Housing violations · Allerton
2241 Holland Avenue, Bronx
10467 · 49 apartments · 6 stories · City Council district 13
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Roaches24
- Peeling paint and plaster19
- Mold18
- Lead paint17
- Missing smoke or CO detector13
- Other repairs12
- Leaks and water damage12
- Broken doors or locks11
- Mice or rats8
- Plumbing, sinks and toilets6
- Missing window guards5
- No heat or hot water2
- Electrical problems2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 35 closed · NYC typical: 87 days
from 98 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash 2nd window at east in the 3rd room from eastIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232264
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232262
- BLeaks and water damageRepair the leaky and/or defective faucets at basin sink in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232263
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232265
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 15, 2026 · fix by Oct 11, 2026 overdue · Violation #19218287
- BBroken doors or locksProperly repair or replace the broken or defective latch of the lock on the door in the building entrance , 1st storyIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18909862
- BBroken doors or locksProperly repair or replace the broken or defective latch at door at compactor closet, 5th storyIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18909860
- BMoldTrace and repair the source and abate the visible mold condition less than 30 square feet at west and south walls in the 2nd room from north at westIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18813401
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Apr 23, 2026 · fix by May 7, 2026 overdue · Violation #18813380
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Jan 23, 2026 · fix by Feb 27, 2026 overdue · Violation #18588550
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the 1st room from east at southIssued Jan 23, 2026 · fix by Feb 27, 2026 overdue · Violation #18588549
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Jan 23, 2026 · fix by Feb 27, 2026 overdue · Violation #18588551
- BMoldTrace and repair the source and abate the visible mold condition at ceiling east south and west walls under 10 sq ft in the bathroomIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18577013
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 9, 2025 · fix by Dec 9, 2025 overdue · rent impairing · Violation #18491383
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 9, 2025 · fix by Dec 9, 2025 overdue · rent impairing · Violation #18491384
- BOther repairsProperly repair with similar material the broken or defective cracked and erroded wood floor in the kitchenetteIssued Oct 17, 2025 · fix by Nov 21, 2025 overdue · Violation #18304082
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenetteIssued Oct 17, 2025 · fix by Nov 21, 2025 overdue · Violation #18304087
- BOther repairsProperly repair with similar material the broken or defective cracked marble saddle in the bathroomIssued Oct 17, 2025 · fix by Nov 21, 2025 overdue · Violation #18304086
- BOther repairsRefit lower window sash in the bathroomIssued Oct 17, 2025 · fix by Nov 21, 2025 overdue · Violation #18304083
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Oct 17, 2025 · fix by Nov 21, 2025 overdue · Violation #18304085
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Oct 17, 2025 · fix by Oct 31, 2025 overdue · Violation #18304088
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 17, 2025 · fix by Oct 23, 2025 overdue · Violation #18304089
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling and behind east wall in the bathroomIssued Oct 17, 2025 · fix by Nov 21, 2025 overdue · Violation #18304084
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at baseboard at north wall in the 2nd room from east at northIssued Oct 7, 2025 · fix by Nov 11, 2025 overdue · Violation #18285313
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 16, 2025 · fix by Oct 21, 2025 overdue · Violation #18236438
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 16, 2025 · fix by Oct 21, 2025 overdue · Violation #18236439
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelin enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 16, 2025 · fix by Oct 21, 2025 overdue · Violation #18236448
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17939227
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 9, 2025 · fix by Jul 5, 2025 overdue · Violation #17939230
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17939228
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jun 9, 2025 · fix by Jul 5, 2025 overdue · Violation #17939229
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2025 · fix by May 10, 2025 overdue · Violation #17825838
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Apr 9, 2025 · fix by May 14, 2025 overdue · Violation #17816537
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Apr 9, 2025 · fix by May 14, 2025 overdue · Violation #17816538
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 7, 2025 · fix by May 3, 2025 overdue · Violation #17809916
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17809912
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Apr 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17807513
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Apr 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17807514
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 28, 2025 · fix by Mar 26, 2025 overdue · Violation #17726439
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Feb 6, 2025 · fix by Mar 4, 2025 overdue · Violation #17672927
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 6, 2025 · fix by Mar 4, 2025 overdue · Violation #17672929
- BMoldTrace and repair the source and abate the visible mold condition ,less than 10 sqft. at ceiling in the bathroomIssued Dec 20, 2024 · fix by Jan 24, 2025 overdue · Violation #17576444
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 16, 2024 · fix by Jan 9, 2025 overdue · Violation #17562061
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 16, 2024 · fix by Jan 11, 2025 overdue · Violation #17551778
- BOther repairsProperly repair or replace the broken or defective sloping wood floor in the foyerIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17551776
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 16, 2024 · fix by Dec 30, 2024 overdue · Violation #17551777
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 22, 2024 · fix by Sep 5, 2024 overdue · Violation #17212975
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective porcelain enamel finish by method of regazing at bathtub in the bathroomIssued Aug 22, 2024 · fix by Sep 26, 2024 overdue · Violation #17212973
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Aug 22, 2024 · fix by Sep 26, 2024 overdue · Violation #17212970
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Aug 22, 2024 · fix by Sep 26, 2024 overdue · Violation #17212968
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 22, 2024 · fix by Sep 26, 2024 overdue · Violation #17212971
- BOther repairsRemove all encumbrances consisting of ac unit at fire escape window at east wall in the 1st room from northIssued Aug 22, 2024 · fix by Sep 26, 2024 overdue · rent impairing · Violation #17212972
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 20, 2024 · fix by Sep 15, 2024 overdue · Violation #17201157
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 20, 2024 · fix by Sep 15, 2024 overdue · Violation #17201158
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Jul 10, 2024 · fix by Aug 14, 2024 overdue · Violation #17112946
- CBroken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued Jul 10, 2024 · fix by Jul 16, 2024 overdue · Violation #17112936
- CRoachesAbate the infestation consisting of roachesIssued Jul 3, 2024 · fix by Jul 29, 2024 overdue · Violation #17096966
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective device in the entire apartmentIssued Jul 3, 2024 · fix by Aug 7, 2024 overdue · Violation #17096867
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at waste drain pipe at washbasing in the bathroomIssued Jul 3, 2024 · fix by Aug 7, 2024 overdue · rent impairing · Violation #17096869
- BMissing smoke or CO detectorRepair or replace the smoke detector defective device in the entire apartmentIssued Jul 3, 2024 · fix by Aug 7, 2024 overdue · Violation #17096868
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.