22, 2023 · fix by Jul 27, 2023 overdue · Violation #16062011
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 24, 2022 · fix by Jun 19, 2022 overdue · Violation #15173470
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 16, 2021 · fix by Dec 10, 2021 overdue · Violation #14685504
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 16, 2021 · fix by Dec 10, 2021 overdue · Violation #14685501
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 16, 2021 · fix by Dec 10, 2021 overdue · Violation #14685499
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Jun 23, 2021 · fix by Jul 17, 2021 overdue · Violation #14400392
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2019 · fix by Nov 28, 2019 overdue · Violation #13410855
- CMoldTrace and repair the source and abate the visible mold condition at ceiling and walls approx 100 sq-ft in the bathroomIssued Jul 2, 2019 · fix by Jul 23, 2019 overdue · Violation #13148927
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.