Housing violations · Mount Hope
1966 Jerome Avenue, Bronx
10453 · 12 apartments · 5 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
What the city has done here
When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.
Latest Housing Court cases
- §Tenants sued for repairsOpened Apr 3, 2015 · Closed · Details
Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster9
- Other repairs7
- Leaks and water damage4
- Missing smoke or CO detector2
- Plumbing, sinks and toilets1
- Broken doors or locks1
- Mold1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 3 closed · NYC typical: 84 days
from 4 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194947
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194918
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194883
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194882
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194967
- BOther repairsProperly repair with similar material the broken or defective the ceramic tiles all walls in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194964
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of re-glazing at bathtub in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194957
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194939
- BOther repairsProperly repair or replace the broken or defective lower sash counter balance to window at north in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194921
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194969
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from east at northIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194980
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194941
- BOther repairsProperly repair or replace the broken or defective lower sash counter balance at window in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194951
- BOther repairsProperly repair or replace the broken or defective lower sash counter balance to window at west in the 2nd room from north at westIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194983
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 2nd room from north at westIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194982
- BOther repairsProperly repair or replace the broken or defective lower sash balance to window at north in the 2nd room from east at northIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19194981
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at north wall and at ceiling in the bathroomIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18556667
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 6, 2026 · fix by Feb 1, 2026 overdue · Violation #18556671
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroomIssued Feb 16, 2022 · fix by Mar 23, 2022 overdue · Violation #5649446
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall, in the 5th room from north at westIssued Feb 16, 2022 · fix by Mar 23, 2022 overdue · Violation #5649450
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls, in the private hallwayIssued Feb 16, 2022 · fix by Mar 23, 2022 overdue · Violation #5649448
- COther repairsProperly repair with similar material the broken or defective rotted wood floor in the kitchenIssued Feb 16, 2022 · fix by Feb 22, 2022 overdue · Violation #12848874
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 24, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.