Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Norwood

3070 Hull Avenue, Bronx

10467 · 49 apartments · 6 stories · City Council district 11

By · Updated · Data from NYC HPD

C
8open immediately hazardous violations · 16 per 100 apartments
B52Hazardous, open
A12Non-hazardous, open
!69Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

1 open violation is marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company3070 Hull Avenue Owner LLC
Landlord (head officer or owner)Peter Hungerford

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Mold
    14
  2. Other repairs
    13
  3. Peeling paint and plaster
    12
  4. Missing smoke or CO detector
    8
  5. Leaks and water damage
    6
  6. Broken doors or locks
    6
  7. Plumbing, sinks and toilets
    5
  8. Roaches
    3
  9. Electrical problems
    2
  10. Mice or rats
    2
  11. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C141 days
from 61 closed · NYC typical: 84 days
B121 days
from 101 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at west wall in the 3rd room from east at southIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19295658
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at south wall in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19195507
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the 2nd room from north at westIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161361
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet behind refrigerator at west wall in the kitchenIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161362
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles lifting creating a trip hazard in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161356
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at sink wasteline in the kitchenIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161363
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161364
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161365
  • B
    Other repairsProperly repair or replace the broken or defective lower window sash spring balance in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161360
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161359
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 square feet at north wall in the 2nd room from east at northIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #18993358
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 12, 2026 · fix by Jun 26, 2026 overdue · Violation #18993355
  • B
    MoldTrace and repair the source and abate the visible mold condition less than ten square feet at north wall inside wall cabinet at north in the kitchenIssued May 21, 2026 · fix by Jun 25, 2026 overdue · Violation #18953591
  • B
    MoldTrace and repair the source and abate the visible mold condition less than ten square feet at north wall in the private hallwayIssued May 21, 2026 · fix by Jun 25, 2026 overdue · Violation #18953592
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet at south wall in the kitchenIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874869
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft on north east and south wall in the 1st bathroom from north at centerIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874884
  • B
    Broken doors or locksProperly repair or replace the broken or defective key operated lock at door in the entranceIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874883
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at east wall in the 2nd room from north at eastIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874881
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north at eastIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874879
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at north wall in the 1st room from north at westIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874874
  • B
    Other repairsRefit lower window sash in the 1st room from north at westIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874873
  • B
    Other repairsProperly repair or replace the broken or defective counter balance of lower sash at the window in the 1st room from north at westIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874872
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling of the closet at north in the kitchenIssued May 7, 2026 · fix by May 13, 2026 overdue · Violation #18874870
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at eastIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874868
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 1st room from north at eastIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874867
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at east wall in the 1st room from north at eastIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18874866
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18807746
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18807775
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18807747
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective base cabinet at sink in the kitchenIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18807756
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18807825
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at east wall at public hall, 1st storyIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18581891
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Jan 16, 2026 · fix by Feb 20, 2026 overdue · rent impairing · Violation #18574255
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jan 16, 2026 · fix by Feb 20, 2026 overdue · Violation #18574256
  • B
    Plumbing, sinks and toiletsProperly secure the loose sink basin in the bathroomIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18173753
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2025 · fix by Sep 16, 2025 overdue · Violation #18173759
  • B
    Other repairsProperly repair or replace the broken or defective intercom buzzerr system at east wall in the foyerIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18173756
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the 3rd room from northIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18173758
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18173754
  • B
    Broken doors or locksRefit door in entrance in the bathroomIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139257
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139260
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139259
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Apr 9, 2025 · fix by May 14, 2025 overdue · Violation #17813178
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, ceiling in the bathroomIssued Apr 9, 2025 · fix by May 14, 2025 overdue · Violation #17823560
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft on north and west walls in the bathroomIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17619525
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and west walls in the bathroomIssued Sep 13, 2024 · fix by Oct 18, 2024 overdue · Violation #17266321
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 13, 2024 · fix by Oct 9, 2024 overdue · Violation #17266324
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Sep 13, 2024 · fix by Oct 18, 2024 overdue · Violation #17266322
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 13, 2024 · fix by Oct 9, 2024 overdue · Violation #17266325
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, south and west in the bathroomIssued Sep 13, 2024 · fix by Oct 18, 2024 overdue · Violation #17266319
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Sep 13, 2024 · fix by Oct 18, 2024 overdue · Violation #17266323
  • B
    MoldTrace and repair the source and abate the visible mold condition at south wall in the 5th room from northIssued Aug 13, 2024 · fix by Sep 17, 2024 overdue · Violation #17195605
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Apr 15, 2024 · fix by May 20, 2024 overdue · Violation #16851541
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Apr 15, 2024 · fix by May 20, 2024 overdue · Violation #16851540
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2024 · fix by May 11, 2024 overdue · Violation #16851539
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at north east and south walls at shower stall in the bathroomIssued Mar 11, 2024 · fix by Apr 15, 2024 overdue · Violation #16691563
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 5 sqft at ceiling and 5 sqft at east wall in the closet in the private hallwayIssued Mar 11, 2024 · fix by Apr 15, 2024 overdue · Violation #16691568
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 1, 2023 · fix by Dec 27, 2023 overdue · Violation #16485634
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all ceilings and all walls in the entire apartmentIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16358464
  • B
    Other repairsProperly repair with similar material the broken or defective the marble floor saddle at entrance in the bathroomIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16358468

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

212018
232019
102020
262021
292022
462023
752024
682025
802026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 427 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.