Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Norwood

3339 Hull Avenue, Bronx

10467 · 49 apartments · 6 stories · City Council district 11

By · Updated · Data from NYC HPD

C
16open immediately hazardous violations · 33 per 100 apartments
B21Hazardous, open
A3Non-hazardous, open
!37Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning company3339 Hull Avenue Owner LLC
Landlord (head officer or owner)Peter Hungerford

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    11
  2. Lead paint
    8
  3. Peeling paint and plaster
    6
  4. Leaks and water damage
    4
  5. Broken doors or locks
    4
  6. Missing smoke or CO detector
    2
  7. Mold
    2
  8. Roaches
    1
  9. Plumbing, sinks and toilets
    1
  10. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C101 days
from 19 closed · NYC typical: 87 days
B124 days
from 56 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsProperly repair or replace the broken or defective from intercom pannel at building entrance to intercom pannel at north wall in the private hallwayIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285419
  • B
    Other repairsProperly repair with similar material the broken or defective marble saddle at floor in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285418
  • B
    Other repairsProperly repair or replace the broken or defective upper window sash counter balance second window from north at east in the 2nd room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285420
  • B
    Other repairsProperly repair or replace the broken or defective upper wood cabinet at east in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223078
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from eastIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223077
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223074
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223075
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19223080
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 18, 2026 · fix by Oct 2, 2026 overdue · Violation #19223084
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223083
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection , wasteline at washbasin in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223076
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south and west walls in the bathroomIssued Sep 18, 2026 · fix by Sep 24, 2026 overdue · Violation #19223073
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223082
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223079
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19223081
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch and assembly at compactor closet door at public hall, 3rd storyIssued Aug 10, 2026 · fix by Aug 16, 2026 overdue · Violation #19133962
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at west and north walls and ceiling in the 1st room from eastIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19001851
  • B
    Other repairsReplace with new the missing escutcheon at steam riser at ceiling in the bathroomIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19001848
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute , 3rd storyIssued May 22, 2026 · fix by Jun 5, 2026 overdue · Violation #18953664
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch at compactor closet door at public hall, 3rd storyIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814222
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814219
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814218
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098450
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18086137
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 12, 2024 · fix by Nov 18, 2024 overdue · Violation #17410103
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17410102
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17410104
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 29, 2023 · fix by Dec 23, 2023 overdue · Violation #16469600
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 28, 2023 · fix by Dec 22, 2023 overdue · Violation #16469126
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Nov 28, 2023 · fix by Dec 22, 2023 overdue · Violation #16469124
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 28, 2023 · fix by Dec 22, 2023 overdue · Violation #16469125
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 6, 2022 · fix by Sep 30, 2022 overdue · Violation #15352726
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Sep 6, 2022 · fix by Sep 30, 2022 overdue · Violation #15353082
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 6, 2022 · fix by Sep 30, 2022 overdue · Violation #15352727
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 6, 2022 · fix by Sep 30, 2022 overdue · Violation #15352728
  • C
    MoldTrace and repair the source and abate the visible mold condition at east wall around windows approx 25 sq ft in the 1st room from eastIssued May 26, 2021 · fix by Jun 21, 2021 overdue · Violation #14358018
  • B
    Other repairsProperly repair the broken or defective mechanical stopper at tub in the bathroomIssued Mar 19, 2021 · fix by Apr 23, 2021 overdue · Violation #14077005

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

222017
452018
332019
212020
372021
292022
182023
412024
142025
592026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 400 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.