Housing violations · Riverdale-Spuyten Duyvil
4901 Henry Hudson Parkway West, Bronx
10471 · 133 apartments · 8 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster32
- Other repairs29
- Leaks and water damage16
- Broken doors or locks11
- Mold6
- Missing smoke or CO detector4
- Electrical problems2
- Plumbing, sinks and toilets2
- Lead paint1
- Mice or rats1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 6 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19264582
- CLead paintRemove the illegal fastening 2-motion electromagnetic lock at door (emergency exit) 2nd from north at west wall (leading to west yard from public hall way) at…Issued Oct 5, 2026 · fix by Oct 11, 2026 overdue · rent impairing · Violation #19264583
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at 2nd fire door from north at section j-n at public hall, 9th storyIssued Oct 1, 2026 · fix by Oct 15, 2026 overdue · Violation #19263861
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at north wall in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19236886
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 3rd room from north at westIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · rent impairing · Violation #19236884
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19126940
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19126939
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19126938
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 1st room from northIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19126944
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak south wall in the 1st room from northIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19126945
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 10, 2026 · fix by Aug 24, 2026 overdue · Violation #19126946
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak south wall in the 2nd room from northIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19126942
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from northIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19126941
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly exit b door at public hall stairs, 10th storyIssued Jun 29, 2026 · fix by Jul 5, 2026 overdue · Violation #19037652
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at exit door a at public hall stairs, 10th storyIssued Jun 29, 2026 · fix by Jul 5, 2026 overdue · Violation #19037650
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and east wall in the kitchenIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · rent impairing · Violation #19037646
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north at eastIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037645
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 2nd room from eastIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037644
- CBroken doors or locksProperly repair or replace the broken or defective latch and assembly at 1st fire door from east at south at stairwell ''a'' at public hall, 10th storyIssued May 13, 2026 · fix by May 19, 2026 overdue · Violation #18931317
- CBroken doors or locksProperly repair or replace the broken or defective latch and assembly at 1st fire door from north at east at stairwell ''b'' at public hall, 10th storyIssued May 13, 2026 · fix by May 19, 2026 overdue · Violation #18931319
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door at building vestibule , 1st storyIssued May 13, 2026 · fix by May 27, 2026 overdue · Violation #18931314
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at south wall in the foyerIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18179574
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the terraceIssued Apr 23, 2025 · fix by Apr 29, 2025 overdue · Violation #17840408
- BOther repairsProperly repair with similar material the broken or defective concrete at ceiling in the terraceIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17840407
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 22, 2025 · fix by Apr 28, 2025 overdue · Violation #17840395
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east, west and north wall in the 1st room from north at eastIssued Apr 22, 2025 · fix by May 27, 2025 overdue · Violation #17840403
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and east wall in the 1st room from north at westIssued Apr 22, 2025 · fix by May 27, 2025 overdue · Violation #17840411
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Apr 22, 2025 · fix by Apr 28, 2025 overdue · Violation #17840402
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 22, 2025 · fix by Apr 28, 2025 overdue · Violation #17840394
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Apr 22, 2025 · fix by May 6, 2025 overdue · Violation #17840412
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the foyerIssued Apr 22, 2025 · fix by May 27, 2025 overdue · Violation #17840399
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Apr 22, 2025 · fix by May 27, 2025 overdue · Violation #17840396
- BMoldTrace and repair the source and abate the visible mold condition approx 6 sq ft at ceiling in the bathroomIssued Dec 7, 2022 · fix by Jan 11, 2023 overdue · Violation #15606723
- BMoldTrace and repair the source and abate the visible mold condition approximately 4 sq ft at north wall in the 1st room from north at westIssued Dec 7, 2022 · fix by Jan 11, 2023 overdue · Violation #15606722
- BMoldTrace and repair the source and abate the visible mold condition ( approx. 6 sq ft) at ceiling in the private hallwayIssued Oct 4, 2022 · fix by Nov 8, 2022 overdue · Violation #15409683
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15301667
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15301664
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15301665
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15301668
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from north at westIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15301662
- BOther repairsProperly repair the broken or defective lower sash window counterbalance throughout in the entire apartmentIssued Jun 13, 2022 · fix by Jul 18, 2022 overdue · Violation #15187308
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Jun 6, 2022 · fix by Jul 2, 2022 overdue · Violation #15187307
- BMoldTrace and repair the source and abate the visible mold condition at west wall ( approx 8 sq.ft ) in the 1st room from east at southIssued Nov 29, 2019 · fix by Jan 3, 2020 overdue · Violation #13474953
- BOther repairsReplace with new the missing wall cabinets at west and east wall in the kitchenIssued Aug 5, 2019 · fix by Sep 9, 2019 overdue · Violation #13201673
- BOther repairsSection 27-2018 adm code abate the nuisance consisting of vermin , flies, in the entire apartmentIssued Apr 5, 2016 · fix by May 10, 2016 overdue · Violation #11182705
- COther repairsSection 27-2033 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to…Issued Apr 5, 2016 · fix by Apr 13, 2016 overdue · Violation #11182710
- BOther repairsSection 27-2018 adm code abate the nuisance consisting of vermin flies in the entire apartmentIssued Dec 21, 2015 · fix by Jan 25, 2016 overdue · Violation #11043637
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at basementIssued Nov 18, 2015 · fix by Dec 23, 2015 overdue · Violation #11004761
- BOther repairsSection 27-2018 adm code abate the nuisance consisting of vermin consisting of flies in the entire apartmentIssued Nov 18, 2015 · fix by Dec 23, 2015 overdue · Violation #11004762
- BOther repairsSection 27-2005 adm code replace with new the broken or defective glass window pane upper sash in the bathroomIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7375103
- BBroken doors or locksSection 27-2005 adm code properly repair with similar material the broken or defective wood closet doors in the 1st room from northIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7375100
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7375101
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7375102
- BBroken doors or locksSection 27-2005 adm code properly repair with similar material the broken or defective wood door in the bathroomIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7375104
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the 2nd room from north at eastIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7375106
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the 2nd room from north at westIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7375107
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective cement floor in the kitchenIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7376054
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective cement floor in the bathroomIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7376055
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective cement floor in the 2nd room from north at eastIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7376056
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective cement floor in the 2nd room from north at westIssued Jul 16, 2008 · fix by Aug 20, 2008 overdue · Violation #7376058
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.