Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Longwood

881 East 162 Street, Bronx

10459 · 86 apartments · 8 stories · City Council district 17

By · Updated · Data from NYC HPD

C
30open immediately hazardous violations · 35 per 100 apartments
B80Hazardous, open
A20Non-hazardous, open
!105Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyREV POLITE AVE ASSOC. LP
Landlord (head officer or owner)Peter Fine

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    28
  2. Other repairs
    21
  3. Roaches
    16
  4. Leaks and water damage
    16
  5. Broken doors or locks
    15
  6. Missing smoke or CO detector
    9
  7. Plumbing, sinks and toilets
    9
  8. Mice or rats
    7
  9. Mold
    5
  10. Electrical problems
    4

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C85 days
from 127 closed · NYC typical: 87 days
B121 days
from 190 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19366097
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective fire door (stair 'b') at public hall, 7th storyIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19363253
  • B
    Other repairsRemove all encumbrances consisting of house hold items (chair, dresser) nearIssued Nov 10, 2026 · fix by Dec 15, 2026 · rent impairing · Violation #19366060
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19366096
  • B
    Other repairsCleanse and disinfect to the satisfaction of this department after removing the unsanitary conitions at all stories at public hall stairsIssued Nov 10, 2026 · fix by Dec 15, 2026 · rent impairing · Violation #19363233
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 10, 2026 · fix by Nov 24, 2026 · Violation #19366098
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak active leak at ceiling in the kitchenIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19363188
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the foyerIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340552
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340553
  • C
    Other repairsProperly repair or replace the broken or defective shattered glass pane at 7th window from west at south exterior wall, building front, 1st storyIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19340561
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet at south wall in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340560
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19340559
  • B
    Other repairsProperly repair or replace the broken or defective mechanical air vent at east wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340558
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340557
  • B
    MoldTrace and repair the source and abate the visible mold condition observed greater than 10 sq ft at ceiling and south wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340556
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340555
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340554
  • B
    Electrical problemsReplace with new the missing electrical outlet safety covers at north wall at public hall, 1st storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320588
  • B
    Electrical problemsReplace with new the missing electrical outlet safety covers at north wall at public hall, 6th storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320587
  • B
    Broken doors or locksProperly repair or replace the broken or defective locking assembly at building entrance doorIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19319577
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective l;atch at building entrance doorIssued Oct 23, 2026 · fix by Nov 6, 2026 overdue · Violation #19319578
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259383
  • B
    Broken doors or locksProperly repair or replace the broken or defective cabinet door at west wall in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259386
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from eastIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259387
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19259377
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259378
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line at sink in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259382
  • B
    Other repairsProperly repair or replace the broken or defective baseboard at east wall in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259385
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259381
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259379
  • B
    Other repairsProperly repair or replace the broken or defective buzzer intercom system from building entrance to apartment 2b south wall in the entire apartmentIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19239951
  • C
    RoachesAbate the infestation consisting of roaches at compactor closet, 4th storyIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19238639
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19239950
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19239952
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216820
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216819
  • B
    Broken doors or locksProperly repair or replace the broken or defective broken door at entrance in the 1st room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216818
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 1st room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216816
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216817
  • B
    Broken doors or locksReplace with new the missing doors to upper wall cabinet at north wall in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216821
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19216822
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallwayIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206396
  • B
    Other repairsProperly repair or replace the broken or defective cabinets at south wall in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206398
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206399
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19206397
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206394
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206395
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft. at sink base cabinet in the kitchenIssued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19143991
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19142383
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tile at east wall in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19142384
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective formica countertop at sink in the kitchenIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19142387
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19142397
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19133353
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 29, 2026 · fix by Jul 25, 2026 overdue · Violation #19034676
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19034677
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 23, 2026 · fix by Jul 19, 2026 overdue · Violation #19023206
  • B
    Other repairsM/d law post a printed scale floor plan showing means of egress, at elevator at public hall, 2nd storyIssued Jun 23, 2026 · fix by Jul 28, 2026 overdue · Violation #19023217
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 23, 2026 · fix by Jul 28, 2026 overdue · Violation #19023214
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 23, 2026 · fix by Jul 19, 2026 overdue · Violation #19023207
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste drain pipe at sink in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020823

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

222017
382018
352019
172020
502021
992022
932023
1522024
1022025
1482026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 832 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.