Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mount Eden-Claremont (West)

1450 Clay Avenue, Bronx

10456 · 98 apartments · 6 stories · City Council district 16

By · Updated · Data from NYC HPD

C
67open immediately hazardous violations · 68 per 100 apartments
B143Hazardous, open
A32Non-hazardous, open
!227Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

16 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyClaremont Park LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    47
  2. Other repairs
    46
  3. Broken doors or locks
    41
  4. Leaks and water damage
    22
  5. Missing smoke or CO detector
    17
  6. Roaches
    16
  7. Mice or rats
    14
  8. Mold
    13
  9. Plumbing, sinks and toilets
    12
  10. No heat or hot water
    11
  11. Electrical problems
    3

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C87 days
from 81 closed · NYC typical: 87 days
B145 days
from 116 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352204
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assembly at building front entrance door , 1st storyIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19352206
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19352200
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352203
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set and assemblies at vestibule door ( from vestibule to public hall) at public…Issued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19347077
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 3, 2026 overdue · rent impairing · Violation #19347075
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at south wall in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347074
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic wall tile at south wall at bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347073
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 3, 2026 overdue · rent impairing · Violation #19347071
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and assemblies at vestibule door ( from vestibule to public hall) at public hall, 1st storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347078
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19347072
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19347076
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19348308
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19348307
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assembly at building vestibule door , 1st storyIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19326222
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19326220
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326219
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326217
  • B
    Other repairsProperly repair or replace the broken or defective mechanical ventilation system at east wall in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263552
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of cracked vinyl tile at floor in the 3rd room from northIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19263548
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263553
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of cracked vinyl tile at floor in the private hallwayIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19263555
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263551
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19263549
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19263554
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of defective vinyl floor tile in the 3rd room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19251806
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of defective vinyl floor tile in the private hallwayIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19251808
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall ceiling less than 10 sq ft in the bathroomIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19261328
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19251810
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at east wall in the bathroomIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19251809
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet at south wall and north wall in the kitchenIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19251807
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door at building vestibule door at public hall, 1st storyIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19193132
  • B
    MoldTrace and repair the source and abate the visible mold condition at baseboard at all walls in the closet less than 10 sq. ft in the 2nd room from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180824
  • B
    Other repairsProperly repair or replace the broken or defective vetilation system at east wall in the bathroomIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18967568
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at east wall in the kitchenIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18967567
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at east wall in the bathroomIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18967566
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at east wall in the kitchenIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18967565
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft at south wall in the 1st bathroom from northIssued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18914051
  • B
    Other repairsProperly repair with similar material the broken or defective warped wood floor in the 2nd room from northIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18825856
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft. at the south wall in the 1st bathroom from northIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18828732
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · rent impairing · Violation #18817170
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at east wall in the kitchenIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18817171
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 27, 2026 · fix by Apr 27, 2026 overdue · rent impairing · Violation #18817172
  • B
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18758773
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet west wall in the kitchenIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18758775
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 6, 2026 · fix by Apr 5, 2026 overdue · rent impairing · Violation #18762162
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler room, 1st storyIssued Apr 6, 2026 · fix by Apr 12, 2026 overdue · Violation #18762165
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18758776
  • B
    Other repairsProperly repair with similar material the broken or defective warped, deteriorated, holes at wood flooring in the 3rd room from northIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18737514
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 27, 2026 · fix by Mar 26, 2026 overdue · rent impairing · Violation #18737513
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color cracked, peeling at ceiling in the kitchenIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18737496
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft. at all walls inside west wall closet in the 2nd room from northIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18737497
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18737498
  • B
    Other repairsProperly repair with similar material the broken or defective warped wood flooring in the 2nd room from northIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18737500
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18737502
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color holes, peeling paint at ceiling, west and east wall in the bathroomIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18737503
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color chipped paint and plaster at west and east walls in the private hallwayIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18737504
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18737506
  • B
    Broken doors or locksRefit upper cabinet doors at east wall in the kitchenIssued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18706661
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 17, 2026 · fix by Mar 14, 2026 overdue · rent impairing · Violation #18722720

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

202017
142018
362019
182020
252021
62022
662023
992024
1942025
1182026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 669 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.