Housing violations · Kingsbridge-Marble Hill
3140 Kingsbridge Avenue, Bronx
10463 · 70 apartments · 6 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs24
- Lead paint23
- Broken doors or locks16
- Peeling paint and plaster14
- Mice or rats8
- Plumbing, sinks and toilets5
- Roaches5
- Missing smoke or CO detector4
- No heat or hot water3
- Leaks and water damage1
- Mold1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 65 closed · NYC typical: 87 days
from 86 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19364721
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at wash basin in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364718
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364719
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19364720
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story, section ''3140''Issued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19311398
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assemblies at building entrance door , 1st story, section ''3140''Issued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311399
- BOther repairsProperly repair with similar material the broken or defective cracked ceramic tiles at floor in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284566
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284559
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19284560
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees in the bathroomIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19284565
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective at base cabinet at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284564
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19284563
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284562
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284561
- CBroken doors or locksProperly repair or replace the broken or defective latch and assemblys at 2nd story public hall door at south section , 2nd storyIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19284568
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at 2nd story public hall door at south section , 2nd storyIssued Oct 13, 2026 · fix by Oct 27, 2026 overdue · Violation #19284567
- COther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags (underneath) at staircase (south) at fire passage wayIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19277784
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 8, 2026 · fix by Nov 3, 2026 overdue · rent impairing · Violation #19277785
- CRoachesAbate the infestation consisting of roaches in the bathroomIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19108997
- BBroken doors or locksProperly repair or replace the broken or defective cabinet door west wall in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108996
- BBroken doors or locksProperly repair or replace the broken or defective glass pane at upper cabinet door west wall in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19109035
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19109034
- BBroken doors or locksProperly repair or replace the broken or defective glass pane at door in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108998
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108999
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 22, 2026 · fix by Jul 16, 2026 overdue · Violation #19025471
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 22, 2026 · fix by Jul 16, 2026 overdue · Violation #19025470
- BOther repairs& 309 m/d law abate the nuisance consisting of vegetation growing out of east exterior wall at 5th and 6th story (building rear)Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018050
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 22, 2026 · fix by Jul 16, 2026 overdue · Violation #19025472
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18962262
- COther repairsProperly repair with similar material the broken or defective ceramic floor tile in the kitchenIssued May 29, 2026 · fix by Jun 4, 2026 overdue · Violation #18962252
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2026 · fix by May 25, 2026 overdue · Violation #18853831
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2026 · fix by May 25, 2026 overdue · Violation #18853829
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued May 1, 2026 · fix by May 25, 2026 overdue · Violation #18853828
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2026 · fix by May 25, 2026 overdue · Violation #18853834
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2026 · fix by May 25, 2026 overdue · Violation #18853832
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18825987
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued May 1, 2026 · fix by May 25, 2026 overdue · Violation #18853830
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2026 · fix by May 25, 2026 overdue · Violation #18853833
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2026 · fix by May 25, 2026 overdue · Violation #18853827
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in vestibule at public hall, 1st story, section ''3140''Issued Oct 29, 2025 · fix by Dec 3, 2025 overdue · Violation #18328156
- BBroken doors or locksProperly repair or replace the broken or defective lock and latch set at building entrance door at public hall, 1st story, section ''3140''Issued Oct 29, 2025 · fix by Dec 3, 2025 overdue · Violation #18328158
- BOther repairsProvide marble saddle in the kitchenIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172059
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2025 · fix by Sep 13, 2025 overdue · Violation #18172053
- BOther repairsProperly repair or replace the broken or defective glass pane at the upper window sash in the bathroomIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18172056
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 30, 2025 · fix by Jul 6, 2025 overdue · Violation #18056132
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 18, 2025 · fix by Jul 14, 2025 overdue · Violation #18044058
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18036247
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at bathtub in the bathroomIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18036249
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at northIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18036260
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18036252
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18036254
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18036257
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18036266
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building enrtrance door (fire hazard) at public hall, 2nd story, section ''3140''Issued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17815612
- BOther repairsProperly repair with similar material the broken or defective all fire retardant ceilings and walls at all stys at public hall, section ''north''Issued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17748486
- CBroken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued Feb 4, 2025 · fix by Feb 10, 2025 overdue · Violation #17666888
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued May 14, 2024 · fix by May 18, 2024 overdue · Violation #16976043
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued May 14, 2024 · fix by May 18, 2024 overdue · Violation #16976044
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 19, 2024 · fix by Apr 2, 2024 overdue · Violation #16757029
- BOther repairsProperly repair with similar material the broken or defective sloping wood floor [ walking area ] in the private hallwayIssued Mar 12, 2024 · fix by Apr 16, 2024 overdue · Violation #16740540
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.