Housing violations · Highbridge
1115 Jerome Avenue, Bronx
10452 · 79 apartments · 6 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster25
- Other repairs24
- Lead paint24
- Leaks and water damage11
- Broken doors or locks10
- Mice or rats7
- Plumbing, sinks and toilets7
- Roaches5
- Missing smoke or CO detector4
- Mold3
- Electrical problems3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 76 closed · NYC typical: 87 days
from 126 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19373920
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 16, 2026 · Violation #19373921
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.,ft., on the south wall and under sink base cabinet in the kitchenIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19281691
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from northIssued Sep 17, 2026 · fix by Sep 23, 2026 overdue · Violation #19219891
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Sep 17, 2026 · fix by Sep 23, 2026 overdue · Violation #19219889
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 17, 2026 · fix by Oct 13, 2026 overdue · Violation #19219885
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 5th room from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19219892
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19219890
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective basin sink cabinet in the kitchenIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19219888
- BBroken doors or locksProperly repair or replace the broken or defective refrigerator door upper and lower gasket seal in the kitchenIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19219886
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at refrigerator door in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19121190
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective lower sink base cabinet (rotten) in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19113648
- BPlumbing, sinks and toiletsReplace the broken or defective wash basin in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · rent impairing · Violation #19078114
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19078119
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078115
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078116
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078117
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078118
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19078120
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective pocelain enamel finish by method of reglazing at bathtub in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078113
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from building entrance door to the apartment wall panel at south wall in the…Issued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19035690
- BOther repairsProperly repair or replace the broken or defective handle at radiator shut off valve in the 3rd room from eastIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19035691
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984725
- BOther repairsProperly repair or replace the broken or defective buzz system from building entrance to north wall , 5th storyIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984721
- BOther repairsProperly repair or replace the broken or defective upper cabinet at south wall in the kitchenIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984722
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the kitchenIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984723
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984726
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from eastIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984727
- BOther repairsProperly repair or replace the broken or defective lower and upper seal at refrigator in the kitchenIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984731
- BOther repairsProperly repair or replace the broken or defective buzz system from building entrance to north wall in the private hallwayIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984732
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west and north wall at public hall, 1st storyIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18826904
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash, 1st from north at east wall in the 3rd room from northIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818916
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from northIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818918
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818914
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 2nd egressIssued Dec 22, 2025 · fix by Jan 5, 2026 overdue · Violation #18528140
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812413
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812412
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at sink counter top in the kitchenIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812411
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west wall and north wall in the 1st room from northIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812409
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812408
- BBroken doors or locksProperly repair with similar material the broken or defective rubber seal at oven door in the kitchenIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812407
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at refrigerator door in the kitchenIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812406
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812395
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Mar 26, 2025 · fix by Apr 21, 2025 overdue · rent impairing · Violation #17792244
- CRoachesAbate the infestation consisting of roaches at public hall, 2nd story, section at southIssued Mar 26, 2025 · fix by Apr 21, 2025 overdue · Violation #17792245
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Mar 26, 2025 · fix by Apr 21, 2025 overdue · rent impairing · Violation #17792243
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from east at southIssued Dec 9, 2024 · fix by Jan 13, 2025 overdue · Violation #17531504
- BBroken doors or locksProperly repair or replace the broken or defective latch set at door in the entranceIssued Dec 9, 2024 · fix by Jan 13, 2025 overdue · Violation #17531500
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from eastIssued Oct 11, 2024 · fix by Nov 15, 2024 overdue · Violation #17336324
- COther repairsProperly repair with similar material the broken or defective vinyl tyled ceramic tile floor at 1st public hall from east at south, 1st storyIssued Oct 4, 2024 · fix by Oct 10, 2024 overdue · Violation #17319674
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Aug 19, 2024 · fix by Sep 12, 2024 overdue · Violation #17204391
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 16, 2024 · fix by Sep 9, 2024 overdue · Violation #17203829
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 16, 2024 · fix by Sep 9, 2024 overdue · Violation #17203828
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 16, 2024 · fix by Sep 9, 2024 overdue · Violation #17203830
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at wash basin at the south wall in the bathroomIssued Aug 16, 2024 · fix by Sep 20, 2024 overdue · Violation #17192303
- BOther repairsProperly repair with similar material the broken or defective west and north wall with fire retardent material at public hall, 1st storyIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187253
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of slidable bolt with an eye capable of being padlock at door in the entranceIssued Aug 12, 2024 · fix by Aug 18, 2024 overdue · Violation #17178743
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Aug 12, 2024 · fix by Sep 16, 2024 overdue · Violation #17178742
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at west and north wall south section at public hall stairs, 1st storyIssued Aug 6, 2024 · fix by Sep 10, 2024 overdue · Violation #17167879
- COther repairsProperly repair with similar material the broken or defective marble tread with riser 2nd and 3rd from bottom at public hall stairs, 1st storyIssued Aug 6, 2024 · fix by Aug 12, 2024 overdue · Violation #17167892
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.