Housing violations · Crotona Park East
1160 Hoe Avenue, Bronx
10459 · 10 apartments · 5 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster29
- Other repairs22
- Broken doors or locks12
- Roaches10
- Mice or rats9
- Leaks and water damage8
- Electrical problems7
- Missing smoke or CO detector6
- No heat or hot water5
- Lead paint4
- Mold3
- Plumbing, sinks and toilets3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 74 closed · NYC typical: 87 days
from 63 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartment incorrect locationIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19362802
- BOther repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartmentIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19324251
- BLead paintProperly repair with similar material the broken or defective 12th metal tread from bottom at stairs leading to north yardIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19324263
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the 3rd room from eastIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19151716
- BOther repairsProperly repair with similar material the broken or defective 6th marble tread up from bottom at public hall stairs at public hall, 1st storyIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19135011
- BOther repairs& 309 m/d law abate the nuisance consisting of free standing radiator and mirror at bulkhead landing at 1st public hall bulkhead from north, 5th storyIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19135027
- BOther repairsRemove all encumbrances consisting of household items obstructing egress at public hall, 1st storyIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · rent impairing · Violation #19135007
- BOther repairsProperly repair with similar material the broken or defective water proof material at floor in the bathroomIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19105279
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulk around bathtub in the bathroomIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19105277
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Jul 31, 2026 · fix by Aug 6, 2026 overdue · Violation #19105280
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at east wall in the kitchenIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19105281
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the bathroomIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19105278
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19105283
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19105282
- BLeaks and water damageRepair the roof so that it will not leak over ceiling, east and north walls at 1st public hall bulkhead from eastIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · rent impairing · Violation #19063035
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at fire door leading to west section of roof at 1st public hall bulkhead from eastIssued Jul 14, 2026 · fix by Jul 28, 2026 overdue · Violation #19063033
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at fire door leading to east section of roof at 1st public hall bulkhead from eastIssued Jul 14, 2026 · fix by Jul 28, 2026 overdue · Violation #19063032
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at east and south walls at 1st public hall bulkhead from eastIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19063037
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 5th storyIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19063039
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 5th storyIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · rent impairing · Violation #19063040
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19069924
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19063029
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070054
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 20, 2026 · fix by May 16, 2026 overdue · Violation #18799048
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at public hall, 1st storyIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18799098
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18798880
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18798877
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18798876
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 17, 2026 · fix by May 13, 2026 overdue · Violation #18798875
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770265
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770261
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770262
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective formica counter top at sink base cabinet in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770263
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770269
- BOther repairsProperly repair with similar material the broken or defective grout at ceramic tiles at north wall in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770268
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770273
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770272
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770271
- BOther repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartment heast sensor device installed incorrectlyIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770259
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 26, 2026 · fix by Apr 21, 2026 overdue · Violation #18740420
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 26, 2026 · fix by Apr 21, 2026 overdue · Violation #18740421
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18623925
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18623924
- BLead paintProperly repair with similar material the broken or defective 13 metal tread up from bottom at staircase that leads to north yardIssued Dec 3, 2025 · fix by Jan 7, 2026 overdue · Violation #18480730
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 25, 2025 · fix by Dec 21, 2025 overdue · Violation #18440081
- BPlumbing, sinks and toiletsProperly secure the loose washbasin in the bathroomIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18440086
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 3rd room from east at northIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18440083
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 3rd room from east at northIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18440084
- BOther repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartment heat sensor device installed incorrectlyIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18440079
- BBroken doors or locksProperly repair or replace the broken or defective latch and assmbly at building vestibule door (from vestibule to public hall) , 1st storyIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18358736
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18359404
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18359406
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18359408
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2025 · fix by Dec 6, 2025 overdue · Violation #18359412
- BMoldTrace and repair the source and abate the visible mold condition more than (10) sq ft at ceiling, east wall, south wall in the bathroomIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18359399
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2025 · fix by Nov 24, 2025 overdue · Violation #18332035
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 29, 2025 · fix by Oct 25, 2025 overdue · rent impairing · Violation #18332032
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 29, 2025 · fix by Nov 4, 2025 overdue · Violation #18332037
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2025 · fix by Nov 24, 2025 overdue · Violation #18332034
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18299788
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.