Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Norwood

3315 Hull Avenue, Bronx

10467 · 49 apartments · 6 stories · City Council district 11

By · Updated · Data from NYC HPD

C
28open immediately hazardous violations · 57 per 100 apartments
B21Hazardous, open
A3Non-hazardous, open
!52Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyEmerald 3315 LLC
Landlord (head officer or owner)Luis Fermin

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    13
  2. Broken doors or locks
    11
  3. Mold
    8
  4. Other repairs
    8
  5. Missing smoke or CO detector
    4
  6. Roaches
    3
  7. Plumbing, sinks and toilets
    1
  8. Mice or rats
    1
  9. Missing window guards
    1
  10. Leaks and water damage
    1
  11. Peeling paint and plaster
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C91 days
from 91 closed · NYC typical: 87 days
B121 days
from 126 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet of mold at west wall at sink in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234963
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiled floor in the kitchenIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19163171
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19163170
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape window in the 3rd room from northIssued Aug 26, 2026 · fix by Sep 1, 2026 overdue · Violation #19163172
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19133903
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in drain line at bathtub in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19133901
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133905
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133908
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133914
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133915
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19133904
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door from street to vestibule , 1st storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19064834
  • B
    Broken doors or locksProperly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at north wall in the foyerIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18995600
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #18995603
  • B
    Other repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartmentIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18995604
  • B
    Other repairsProperly repair or replace the broken or defective buzzer and return voice system from building entrance up to panel at north wall in the entranceIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18943690
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door from street to vestibule , 1st storyIssued May 15, 2026 · fix by May 29, 2026 overdue · Violation #18928524
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and assembly's at fire door at public hall, 2nd storyIssued May 15, 2026 · fix by Jun 19, 2026 overdue · Violation #18928523
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and assembly's to door from street to vestibule , 1st storyIssued May 15, 2026 · fix by Jun 19, 2026 overdue · Violation #18928525
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Feb 12, 2026 · fix by Mar 8, 2026 overdue · Violation #18643906
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at east wall in the bathroomIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18292831
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 21, 2025 · fix by Sep 4, 2025 overdue · Violation #18179718
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th story, section ''north''Issued Aug 8, 2025 · fix by Aug 14, 2025 overdue · Violation #18141491
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door (street to vestibule) at public hall, 1st storyIssued Aug 8, 2025 · fix by Aug 22, 2025 overdue · Violation #18141495
  • B
    Other repairsRemove all encumbrances consisting of bicycles chained to west handrails at public hall, 4th story, section ''north''Issued Aug 8, 2025 · fix by Sep 12, 2025 overdue · rent impairing · Violation #18141492
  • B
    MoldTrace and repair the source and abate the visible mold condition at closet south wall (less than 10 sq.ft.) in the 3rd room from northIssued Jul 31, 2025 · fix by Sep 4, 2025 overdue · Violation #18134280
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wwall above & behind sink (less than 10 sq.ft.) in the kitchenIssued Jul 31, 2025 · fix by Sep 4, 2025 overdue · Violation #18134279
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jul 16, 2025 · fix by Aug 11, 2025 overdue · Violation #18099089
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at west wall in the bathroomIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18078435
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at ceiling and north wall in the bathroomIssued Jul 7, 2025 · fix by Aug 11, 2025 overdue · Violation #18065943
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile at public hall, 5th story, section at northIssued Jul 7, 2025 · fix by Aug 11, 2025 overdue · Violation #18065941
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door (from entrance to vestibule) , 1st storyIssued Jul 7, 2025 · fix by Jul 21, 2025 overdue · Violation #18065947
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective (defective spring loaded hinges) in the entranceIssued Apr 2, 2025 · fix by Apr 16, 2025 overdue · Violation #17797081
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17797084
  • C
    Broken doors or locksProperly repair or replace the broken or defective mortise lock and assembly at building entrance door , 1st storyIssued Mar 28, 2025 · fix by Apr 3, 2025 overdue · Violation #17793772
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Dec 9, 2024 · fix by Dec 15, 2024 overdue · rent impairing · Violation #17529204
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 16, 2024 · fix by Nov 9, 2024 overdue · Violation #17354663
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 16, 2024 · fix by Nov 9, 2024 overdue · Violation #17354661
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 16, 2024 · fix by Nov 9, 2024 overdue · Violation #17354662
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 16, 2024 · fix by Nov 9, 2024 overdue · Violation #17354660
  • C
    Lead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued Oct 8, 2024 · fix by Nov 1, 2024 overdue · Violation #17332705
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 7, 2024 · fix by Oct 31, 2024 overdue · Violation #17332554
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 7, 2024 · fix by Oct 31, 2024 overdue · Violation #17332553
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 7, 2024 · fix by Oct 31, 2024 overdue · Violation #17332552
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 7, 2024 · fix by Oct 31, 2024 overdue · Violation #17332551
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 7, 2024 · fix by Oct 31, 2024 overdue · Violation #17332550
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 10 sq.ft. at west and south walls in the 1st room from north at westIssued Sep 22, 2023 · fix by Oct 27, 2023 overdue · Violation #16243405
  • C
    MoldTrace and repair the source and abate the visible mold condition approximately 30 sq ft at 1st closet from east at south wall wall in the foyerIssued Sep 26, 2022 · fix by Oct 22, 2022 overdue · Violation #15396696
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 27, 2020 · fix by Dec 21, 2020 overdue · Violation #13913757

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

102017
382018
232019
602020
132021
482022
322023
1352024
952025
462026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 763 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.