Housing violations · Longwood
951 Hoe Avenue, Bronx
10459 · 164 apartments · 8 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks29
- Other repairs27
- Roaches26
- Plumbing, sinks and toilets25
- Peeling paint and plaster23
- Mice or rats16
- Missing smoke or CO detector15
- Leaks and water damage14
- No heat or hot water12
- Mold10
- Missing window guards2
- Electrical problems1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 481 closed · NYC typical: 87 days
from 754 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq feet at ceiling in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19337673
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at building entrance doorIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19325816
- BBroken doors or locksProperly repair or replace the broken or defective latch assembly at building entrance doorIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325817
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at east wall in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19309795
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at ceiling in the 1st room from eastIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19309790
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19302953
- COther repairsRemove all obstructions from water closet in the bathroomIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · rent impairing · Violation #19308417
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296134
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19296136
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296151
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302967
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302942
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and all walls in the bathroomIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19308796
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet under sink in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302964
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302945
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19296137
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the foyerIssued Oct 15, 2026 · fix by Nov 19, 2026 · rent impairing · Violation #19296155
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296135
- CMoldTrace and repair the source and abate the visible mold condition less than 30 sq ft at ceiling and east wall in the bathroomIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19308773
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assembly at ''stair a'' door at public hall, 8th storyIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296184
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at ''stair a'' door at public hall, 8th storyIssued Oct 15, 2026 · fix by Oct 29, 2026 overdue · Violation #19296182
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296153
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19296157
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302966
- BOther repairsProperly repair or replace the broken or defective cabinet at east wall in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296167
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink basecabinet in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296164
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at westIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296177
- BMoldTrace and repair the source and abate the visible mold condition less tgan 10 sq ft at ceiling (inside closet) in the 3rd room from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19308772
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft but less then 30 sq.ft at ceiling in the bathroomIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19308794
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296158
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19302952
- BBroken doors or locksProperly repair or replace the broken or defective cracked glass at building entrance door at public hall, 1st storyIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19237945
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 1st room from east at southIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19237940
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east at southIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19237941
- BBroken doors or locksProperly repair or replace the broken or defective latch set and its assemblies at building entrance door 1st story public hall at public hall, 1st storyIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19237944
- BBroken doors or locksProperly repair or replace the broken or defective latch set and assemblies at hopper chute door at compactor closet, 3rd story, section at southIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19220847
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet, 8th story, section at northIssued Sep 17, 2026 · fix by Oct 1, 2026 overdue · Violation #19220803
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 8th storyIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19220831
- CLeaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 8th storyIssued Sep 17, 2026 · fix by Sep 23, 2026 overdue · rent impairing · Violation #19220826
- BElectrical problemsRemove all encumbrances consisting of electrical bicycle at public hall, 2nd story, section at northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · rent impairing · Violation #19227254
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage at floor at compactor closet, 2nd storyIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19220849
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211042
- BOther repairsProperly repair or replace the broken or defective rubber gasket at lower and upper fridge in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211030
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19211031
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees in the entire apartmentIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · Violation #19211032
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19211033
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19211034
- BOther repairsProperly repair with similar material the broken or defective the wood floor in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211035
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at sink in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211036
- BOther repairsProperly repair with similar material the broken or defective the wood floor in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211037
- BOther repairsProperly repair or replace the broken or defective rubber gasket at lower fridge in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211038
- BBroken doors or locksProperly repair or replace the broken or defective bell and return buzzer system from building front entrance door to the east wall in the foyerIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211039
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211040
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211041
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211043
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211044
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211045
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211046
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211047
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at northIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · Violation #19211048
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.