Housing violations · Longwood
957 Kelly Street, Bronx
10459 · 41 apartments · 5 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
29 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs96
- Peeling paint and plaster73
- Roaches50
- Broken doors or locks46
- Mice or rats41
- Plumbing, sinks and toilets28
- Missing smoke or CO detector24
- Leaks and water damage22
- Lead paint20
- Mold15
- Electrical problems8
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 297 closed · NYC typical: 87 days
from 400 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364265
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock and assembly at door in the entranceIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19370535
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364271
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364269
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364268
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tile in the kitchenIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364267
- BOther repairs& 309 m/d law abate the nuisance consisting of storage at sofit , 1st storyIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364326
- BOther repairsProperly repair with similar material the broken or defective lower window sash pane at intermediate landing , 1st storyIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364324
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge at building entrance , 1st storyIssued Nov 10, 2026 · fix by Nov 24, 2026 · Violation #19364323
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19364286
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364262
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364263
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at east wall in the 1st room from eastIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19370532
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at sink in the kitchenIssued Nov 10, 2026 · fix by Dec 15, 2026 · rent impairing · Violation #19370529
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19364348
- COther repairsProperly repair or replace the broken or defective spring balance at lower window sash in the 1st room from eastIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19364343
- BOther repairsProperly repair with similar material the broken or defective glass pane at upper window sash in the 1st room from eastIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364341
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the kitchenIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364289
- BBroken doors or locksProvide vestibule door , 1st storyIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364325
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock and assembly at door in the entranceIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364288
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Nov 10, 2026 · fix by Dec 6, 2026 · rent impairing · Violation #19364287
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352256
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from north at westIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352261
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352257
- COther repairsProperly repair or replace the broken or defective lower sash spring balance at window ( fire escape) in the 1st room from north at westIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19352260
- BBroken doors or locksProvide glass in lieu of plexiglass installed on building entrance door , 1st storyIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340669
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door , 1st storyIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19340668
- BBroken doors or locksProvide approved glass in the place of building entrance door , 1st storyIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333565
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling (approximately 10sq. feet) in the bathroomIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19333558
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19333561
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19333560
- CBroken doors or locksProperly repair or replace the broken or defective lock set and assemblies at building entrance door , 1st storyIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19333563
- BElectrical problemsProperly repair or replace the broken or defective lighting fixtures at ceiling in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333559
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19333562
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door , 1st storyIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19333564
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door from vestibule to 1st story at public hall, 1st storyIssued Oct 16, 2026 · fix by Oct 30, 2026 overdue · Violation #19308673
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assemblies at door from vestibule to 1st story at public hall, 1st storyIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19308684
- CRoachesAbate the infestation consisting of roachesIssued Oct 14, 2026 · fix by Nov 9, 2026 overdue · Violation #19301679
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 4th room from eastIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301670
- BBroken doors or locksProperly repair or replace the broken or defective wood door , in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301667
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301668
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of refrigerator with doors intact at public hall, 5th storyIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19296243
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 6, 2026 · fix by Nov 1, 2026 overdue · Violation #19272986
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 6, 2026 · fix by Nov 1, 2026 overdue · Violation #19272985
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254849
- BOther repairsProperly repair with similar material the broken or defective vinyl floors in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254842
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254840
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19254838
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19267331
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19267127
- BOther repairsProperly repair with similar material the broken or defective wood floors in the 3rd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19267126
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 5, 2026 · fix by Oct 31, 2026 overdue · rent impairing · Violation #19254858
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254856
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254855
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19271401
- BOther repairsProperly repair or replace the broken or defective intercommunication system from building front to north wall panel in the foyerIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254854
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south,north, east and west walls in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254851
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254844
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254847
- BOther repairsProperly repair or replace the broken or defective ceiling light fixture in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19254846
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.