Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Melrose

675 Morris Avenue, Bronx

10451 · 137 apartments · 8 stories · City Council district 17

By · Updated · Data from NYC HPD

C
18open immediately hazardous violations · 13 per 100 apartments
B30Hazardous, open
A15Non-hazardous, open
!36Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyMORRIS AVENUE CORNERSTONE LP
Landlord (head officer or owner)Peter Fine

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    11
  2. Mold
    10
  3. Plumbing, sinks and toilets
    8
  4. Broken doors or locks
    8
  5. Roaches
    8
  6. Leaks and water damage
    4
  7. Peeling paint and plaster
    4
  8. Mice or rats
    4
  9. Missing smoke or CO detector
    4
  10. No heat or hot water
    1
  11. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C87 days
from 172 closed · NYC typical: 87 days
B119 days
from 282 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood counter top at sink in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19349381
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamal finish by method of reglazing at bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19349380
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door and frame at street entrance door to buildingIssued Nov 2, 2026 · fix by Nov 16, 2026 · Violation #19336121
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathub in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332187
  • B
    Leaks and water damageRepair the leaky and/or defective water supply pipe at sink in the kitchenIssued Oct 28, 2026 · fix by Dec 2, 2026 · rent impairing · Violation #19332185
  • C
    Mice or ratsAbate the infestation consisting of mice in the kitchenIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19336652
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332182
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332183
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332184
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332186
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19312054
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 20, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19312059
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19312060
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at wasteline under sink in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19312057
  • B
    Other repairsReplace with new the missing light switch cover at south wall in the 1st room from eastIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19312053
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective rotted base cabinet at sink in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19312058
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261431
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the bathroomIssued Sep 30, 2026 · fix by Oct 26, 2026 overdue · Violation #19267035
  • B
    MoldTrace and repair the source and abate the visible mold condition observed 14sq ft of mold at north wall in the 1st room from north at westIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261423
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and north wall in the 1st room from north at westIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261424
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from north at westIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261427
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261434
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 10, 2026 · fix by Oct 6, 2026 overdue · Violation #19202600
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19172298
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective bottom sink cabinet in the kitchenIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19172312
  • B
    Broken doors or locksProperly repair or replace the broken or defective metal fire door in the entranceIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19172322
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19172297
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19118496
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19118489
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at ceiling and all walls in the bathroomIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19118485
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19118495
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19118490
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 27, 2026 · fix by Aug 22, 2026 overdue · Violation #19093329
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective procelain enamel by method of reglazing at bathtub in the bathroomIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19090402
  • B
    Broken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to panel at south wall in the entire apartmentIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19090408
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 23, 2026 · fix by Aug 18, 2026 overdue · Violation #19090414
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinge at compactor closet, 8th storyIssued Jul 22, 2026 · fix by Aug 17, 2026 overdue · Violation #19090167
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 30, 2026 · fix by Jul 26, 2026 overdue · Violation #19040121
  • B
    Electrical problemsReplace with new the missing electrical outlet at east wall in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19040122
  • B
    Other repairsReplace with new the missing light switches at east and west walls in the private hallwayIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19040129
  • B
    Other repairsProperly repair or replace the broken or defective base cabinets at east and west walls. in the kitchenIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19040131
  • B
    Other repairsReplace with new the missing light switch at west wall in the foyerIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19040132
  • B
    Broken doors or locksProperly repair or replace the broken or defective door knob in the entranceIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18755086
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock and assembly in the entranceIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18560669
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective stopper at bathtub in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18560670
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2025 · fix by Dec 6, 2025 overdue · Violation #18353524
  • B
    Other repairsProperly repair or replace the broken or defective intercom system panel at north wall in the foyerIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18246895
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18173037

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

352017
392018
642019
352020
652021
232022
292023
1552024
1782025
2152026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 944 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.