Housing violations · Harlem (North)
2785 Frederick Douglass Boulevard, Manhattan
10039 · 23 apartments · 7 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs20
- Peeling paint and plaster12
- Broken doors or locks7
- Leaks and water damage6
- Mold4
- Roaches2
- Missing smoke or CO detector2
- Plumbing, sinks and toilets2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 6 closed · NYC typical: 87 days
from 7 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsReplace with new the missing metal baseboard radiator cover at east wall in the 1st room from east at southIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070356
- BOther repairsReplace with new the missing metal baseboard cover at east wall in the 1st room from east at southIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070340
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hallway , 3rd storyIssued Jul 10, 2026 · fix by Aug 5, 2026 overdue · Violation #19070366
- CBroken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued May 19, 2026 · fix by May 25, 2026 overdue · Violation #18940099
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intrecom system from the building entrance door to south wall panel in the private hallwayIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18940100
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at north wall in the 3rd room from eastIssued Feb 6, 2025 · fix by Mar 13, 2025 overdue · Violation #17683483
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17329384
- BBroken doors or locksRefit the door at entrance in the 3rd room from eastIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17329385
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 3rd room from eastIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17329386
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from building entrance door to north wall panel in the foyerIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17329388
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at ceiling in the kitchenIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17329389
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 18, 2024 · fix by Jul 14, 2024 overdue · Violation #17061981
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroomIssued Feb 27, 2024 · fix by Apr 2, 2024 overdue · Violation #16696554
- BOther repairsProperly repair or replace the broken or defective intercom system at north wall in the foyerIssued Feb 26, 2024 · fix by Apr 1, 2024 overdue · Violation #16696553
- BOther repairsProperly repair or replace the broken or defective bell and return buzzer system from building entrance to apartmentIssued Jul 7, 2023 · fix by Aug 11, 2023 overdue · Violation #16080620
- BOther repairsProperly repair or replace the broken or defective light switch at north wall in the bathroomIssued Apr 18, 2023 · fix by May 23, 2023 overdue · Violation #15925583
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 18, 2023 · fix by May 23, 2023 overdue · Violation #15925580
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Apr 18, 2023 · fix by May 23, 2023 overdue · Violation #15925579
- CRoachesAbate the infestation consisting of roachesIssued Apr 18, 2023 · fix by May 14, 2023 overdue · Violation #15925578
- BOther repairsProperly repair or replace the broken or defective intercom system from vestibule to apartmentIssued Apr 18, 2023 · fix by May 23, 2023 overdue · Violation #15925577
- BOther repairsProperly repair with similar material the broken or defective uneven wood floor in the private hallwayIssued Apr 10, 2023 · fix by May 15, 2023 overdue · Violation #15777341
- BOther repairsProperly repair with similar material the broken or defective uneven wood floor in the private hallwayIssued Apr 10, 2023 · fix by May 15, 2023 overdue · Violation #15777339
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the 3rd room from eastIssued Apr 10, 2023 · fix by May 15, 2023 overdue · Violation #15777340
- BOther repairsProperly repair the broken or defective bell and buzzer intercom system from building entrance to apartmentIssued Mar 20, 2023 · fix by Apr 24, 2023 overdue · Violation #15777343
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallwayIssued Mar 20, 2023 · fix by Apr 24, 2023 overdue · Violation #15777345
- BMoldTrace and repair the source and abate the visible mold condition around the bathtub approx 1 sq ft in the bathroomIssued Mar 14, 2023 · fix by Apr 18, 2023 overdue · Violation #15778955
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Nov 14, 2022 · fix by Dec 19, 2022 overdue · Violation #15489143
- BBroken doors or locksProperly repair the broken or defective mortise lock at door, in the entranceIssued Oct 27, 2022 · fix by Dec 1, 2022 overdue · Violation #15450272
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Oct 27, 2022 · fix by Dec 1, 2022 overdue · Violation #15450267
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued Oct 27, 2022 · fix by Dec 1, 2022 overdue · Violation #15450241
- BMoldTrace and repair the source and abate the visible mold condition approx 2 sq feet at north wall in the bathroomIssued Sep 6, 2022 · fix by Oct 11, 2022 overdue · Violation #15353073
- BMoldTrace and repair the source and abate the visible mold condition aprox 4 sq ft at ceiling in the 1st room from north at eastIssued Oct 5, 2021 · fix by Nov 9, 2021 overdue · Violation #14608523
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and north wall in the 4th room from eastIssued Sep 20, 2021 · fix by Oct 25, 2021 overdue · rent impairing · Violation #14565970
- COther repairsProperly repair with similar material the broken or defective wood floor tiles in the 1st room from northIssued Jul 29, 2021 · fix by Aug 4, 2021 overdue · Violation #14443613
- COther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jul 29, 2021 · fix by Aug 4, 2021 overdue · Violation #14443614
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Jul 29, 2021 · fix by Sep 2, 2021 overdue · Violation #14443615
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from northIssued Jun 22, 2021 · fix by Jul 27, 2021 overdue · Violation #14381102
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at eastIssued Jun 7, 2021 · fix by Jul 12, 2021 overdue · Violation #14338830
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from north at eastIssued Jun 7, 2021 · fix by Jul 12, 2021 overdue · Violation #14338834
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 2nd room from north at eastIssued Jun 7, 2021 · fix by Jul 12, 2021 overdue · Violation #14338831
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 1st room from north at eastIssued Jun 7, 2021 · fix by Jul 12, 2021 overdue · Violation #14338832
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling in the 4th room from eastIssued Jul 29, 2019 · fix by Sep 2, 2019 overdue · rent impairing · Violation #13196559
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.