Housing violations · Claremont Village-Claremont (East)
1240 Washington Avenue, Bronx
10456 · 100 apartments · 8 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
21 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster117
- Broken doors or locks82
- Other repairs77
- Roaches50
- Leaks and water damage45
- Mice or rats32
- Mold19
- Plumbing, sinks and toilets18
- Electrical problems13
- Missing smoke or CO detector13
- Lead paint4
- Missing window guards2
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 251 closed · NYC typical: 87 days
from 385 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19346680
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19346679
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346678
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall and east wall in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346677
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346674
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346676
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346675
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to apartment 1b north wall in the foyerIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327737
- BOther repairsProperly repair with similar material the broken or defective wood floor warped at west wall in the 1st room from northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327738
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327732
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at all switches and outlets in the 1st room from northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327742
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at all switches and outlet in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327741
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from building entrance door to apartment at south wall in the foyerIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327743
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19327744
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19327745
- BPlumbing, sinks and toiletsProvide sink and base cabinet in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327740
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19327735
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19327736
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322954
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323043
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19323067
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19322942
- BOther repairsProperly repair or replace the broken or defective base cabinet at west wall in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322982
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323042
- CLead paintReplace or repair the self-closing doors that is missing or defective door leading to stair case ''b'' at public hall, 3rd storyIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19323113
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor closet at public hall, 3rd storyIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19323094
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute at compactor closet, 3rd storyIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19323087
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute at compactor closet, 4th storyIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19323082
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to panel at south wall in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323074
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at lower refrigerator door in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323072
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at upper refrigerator door in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323071
- BOther repairsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bath tub in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323068
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at westIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322937
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322945
- BOther repairsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bath tub in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322947
- BOther repairsProperly repair or replace the broken or defective intercom from building entrance to panel at north wall in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322957
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322964
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322965
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322968
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322969
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling and east wall in the 5th room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322971
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east and south wall in the 5th room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322972
- BOther repairsProperly repair or replace the broken or defective countertop in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19322979
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch in the entranceIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19322994
- CBroken doors or locksRemove device preventing door from being self-closing door sweep in the entranceIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19323003
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323008
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north at eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323009
- BOther repairsProperly repair or replace the broken or defective base cabinet in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323010
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19323012
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19323013
- BElectrical problemsProperly repair or replace the broken or defective electrcial outlet at north wall in the 1st bathroom from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323031
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323033
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323035
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19298371
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19298372
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at hopper at compactor closet, 6th storyIssued Oct 15, 2026 · fix by Oct 29, 2026 overdue · Violation #19302343
- BBroken doors or locksRefit door at closet at north in the 3rd room from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302330
- BBroken doors or locksRefit door at 1st closet at north in the private hallwayIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302329
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd bathroom from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302326
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 2nd bathroom from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302325
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.